MTAC 114 Package Services Sub-Group Service Standards for Market Dominant Products Package Services and Standard Mail Parcels Sub-group Update June 13,

Slides:



Advertisements
Similar presentations
Managing Your Returns Process. 2 Remote Shopping is Growing  December 2002 NRF Sales Data  Direct retail up 18.1%  Store sales up 2.2%  More room.
Advertisements

MTAC WG 114 MTAC Workgroup 114 Service Standards and Measurements for Market-Dominant Products February 21, 2007.
MTAC General Session Meeting Electronic Verification System (eVS)/ Product Tracking System (PTS) User Group #2 February 16, 2011.
Price Change Effective April 26, 2015 Northeast Area Mailing Industry Focus Group Meeting February 25,
Mailer Barcode Quality Industry Best Practices MTAC November 6, 2002.
MTAC WG 114 MTAC Workgroup 114 Establish Service Standards and Measurement Update – May 16, 2007.
MTAC General Session Meeting Electronic Verification System (eVS®)/ Product Tracking System (PTS) User Group #2 Industry co-chair – John Medeiros Postal.
MTAC Workgroup 114 Establish Service Standards and Measurement First-Class Mail Measurement July 24, 2007 FCM Subgroup Meeting.
MTAC WG 114 MTAC Workgroup 114 Service Standards and Measurements for Market-Dominant Products April 12, 2007.
MTAC Workgroup 114 ® Establish Service Standards and Measurement Final Report MTAC General Session November 7, 2007.
FLAT MAIL PREPARATION OPTIMIZATION November 5, FLAT MAIL PREPARATION OPTIMIZATION Issue #81 MTAC November 5, 2003.
MTAC Workgroup 114 Periodicals Subgroup Update May 15, 2007.
FAST for Periodicals MTAC Workgroup 95 Washington, D.C. November 8, 2007.
® Service Measurement & Reporting Format MTAC November 7, 2007.
® MTAC Workgroup 114 Establish Service Standards and Measurement USPS Service Measurement Capability July 31, 2007.
Presentation of the Office of the Consumer Advocate,Postal Regulatory Commission MTAC Full Workgroup May 15, 2007.
MTAC WG 114 MTAC Workgroup 114 Establish Service Standards and Measurement Special Services Update July 11, 2007 Full Workgroup Meeting.
® Service Standards and Targets September 19, 2008.
® MTAC WG #135 Transportation Management Systems (TMS) Combined Data Limitations August 2010.
1 MTAC 117 Intelligent Mail Barcodes and Electronic Documentation Workgroup Update.
® Mail Technical Advisory Committee Workgroup 142 Industry Sponsor - Wendy Smith Industry Co-chair – Tom Underkoffler USPS Co-chair – Robert Raines.
® Intelligent Mail ® Barcodes for Reply Mail (Business & Courtesy) MTAC Workgroup 128 Jody Berenblatt, Industry Co-chair Linda Stewart, Postal Co-chair.
Optimizing Parcel Preparation & Entry for Seamless Acceptance Final Presentation MTAC Work Group # 109 Industry Leader: Wendy Smith USPS Leader: Jim Cochrane.
MTAC – Association Presentation August 1, P HARMACEUTICAL C ARE M ANAGEMENT A SSOCIATION About PCMA  The Pharmaceutical Care Management Association.
MTAC Workgroup # 83 First-Class Business Mail Measurement February 4, 2004.
1 PACKAGE VISIBILITY PROJECT Jim Cochrane & Gary Reblin Mailer’s Technical Advisory Committee.
U.S. Postal Service ® Product Development Presentation for MTAC Pritha Mehra Product Management.
® Customer Supplier Agreements Presented by Pritha Mehra Vice President, Business Mail Entry Friday, October 17, 2008.
Product Redesign MTAC Update February 6, PRODUCT REDESIGN Bob O’Brien – Industry Co-Chair John DePiazza Joe Lubenow Clarence Banks Robert Lindsay.
® 1 Exploring Marketplace Needs Through PCC Feedback.
MTAC Workgroup 106 Improve, integrate, and optimize data sources… Brian Euclide, Perry Judd’s Inc. Bob Galaher, USPS Marketing Nov 02, 2006 Washington.
MTAC Workgroup # 87 Update Improving the Drop Shipment Process Washington, D.C. May 18, 2006.
® Mail Technical Advisory Committee Workgroup 142 Industry Sponsor - Wendy Smith Industry Co-chair – Tom Underkoffler USPS Co-chair – Robert Raines.
MTAC WG 114 MTAC Workgroup 114 Service Performance Measurement Review and Discussion Full Workgroup Meeting July 31, 2007.
1 Service Standards & Measurement Status Report MTAC: February 18, 2009.
MTAC Workgroup 93 Streamlining Verification Debbie Cooper Bob Galaher Feb 22, 2006 Washington DC.
Improving the Drop Shipment Process MTAC Workgroup 87 Update Washington, D.C. August 2, 2007.
Optimizing Parcel Preparation & Entry for Seamless Acceptance MTAC Work Group # 109 Industry Leaders: Chris Finley & Wendy Smith USPS Leader: Jim Cochrane.
PSA and MTAC A Working Relationship November 2, 2005 Pierce Myers Parcel Shippers Association.
MTAC Work Group Report Service Assessment For Destination Delivery Unit (DDU) Drop Shipped Packages.
MTAC Work Group #82 Parcel Delivery Performance Measurement Effectiveness.
“In-Home Delivery” Instructions for Standard Mail MTAC Presentation February 05, 2003.
® Service Standards and Performance Measurement MTAC Workgroup 114 Status Report.
Association of Priority Mail Users, Inc Greensboro Drive, Suite 1070 McLean, VA (703) (phone) (703) (fax)
MTAC Workgroup 102 Update Advance Notification, Streamlined Acceptance & Visibility for First-Class Mail January 2008.
MTAC #107 Update November 1, 2006 Washington DC. MTAC #107 2 © 2006 Accenture. All rights reserved. Progress Goal  To provide key visibility points for.
Workgroup # 120 Communicating Entry Requirements/ In-Home Delivery Dates Solutions/ Seasonality Impacts INDUSTRY CO-CHAIR DALE MILLER POSTAL CO-CHAIR CHRIS.
® Secure Destruction Service Update Sam Pulcrano Vice President, Sustainability Jim Wilson Manager, Address Management MTAC Washington, DC November 18.
MTAC Workgroup 114 Establish Service Standards and Measurement Standard Mail Measurement July 30, 2007 Std Subgroup Meeting.
PostalOne! ® Workgroup #84 1 MTAC February PostalOne! ® Workgroup #84 2 Scheduled for April 3rd  Supporting Mail.dat 05-1  Testing server available.
1 Product Redesign MTAC Update November 5, Steering Committee Will Continue To Meet –Regular Updates And Feedback Regarding USPS Activity on Key.
® MTAC WG #135 Transportation Management Systems (TMS) Combined Data Limitations May 20, 2010.
MTAC Workgroup 100 Seamless Acceptance for MLOCR Environment Co-chairs Industry – Jay Gillotte USPS – Pritha Mehra.
MTAC Consistency Workgroup # 86 Update 1. MTAC Consistency Workgroup Workgroup Leaders Sue Taylor – (Industry Co-Chair) Prudential Michele Denny – (Postal.
Status for MTAC #123 Workgroup Service Information Needs, Reporting and Communication Channels.
Business Mail Measurement MTAC Workgroup Issue 60 May 7-8, 2003.
February 23, 2006 MTAC Workgroup #87 Improving the Drop Shipment Process Update.
MTAC User Group 1 Task Team 14 Status Update. Overview of the Task Team 14 Task Team Title: ―Electronic documentation solution that enables verification,
1 Service Measurement Status Report MTAC: November 19, 2008.
Management of Service Performance Measurement Workgroup #103 August 2, 2006.
1 MTAC 117 – Periodicals Subgroup  USPS Co-Chairs: Bob Galaher, Ruth Stock  Industry Co-Chair: John Stark  Objective: Identify any constraints and define.
Classes of Mail Module 3.
1 First Class MTAC Workgroup 102 November 1, 2006.
MTAC – November 2006 Mailers’ Technical Advisory Committee Address Location for FSS Work Group #101 November 1 st, 2006.
January 2017 Price Structure Considerations
USPS Pricing October 24, 2011 | 12:30 – 1:30 pm Eastern Time
Expand pictures to read slides
Confirm/PLANET Codes CONFIRM MTAC BRIEFING.
Price Change 2019 January 2019.
Intelligent Mail.
Presentation transcript:

MTAC 114 Package Services Sub-Group Service Standards for Market Dominant Products Package Services and Standard Mail Parcels Sub-group Update June 13, 2007 Full Workgroup Meeting

MTAC 114 Package Services Sub-Group Co-chairs  Tom Underkoffler, Medco Health Solutions, Inc.  John Gullo, USPS 1 Telecon Held Since May 15 Full Meeting  June 1  Next Telecon – June 15, 9-10:30 ET  Next Face to Face – July 15, 3:00 PM

MTAC 114 Package Services Sub-Group Mail Classes  Package Services – to be combined with Standard Parcels All sub-classes –Parcel Post, Bound Printed Matter, Media Mail, Library Mail  Standard Mail (Parcels Only) Special Services Merchandise Return Service (MRS), Bulk Parcel Return Service (BPRS), Delivery Confirmation (DC)

MTAC 114 Package Services Sub-Group Industry Data  Limited information provided Bookspan, Cornerstone  Majority of Industry Participants Drop Ship Mail  General Consensus Existing Standards Met Industry Expectations For Drop Shipped Parcels Concern Over Service Levels For Non-Drop Shipped Parcels  Standard Mail Parcels Have the Same Concerns Over Delivery Times as Package Services Mailers

MTAC 114 Package Services Sub-Group USPS Data  come.htm come.htm  Package Services Retail – 48% Parcel Select – 96%  USPS Operations Looking at Numbers How We Start the Clock Do Standards Meet Current Network

MTAC 114 Package Services Sub-Group Area Breakout  Standard Mail Parcels & Package Services Wendy Smith, PCH & Tom Underkoffler, Medco  Merchandise Return Services Richard Porras, Newgistics  Bulk Parcel Return Service Aaron Horowitz, Cosmetique  Delivery Confirmation Jim Callow / Ken Richardson, OCA

MTAC 114 Package Services Sub-Group Draft Version of package service standards

MTAC 114 Package Services Sub-Group DRAFT Proposals MRS  Service will be re-evaluated following revamping of MRS Delivery Confirmation  Scan Rate Service Standard – 99.1%  Inquiry Wait Time Service Standard – Web response 2 sec.  Scan Data Processing Time – TBD Signature Required –  TBD BPRS  TBD

MTAC 114 Package Services Sub-Group Next Steps  Analysis of proposed vs current standards  Possible ASF service standard  Review all final draft proposals at 6/15 meeting  Finalize proposals at 7/15 face to face meeting