4 th SAP Meeting, GRI SSE Milano, 4 May 2011 GRI South South-East Region.

Slides:



Advertisements
Similar presentations
4th Poverty Reduction Strategies Forum Athens, June 27 th, 2007 Regional Energy market in Southeast Europe: Prospects and challenges for the SEE countries.
Advertisements

1 Madrid, 2 nd Nov th IG Meeting South Gas Regional Initiative VI. MIBGAS.
Jean-Michel Glachant & Sergio Ascari Florence School of Regulation
1 TITRE Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11 th Stakeholder Group meeting GRI.
Completing the EU internal energy market IFIEC, 22 November 2011
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
Heinz Hilbrecht Director "Security of Supply and Energy Markets" European Commission - DG TREN , GRI NW, Amsterdam Regional Cooperation Role of.
GRI NW European Energy Work Plan 2011 – 2014 Programme Office RCC meeting, 15 September 2011.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
Completing the EU internal energy market
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Mark van Stiphout – DG TREN – C2 Internal market for electricity and gas The role of TSOs in the third package EUROPEAN COMMISSION GIE conference 7 May.
Update on GSE Activities Klaus-Dieter Barbknecht GSE President GIE General Assembly Madrid 21 November 2007.
Madrid Forum 15 October 2014 Massimo Ricci Chairman.
1 South Gas Regional Initiative Work Plan Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011.
Gas Regional Initiatives Getting to 2014 Steven Gordon Head of the Gas Department, ACER 8 th GRI Co-ordination Meeting Brussels, 27 th February 2012.
1 The Regulatory Approach to Fostering Investment David Halldearn Ofgem 28 September 2006.
Walter Boltz, Chair of ERGEG Gas Working Group 1 st workshop, Vienna, 3 December 2010 CEER vision for European gas target model.
Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.
Gas Regional Initiative North West Region - Gas Target Model - BNetzA/Ofgem Pre-Comitology Meeting Bonn – 26 May 2011.
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 24 th of April, 2009 Riga The 3 rd Package – implied changes.
Dr. Stefanie Neveling Bundesnetzagentur (Federal Network Agency), Head of Section „Access to Gas Transmission Networks and International Gas Trading” Problems.
10 th SG Meeting, GRI SSE Milano, 5 May 2011 GRI South South-East Region.
ENTSO-E’s Network Development Plans and Network Codes: How a strong European grid supports security of supply, affordable electricity prices through market.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Co-ordination of Decisions at Regional and European level.
The Regional Initiatives: Progress and Prospects Conference Brussels, 28 March 2007 Mr Walter Boltz ERGEG Gas Focus Group Chair Status Report of the Gas.
TSO progress towards ENTSOG IFIEC Energy Forum 22 Sep 2009 Jacques Laurelut GTE President & GTE+ Transition Manager.
Key Industry Challenges Regulatory Perspective Michael G. Tutty Chairman Commission for Energy Regulation 13 October
Sound Investment Climate? Jacques Laurelut GTE President CEO of GRTgaz Bratislava, 28 September 2006.
1 Gas Regional Investment Plan North West Europe GRI Meeting, November 25 th 2011.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
Electricity Regional Initiative Central Eastern European Region Market Entry Barriers – Regulators’ View Walter Boltz E-Control CEE Stakeholder Group Meeting.
Directorate General for Energy and Transport European Commission Directorate General for Energy and Transport Regulation of electricity markets in the.
Tom Maes, ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Transit contracts.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
Briefing on the energy market liberalisation and the current status Ulrich Bang, Director of European Affairs /
Walter Boltz Chairman, CEER Gas Working Group Enabling Markets Initial assessment of merging market areas & trading regions Gas Target Model.
European Commission views on intra-day and balancing markets
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 1 October, 2010 Jurmala ACER and regulatory empowerment.
Framework Guideline on gas balancing Martin Crouch, Ofgem 20th Madrid Forum September 2011.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
Vienna, 24 november GRI SSE: work done so far 1. Assessment summary on selected transportation routes ongoing 2. Preliminary paper on hubs as regional.
Northern Mini Forum Copenhagen, 27 June 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
CESEC Energy Community Project Monitoring
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
SOUTH SOUTH-EAST GAS REGIONAL INITIATIVE WORK PLAN Francesco Cariello, AEEG 20 th Madrid Forum, September 2011.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
Gas Regional Initiative Impact of the 3rd package & creation of RIG Benoît Esnault (CRE), GRI TF co-chair NW GRI – RCC and ministerial meeting Paris, 8.
European Developments Transmission Workgroup 1 st December 2011.
Michael Schmoeltzer Member of ERGEG Gas Working Group GIE Annual Conference, 6/7 May 2009, Groningen ACER & ENTSOG and their interaction.
ETSO-GTE Supporting a secure and liberalized European energy market A Joint Presentation by Mr Geert Joosten, GTE Mr Juha Kekkonen, ETSO 22 January 2003.
1 XVI Madrid Forum, 29 May 2009 XVI Madrid Forum Jose Sierra Madrid, 29 May 2009 Chair, RIG ERGEG Gas Regional Initiative Update & Progress.
Gas Regional Initiative South South-East
10 year investment plan ERGEG approach and contribution
ERGEG GRI South South East – , Maribor
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
ACER’s view on the future role of the Gas Regional Initiative
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
29th April 2014 Teleconference
Eurogas Views on a Conceptual European Gas Market Model
Walter Boltz Chairman, CEER Gas Working Group
Europe’s emerging energy and environment policy
Gas Regional Initiative South South-East
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
ACER’s view on the future role of the Gas Regional Initiative
Gas Regional Initiative South South-East
Presentation transcript:

4 th SAP Meeting, GRI SSE Milano, 4 May 2011 GRI South South-East Region

2 4 th SAP Meeting, Milan, 4 May 2011 Agenda Agenda TopicsRapporteur Arrival and registration 1. EU Gas Target Model and SSE regionCo-chairs 2. Future role of the Regional InitiativesCo-chairs 3. Energy Work Plan SAP 4. AoBCo-chairs

3 4 th SAP Meeting, Milan, 4 May EU Gas Target Model and SSE region

4 4 th SAP Meeting, Milan, 4 May 2011 Internal EU gas market What do we want to achieve? Internal EU gas market How we want to achieve this? First we need to enable functioning wholesale markets (“markets”), where they do not exist yet. As second step we need to connect these markets better to move forward to an integrated market. Basic conditions need to be established in all countries No one size fits all solution possible

5 4 th SAP Meeting, Milan, 4 May 2011 Overview of the MECO-S model for EU gas market integration Improve effectiveness by realizing economic pipeline investments MECO-S Model Pillar 1: Enable functioning wholesale markets Pillar 2: Tightly connect markets Pillar 3: Enable secure supply patterns Pillar 1: Structuring network access to the European gas grid in a way that enables functioning wholesale markets so that every European final customer is easily accessible from such a market. Pillar 2: Fostering short- and mid-term price alignment between the functioning wholesale markets by tightly connecting the markets through facilitating cross-market supply and trading and potentially implementing market coupling as far as the (at any time) given infrastructure allows. Pillar 3: Enabling the establishment of secure supply patterns to the functioning wholesale markets. Foundation: Improving the effectiveness of pillars 1 to 3 by making sure that economic investments in pipelines are realized.

6 4 th SAP Meeting, Milan, 4 May 2011 Where do we have functioning wholesale markets yet? Depending on the definition applied between 1 and 5 functioning gas markets exist in Europe today! Shall we strive to create 25 functioning gas markets? Will this foster competition in the retail markets? Would the German gas market have developed the same if we had not reduced the number of zones (~20) by merging them? Would the French gas market have developed the same if we had not reduced the number of zones (5) by merging them? Can markets be enabled without liquidity only via better connection?

7 4 th SAP Meeting, Milan, 4 May 2011 How to enable functioning wholesale markets? Different pictures all over Europe call for different approaches which are not mutually exclusive If a country is capable of establishing a functioning market itself the establishment of one (or two, based on C/B analysis) zone within this country is important (e.g. GB, Germany, France, Spain) If a country is not capable of establishing a functioning market itself (e.g. due to lack of liquidity or size) Cross-border market areas (full merger) is one solution, or Accession to a larger, already functioning market, or Trading Regions - a single cross-border zone for wholesale markets with congestion-free interconnection to national end- user zones.

8 4 th SAP Meeting, Milan, 4 May 2011 The Market Area Model Features: One virtual point for wholesale trading Fully integrated wholesale market One balancing zone from import points to final customers Full integration of DSO networks Single set of balancing rules Single balancing entity Symbols Virtual point of the market area serving as the sole marketplace of the market area Entry or exit contract Exit contract Market Area A Country A Country B Market Area AB Cross- border market area National market area VP Final customers (A)Final customers (B) VP Final customers (A) VP

9 4 th SAP Meeting, Milan, 4 May 2011 The Trading Region Model Country ACountry B Trading Region AB End user zone A End user zone B Final customers (A)Final customers (B) VP Legend and Symbols End user zone = National balancing zone for national final customers, no matter the system (distribution or transmission) they are connected to Trading Region AB = Cross-border entry/exit system including all nominated points on the transmission systems of countries A and B Entry or exit contract Exit contract Virtual point of the trading region serving as the sole marketplace of the trading region and all attached end user zones. Shifting of gas between trading region and end user zone is done by nominating a virtual exit on the VP. VP Features: One virtual point for wholesale trading Fully integrated wholesale market Trading region is basically kept free of imbalances Final customers are balanced in national end user zones that may reflect national specifics End user balancing may be done by national balancing entity Congestion-free interconnection between trading region and end user zones through the common virtual point (  virtual exit to end user zone)

10 4 th SAP Meeting, Milan, 4 May 2011 What needs to be done in all approaches? Prerequisite for merging market areas and creating trading regions: Absence or at least limited physical congestion As soon as we are talking about cross-border integration the following issues have to be analysed Entry / Exit Tariffication Redistribution of revenues and costs Alignment of regulatory framework Investments TSO as well as NRA cooperation

11 4 th SAP Meeting, Milan, 4 May 2011 MECO-S Model: Architecture at Large Legend and Symbols Hub to Hub capacity product and potentially market coupling Virtual point. VP Country ECountry F Trading Region EF End user zone EEnd user zone F Country CCountry D Market Area CD Market Area A Country A Market Area B Country B VP

12 4 th SAP Meeting, Milan, 4 May 2011 Common position of European gas industry associations on multi-system operation of TSOs

13 4 th SAP Meeting, Milan, 4 May 2011 The second step: connecting markets Connecting markets means price alignment between functioning markets and thereby driving market efficiency and public welfare on a European scale Connecting markets can happen at different timescales. In the afternoon session we will discuss a measure for short-term trading.

14 4 th SAP Meeting, Milan, 4 May Future role of the Regional Initiatives

15 4 th SAP Meeting, Milan, 4 May Tasks of the Regional Initiatives Majority of the respondents are in favour of the tasks proposed by the Commission (early) implementation of Network Codes Infrastructure development Test bed for new ideas Better alignment with follow-up to Infrastructure Package and Security of Supply Regulation is needed Doubts on market coupling as part of target model – more analysis needed

16 4 th SAP Meeting, Milan, 4 May Composition of the Regional Initiatives Most of respondents favour flexibility - no need for a legislative initiative Mixed views on the proposal to include Italy in the South Region Mixed views on the proposal to split the South-South East Region. More focussed agenda needed versus fear that split might be counterproductive in terms of efficiency. Coherence with infrastructure package needed Mixed views on overlapping countries

17 4 th SAP Meeting, Milan, 4 May Possible way forward for more consistency with infrastructure development regions BEMIP NORTH SOUTH Cooperation with Energy Community Cooperation with Norway

18 4 th SAP Meeting, Milan, 4 May Possible Way Forward on South Region(s) SOUTH WESTSOUTH EAST Potential merger once FR-SP interconnector is operational + cooperation with Switzerland

19 4 th SAP Meeting, Milan, 4 May Governance of the RIs Large support for stronger involvement of Member States Industry regulator dialog should remain driving axe Added value of Regional Steering Committee is questioned ; structures should remain lean and effective Stakeholders, including ENTSO-G, to be involved in decision making and not only in information sessions of stakeholder group Support for increased involvement of Commission and ACER Support for mandatory presentation of work plan to ACER

20 4 th SAP Meeting, Milan, 4 May Possible way forward for Governance Regional Coordination Committee Presidency: designated NRA or Commission NRAs ACER Commission Representative ENTSOG Representative Eurogas At least one meeting per year with Member States Stakeholder Group Implementation Group Ad hoc composition

21 4 th SAP Meeting, Milan, 4 May Preliminary conclusions Request to existing GRIs to send work program to ACER and Commission by September Commission could envisage to draft by end of the year interpretative note clarifying role and responsibilities of RIs, including governance and composition

22 4 th SAP Meeting, Milan, 4 May Summary of Coordination meeting with ACER The elaboration of concrete, ambitious, realistic and consistent roadmaps should be our top-priority for the next 2 months Their endorsement by all stakeholders, including MS, is essential More focused on projects than on regions When relevant, designation of a NRA to lead and report on each identified project should be promoted Close monitoring, transparency and effectiveness should be continuously looking for in order to maintain stakeholders' confidence

23 4 th SAP Meeting, Milan, 4 May Energy Work Plan Energy Council on February 4 th: “we will have achieved an IEM by 2014” Coordination meeting by Lead Regulators of ERI and GRI with ACER European Commission requested a 3 year Road Map (The Energy Work Plan) aimed at achieving an IEM by 2014

24 4 th SAP Meeting, Milan, 4 May Energy Work Plan Enabling functioning Wholesale Markets 2.Connecting Wholesale Markets 3.Enable secure supply patterns 4.Action Points and Pilot Projects The presented topics will be forwarded to ACER and the European Commission who then will combine the Work Plans from all regions in order to gather an overview of the pan-European Status-quo and to create an outlook for the next 3 years.

25 4 th SAP Meeting, Milan, 4 May Energy Work Plan Questions to SAP 1.Is it realistic to have one fully integrated market area? 2.In which MS of the region a fully functioning wholesale market can be established by 2014? 3.Alternatively, with which MS a closer integration would be necessary to achieve a functioning wholesale market by 2014? What will be the impact of merging market areas (eliminating capacity booking on some IPs)? 4.Which pilot projects to start with in order to establish this closer integration?

26 4 th SAP Meeting, Milan, 4 May Energy Work Plan Questions to regulators 5.Who is involved in the project? 6.Is the regulator taking the lead in this project? Questions collected right here and in written Communication – then a draft European Work Plan will be circulated in order to present it to the EC by end of June

27 4 th SAP Meeting, Milan, 4 May Energy Work Plan Action Points and Pilot Projects GRI-SSE-AP-1: Trading Points GRI-SSE-AP-2: Improvement of Hub-to-Hub Trading GRI-SSE-AP-3: Implementation of OBAs at IPs GRI-SSE-AP-4: Reverse Flow Investments GRI-SSE-AP-5: MS’ improvement of Regional Solidarity GRI-SSE-AP-6: TSO Regional 10 Year Network Development Plan (2012)

28 4 th SAP Meeting, Milan, 4 May AoB Probably – SoS meeting, beginning of December (one year after SoS Regulation) Polish Network Grid

29 4 th SAP Meeting, Milan, 4 May 2011 Closure Thank you very much!

30 4 th SAP Meeting, Milan, 4 May 2011 Michael Schmöltzer Head of Gas Department E-Control Austria +43(0)1 – / Contact