Complete Streets: Changing Policy 1 January 2013.

Slides:



Advertisements
Similar presentations
January 23, 2006 FAIRFAX COUNTY PEDESTRIAN TASK FORCE FAIRFAX COUNTY PEDESTRIAN TASK FORCE FINAL REPORT.
Advertisements

ODOT Pedestrian and Bicycle Program Sheila Lyons, PE Local Area Government Conference 2011.
1 ODOTs Complete Streets Initiative. 2 Tipping Point for Complete Streets.
1 Moving from policy adoption to implementation: National lessons in Complete Streets Laura Searfoss National Complete Streets Coalition Bike Maryland.
Complete Streets: Moving from introduction to local policy
An Overview of the Complete Streets Concept and a Review of NCDOT’s Proposed Complete Streets Guidelines PHC COMPLETE STREETS.
1 Complete Streets: Guide to Answering the Costs Question Companion Presentation, Part 3.
COMPLETE STREETS ROCHESTER, MINNESOTA September 28, 2011 Mitzi A. Baker, AICP Active Living Rochester Rochester-Olmsted Planning Department.
Updating Boulder’s work zone traffic control guidelines Marni Ratzel Bicycle & Pedestrian Transportation Planner GO Boulder/city of Boulder.
Complete Streets: Changing Policy March What are Complete Streets? 2 Complete Streets are streets for everyone, no matter who they are or how.
[Jurisdiction’s] Draft Complete Streets Policy Resolution
Developing & Implementing Master Bike & Pedestrian Plans Heleen Dewey Spokane Regional Health District March 2010.
ENSURING DRIVABILITY: CHALLENGES AND SOLUTIONS FOR AMERICA’S ROADS A survey of pavement officials and the driving public The Asphalt Pavement Alliance.
December 13, 2010 Developing Bicycle Performance Measures for Integrated Multi-Modal Corridor Management.
International Conference on Urban Traffic Safety Creating Complete Streets to Accommodate All Users Peter Lagerwey, Toole Design Group
Introduction to Complete Streets January What are Complete Streets? Complete Streets are streets for everyone, no matter who they are or how they.
 City of Mesa Council Presentation October 23, 2014.
Designing For Complete Streets In Nashville Metropolitan Government of Nashville and Davidson County, Karl F. Dean, Mayor John W. Lynch, Director, Department.
1 City of Rapid City and Rapid City Community Planning RAPID CITY BICYCLE AND PEDESTRIAN MASTER PLAN in collaboration with: Kadrmas, Lee and Jackson RDG.
Complete Streets Policy and Implementation Jason Ridgway February 11, 2014.
County Wide Active Transportation Study (CWATS) Master Plan Active Communities Summit – October 3, 2011.
Planning & Public Health “My Oh My” Spokane County Active Living Task Force Melissa Wittstruck-Eadie, AICP Planner City of Spokane, WA Heleen Dewey Health.
I n t e g r a t I n g C S S Practitioner Module 1 1 Module 1: Context Sensitive Solutions and Livability Overview.
Out of ‘ Site,’ Out of Mind Increasing Community Connectivity and Physical Activity through Healthy School Site Planning.
What is a Complete Street? A Complete Street is safe, comfortable and convenient for travel via automobile, foot, bicycle, and transit.
History of US Bicycle Routes In 1970’s interest in long distance bicycle travel proliferates.
DATS Bicycle Planning 2009 Bicycle Advisory Committee Kickoff Danville Area Transportation Study July 13, 2009.
Ontario by Bike Workshop April 16, 2015 Lambton College.
Navigating the Path to Complete Streets Strategies for Implementation January 30, 2014 RI League of Cities and Towns Annual Convention This Grow Smart.
Complete Streets for Planners MN APA Conference September 28, 2011 Ethan Fawley, Fresh Energy.
2013 Walking Summit 2013 Walking Summit Completing Our Streets: Tools to Get You Moving Laura Searfoss, Policy Associate, National Complete Streets Coalition.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Effective Transportation Planning City of Seattle, WA.
Briefing on a Draft Green Streets Policy for the National Capital Region Michael Farrell COG/TPB Staff Transportation Planning Board January 15, 2014 Item.
Transportation’s Role in Livable Communities Jana Lynott, AICP Senior Policy Advisor AARP Public Policy Institute.
Broward Complete Streets Technical Advisory Committee (TAC) Meeting Monday August 10, 2015.
Bike Walk Ambassador Program Workplace Outreach and Campaigns Photos and Bike Walk Ambassador Programwww.bikesbelong.org.
What are Complete Streets?What are Complete Streets? 1 Complete Streets are safe, comfortable, and convenient for travel for everyone, regardless of age.
Instructions  Check in with Andrew Bomberger at TCRPC to let him know what muni you will be visiting so he can give you any specific info for that muni.
1 Complete Streets: Guide to Answering the Costs Question Companion Presentation, Part 1.
Think Regionally - Act Locally The Development and Evolution of the I-95 Corridor Coalition: Think Regionally - Act Locally John Baniak Executive Director,
Introduction to Complete Streets in Wisconsin 1. What are Complete Streets?What are Complete Streets? 2 Complete Streets are safe, comfortable, and convenient.
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
City Leadership & Bike Edina Task Force Annual Work Session February 16 th, 2010.
Advancing bicycling through unified state and local advocacy organizations Thunderhead Alliance 50 States/50 Cities Project Complete Streets Pro Walk/Pro.
Effective Active Living Strategies – Tools to Improve Community Health & Vitality Carver County Active Living September 24 th, 10am Tracy Bade, Public.
Presentation title | Date. Who We Are Building a Healthier Heartland (BHH)  Super-coalition of local and national partners that promotes policy, systems.
Complete Streets Plan Philadelphia Vision Zero Presented by Raj Mohabeer PLA, ASLA, AICP, LEED®AP December 3, 2015 Detroit’s.
COMPLETE STREETS Local Model Policy June 10, 2015.
Using what we've got: Creating Community in the Street.
Complete Streets Training
District 11 CEAL Meeting: Bike/Ped Update SETH CUTTER DISTRICT BICYCLE AND PEDESTRIAN COORDINATOR APRIL 13, 2016.
2016 Active Transportation Plan Goals, Objectives & Criteria Bicycle and Pedestrian Facilities Advisory Committee March 2, 2016 meeting.
COMPREHENSIVE PLAN UPDATE MEETING 2 – TRANSPORTATION ELEMENT 12/12/2013.
2040 LONG RANGE PLAN UPDATE Congestion Management Process Plan (CMPP) Major Update February 24, 2016.
The Many Benefits of Complete Streets March
1 Introduction to Complete Streets March What are Complete Streets? 2 Complete Streets are streets for everyone, no matter who they are or how they.
Safe Routes to School Getting Started Locally Safe Routes to School
Urban Street Design Standards Overview of Project and Details
Complete Streets: Changing Policy
Complete Streets Award Program
Complete Streets in Minnesota
FHWA Bicycle and Pedestrian Program
Completing Our Streets: Tools to Get You Moving
Complete Streets A roadmap for all
Creating a Bicycle Friendly University
Accessible shared streets
Complete Streets The Bloomington/Monroe County Metropolitan Planning Organization Example Raymond Hess Road School March 9, 2011.
MPO Board Presentation
Presentation transcript:

Complete Streets: Changing Policy 1 January 2013

What are Complete Streets? Complete Streets are streets for everyone, no matter who they are or how they travel. 2

What are Complete Streets? Safe Comfortable Convenient 3

What are Complete Streets? Safe Comfortable Convenient 4

Complete Streets policies 5 Ensure that the entire right-of-way is planned, designed, constructed, operated, and maintained to provide safe access for all users

Complete Streets means: 6 High-level policy direction Change the everyday decision-making processes and systems Incremental approach Long-term results

Complete Streets does not mean: 7 One ‘special’ street project A design prescription A mandate for immediate retrofit A silver bullet; other issues must be addressed: Land use (proximity, mixed-use) Environmental concerns Transportation Demand Management

Policy adoption accelerates 8 Smart Growth America (2012). Complete Streets Policy Analysis 2011

Policies adopted at all levels 9 By the end of 2011: States : 28* MPOs : 33 Counties : 31 Cities : 268 Total : 359 *Including Commonwealth of Puerto Rico and the District of Columbia

Complete Streets is state law: 10 California Colorado Connecticut Florida Hawaii Illinois Maryland Massachusetts Michigan Minnesota New York Oregon Puerto Rico Rhode Island Vermont Washington Wisconsin

All types of communities Small Towns & Rural: 18.7% Small Suburb: 33.8% Large City: 9.4% Midsize City: 9.4% Small City: 11.1% Large Suburb: 5.8% Midsize Suburb: 11.9% 11 Smart Growth America (2012). Complete Streets Policy Analysis 2011

Why adopt a policy? 12 To change practice, integrating the needs of all road users into everyday transportation planning and design practices.

Why adopt a policy? 13 To gradually create a complete network of streets that serve all users. 

Why adopt a policy? 14 To save money: in the long run, retrofit projects always cost more than getting it right the first time.

Why adopt a policy? 15 To provide innovative transportation planners with the political and community support for doing things differently.

Why adopt a policy? 16 To apply solutions across a community and address systematic inequities.

Why adopt a policy? 17 To create fast, low-cost, and high-impact changes In your community.

Goal: Successful Policies 1.Sets a vision. 2.Includes all users and all modes. 3.Applies to all phases of all applicable projects. 4.Specifies and limits exceptions, with management approval required. 5.Emphasizes connectivity. 6.Is understood by all agencies to cover all roads. 7.Uses the best and latest design standards and is flexible. 8.Complements the community’s context. 9.Sets performance standards. 10.Includes implementation steps. 18

Vision 19 What do you want from your streets? What will consistently rally support from the general public and the elected officials?

All users & modes 20 A clearly stated directive to include the needs of all people, regardless of how they travel, into the everyday transportation decision- making process.

All projects & phases 21 Integrate Complete Streets into planning, planning, design, construction of all projects: New construction Reconstruction Rehabilitation Repair Repaving Major maintenance Operations

Exceptions 22 Provides flexibility, but must not be exploited. Three common exceptions: Where user groups are prohibited When the cost is excessively disproportionate to need and use Documented absence of current AND future need Additional exceptions weaken Complete Streets objectives.

Network & connectivity 23 More than one or two “complete” streets Connected, integrated system that provides for all users Ensures gaps are filled

Other agencies 24 Many agencies have a stake in the funding, planning, and development of our streets. Create partnerships Communication between jurisdictions and agencies at all levels

Design guidance & flexibility 25 Use the best and latest design standards available Allow for flexible approaches to design

Context sensitivity 26 Design relates well to type of neighborhood and buildings

Performance measures 27 Systematic collection and reporting of data Ensures compliance with policy goals Enables informed decision-making Short and long term

Tool: Policy Workshops Bring together stakeholders and decision makers Encourage open dialogue about challenges and solutions Outside expert instructors lend credibility, offer national expertise Develop appropriate policy for your community Understand common implementation steps, develop work plan 28

Tool: Policy Workbook Detailed discussion of & questions to ask at each step in developing a policy Right type of policy Understanding current process All 10 elements of ideal policy Planning for implementation 29

Tool: Policy Workbook Use in tandem with Policy Analysis Work with other stakeholders to answer questions, write language Draw from best practices, develop best language for your community 30

Tool: Policy Analysis Look up your policy & policies in similar communities Find highly-rated policies to serve as models Rate policy as you write it Use to inspire implementation activities around different elements 31

From Policy to Practice Effective implementation means: Organizing implementation activities Restructuring procedures, policies, and programs Rewriting or updating design guidance Offering training opportunities to transportation staff, community leaders, and the general public Creating new performance measures 32

Results: Seattle, WA 33 Through 2011: = 159 pedestrian countdown signals added = 174 school zones with signage added = 198 blocks of sidewalks added or repaired = 237 miles of bike lanes/sharrows added or repaired = 4,098 new trees planted = 43,600 additional hours of transit service secured 2011 population: 620,778 Area: square miles

Results: Charlotte, NC 34 Through October 2012: = 12.4 miles of road conversions completed = 40 miles of signed bike routes added = 40 miles of greenways & off-street paths added = 75 miles of bike lanes added = 80+ sidewalk improvements made 2011 Population: 751,087 Area: square miles

Results: Minneapolis, MN population: 387,753 Area: 58.4 square miles Through 2010 = 0.4 miles of sidewalks and crosswalks added = 17.8 miles of bike routes with sharrows added = 36.3 miles of bike lanes added

Results: Columbia, MO population: 110,438 Area: 60.4 square miles Through October 2012 = 1 signalized pedestrian crossing added = 3 miles of sidewalks paved = 5 major intersection improvements = 32 miles of bike routes with sharrows added = 86 miles of bike lanes added = 550 bike racks added

37 Washington, D.C.

38 Washington, D.C.

For more information 39 Fact sheets, photos, hand outs Information on changing policy Policy tracking & examples Complete Streets blog & monthly newsletter Links to research & publications

National Complete Streets Coalition Steering Committee 40 Benefactor AARP America Bikes American Planning Association American Public Transportation Association Blue Cross and Blue Shield of Minnesota National Association of REALTORS Smart Growth America Platinum American Society of Landscape Architects SvR Design Company Bronze Active Living by Design Alliance for Biking & Walking Association of Pedestrian and Bicycle Professionals Supporter America Walks Institute of Transportation Engineers League of American Bicyclists National Association of City Transportation Officials

Copyright & Use 41 This presentation is licensed under a Creative Commons license permitting non-commercial use with attribution. Any of these conditions may be waived with permission. For-profit organizations wishing to use this presentation should contact us at or For more information about this license, please visit:

Smart Growth America is the only national organization dedicated to researching, advocating for and leading coalitions to bring smart growth practices to more communities nationwide L St. NW Suite 250, Washington, DC |