What’s New for 2008? Healthcare Engineering Consultants Does the Joint Commission Manual Have Major Changes for 2008?

Slides:



Advertisements
Similar presentations
HIPAA and Joint Commission Requirements Compared and Contrasted
Advertisements

Appendix L, Ambulatory Surgical Centers Comprehensive Revision
2014 National Patient Safety Goals
Hospital Emergency Management
CODE REVIEW: DOH Article 28 Compliance Establishing a Feasibility process that is focused on compliance with New York State Department of Health rules.
Supervised by: Dr- Fatmah Baddar. 2 Health Care Service Accreditation Accreditation Accreditation is the process of assessing health institutions against.
© Copyright, The Joint Commission Quality Tools Available for Critical Access Hospitals December 16, :00-3:00pm CST.
Indiana Federation of Ambulatory Surgical Centers September 27, 2013 To promote and provide essential public health services.
ADULT DAY CARE Chapter 605 Survey Overview. Required Documentation When the surveyor(s) come to survey your Adult Day Care Center, they will ask you for.
25 TAC Quality Assurance in a licensed ASC
© Copyright, The Joint Commission 2008 National Patient Safety Goals.
HOSPITAL ACCREDITATION NUR 781, SPECIAL TOPICS IN NURSING PRESENTED BY: HUSNI ROUSAN SUPERVISED BY DR. ARWA OWIES JUST, 2002 / 2003.
Regulatory Agencies’ Impact on Health System Pharmacies Beverly Sheridan, RPh, JD Assistant Director Harborview Pharmacy Services
March 2011 The Joint Commission Survey Process Overview
Surviving Survey and Re-certification. Rural Mississippi Mississippi Stats ◦116 Hospitals ◦154 RHC’s (MSDH website) ◦28 CAH’s (35miles or “necessary.
Biggest Pitfalls and Best Practices in Emergency Management Healthcare Engineering Consultants Strategies for the 2011 Emergency Management Standards.
© Copyright, The Joint Commission 2013 National Patient Safety Goals.
by Joint Commission International (JCI)
Recommended by the Sentinel Event Alert Advisory Group NATIONAL PATIENT SAFETY GOALS FY 2009.
The Second Survey Point of Vulnerability How Should I Prepare for the Facility Tour? Healthcare Engineering Consultants.
Emergency Management CSHE Los Angeles Chapter 2013 Annual.
JCAHO UPDATE June The Bureau of Primary Health Care is continuing to encourage Community Health Centers to be JCAHO accredited. JCAHO’s new focus.
The Post-Survey Process George Mason University College of Nursing and Health Science Regulatory Requirements for Health Systems Summer 2004 Used with.
Accreditation Jill Humes, BSN, RN, Vascular Access Manager Renal Intervention Center, L.L.C.
The Preliminary Planning Session
Supporting Quality Care
“Crosswalking” Hospitals for a Healthy Environment (H2E) & the Joint Commission for the Accreditation of Healthcare Organizations (JCAHO) Catherine Zimmer,
HRSA SURGE CAPACITY DATA SURVEY TECHNICAL ASSISTANCE California Department of Health Services Emergency Preparedness Office.
© Copyright, The Joint Commission The Joint Commission: Deeming Authority and the Integrated Survey Process for Psychiatric Hospitals and the Special Conditions.
How to Get Started with JCI Accreditation. 2 The Accreditation Journey: General Suggestions The importance of leadership commitment: Board, CEO, and clinical.
The Expectation Triad Healthcare Engineering Consultants Regulatory Compliance: “Ensuring that all of the required standards are being met”
JCAHO Accreditation/Survey Process for Ambulatory Surgical Center (ASC) By F O HSCI 547 Fourth Assignment.
C A & Courtemanche & Associates HEALTHCARE SYNERGISTS.
FIRE DRILLS David McMahon, RS, MPH Phoenix Area Indian Health Service.
The Joint Commission’s 2011 National Patient Safety Goals.
Accreditation Standards George Mason University College of Nursing and Health Science Regulatory Requirements for Health Systems Summer 2004 Used with.
Changes and Challenges for “EC” in 2009 Presented by: Gary D. Slack, PE, CCE Healthcare Engineering Consultants Joint Commission.
Part 6: The Monitoring and Reporting Challenge Healthcare Engineering Consultants What is the most effective method to provide EC monitoring and reporting?
Understanding TJC 2009 Life Safety Code Chapter
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Inspection Policies and Procedures INSPECTION POLICIES.
The Survey Process in 2011 Healthcare Engineering Consultants Typical Survey Activities in 2011 will Include:  Communication to hospital by JC liaison.
Part 2: Meeting the Challenges of the Four Survey “EC Vulnerabilities” Healthcare Engineering Consultants Preparing for the Unscheduled Survey.
Copyright © 2016 Wolters Kluwer Health | Lippincott Williams & Wilkins Chapter 18: Design Considerations for Healthcare Information Systems Chapter 18:
The Accreditation Survey On-Site Agenda George Mason University College of Nursing and Health Science Regulatory Requirements for Health Systems Summer.
Guidance Training CFR §483.75(i) F501 Medical Director.
Part 4: Preparing for the EC Interview Healthcare Engineering Consultants The EC Interview Session.
1 Copyright © 2011 by Mosby, Inc., an affiliate of Elsevier Inc. Chapter 7 Health Care Regulatory and Certifying Agencies.
National Patient Safety Goals (NPSGs)
© Copyright, The Joint Commission 2015 National Patient Safety Goals.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
© Copyright, The Joint Commission 2014 National Patient Safety Goals.
Guidance Training (F520) §483.75(o) Quality Assessment and Assurance.
Part 5: Meeting the Challenge of the “EC Tracers” Healthcare Engineering Consultants How Should I Prepare for the “EC Tracer” Part of the Survey?
Laboratory equipment Dr. W. Huisman Cairo, November 21th 2012.
Introduction to JCI Standards &
NANCY CHOBIN, RN, AAS, ACSP, CSPM, CFER CHOBIN & ASSOCIATES CONSULTING HOT TOPICS IN STERILIZATION AND DISINFECTION.
NFPA 99 – 2012 Building a better medical gas maintenance program.
Safety Management Systems Session Four Safety Promotion APTA Webinar June 9, 2016.
QUALITY CARE/NPSG’S NUR 152 Week 16. OBJECTIVES Define quality improvement and the methods used in health care to ensure quality care. State understanding.
Governing Body QAPI 2013 Update for ASC
The Joint Commission’s 2011 National Patient Safety Goals
2017 National Patient Safety Goals
Fire Door Inspections Qualified Training
Brad Keyes, CHSP HFAP Engineering Advisor Jamie Crouch, BSBM, MHA
Quality Tools Available for Critical Access Hospitals
Emergency Preparedness Requirements
MAKING QAPI PAINLESS It doesn’t have to hurt!! Joan Balducci, RN, BS
TALA Annual Conference Surveyor Perspective related to the Licensing Standards for Assisted Living Facilities Galveston, TX April 1, 2019.
Presentation transcript:

What’s New for 2008? Healthcare Engineering Consultants Does the Joint Commission Manual Have Major Changes for 2008?

Organization of the 2008 Accreditation Manual Healthcare Engineering Consultants Section 1 - Patient Focused Functions  Ethics, Rights and Responsibilities (RI)  Provision of Care, Treatment and Services (PC)  Medication Management (MM)  Surveillance, Prevention and Control of Infection (IC) Section 2 - Organization-Focused Functions  Improving Organization Performance (PI)  Leadership (LD) - (includes previous governing body)  Management of the Environment of Care (EC)  Management of Human Resources (HR)  Management of Information (IM) Section 3 - Clinical Functions  Medical Staff (MS)  Nursing (NR) No Major Change! Note: Standards rewrite in 2009

What’s New for 2008? Healthcare Engineering Consultants What Will the Survey Process be Like in 2008?

Unannounced Surveys in 2008 Healthcare Engineering Consultants Typical Surveys Include:  Two to five days “on-site”  Two, three or more surveyors (usually nurses and physicians - includes a “Life Safety Specialist” for all hospitals in 2008; multiple days for >750K square feet  Review of documents (survey planning meeting)  Life safety-focused facility tour  Three-part “EC” interview  Questions to staff based on tracer methodology  Summary conference to present tentative findings

Unannounced Surveys in 2008 Healthcare Engineering Consultants Can Occur Due To:  Regular unannounced survey  Random off-cycle selection (5%)  Sentinel event follow-up  Adverse media coverage of specific issue  Complaint from the public Note: All new applicants for the accreditation process as well as changes to a new classification (example: critical access designation) will now have unscheduled surveys

What’s New for 2008? Healthcare Engineering Consultants What Scoring Rules Apply for 2008?

Joint Commission Scoring Guidelines Healthcare Engineering Consultants No major scoring changes for 2008, except SOC:  “EP’s” scored 0, 1 or 2 0 = insufficient compliance 1 = partial compliance 2 = satisfactory compliance  Scoring categories have been continued for each EP: A, B or C (B may be eliminated later!)  Standards are scored “compliant” or “non- compliant”  No grid score calculation  Rationale is not scored

Joint Commission Scoring for EP’s Healthcare Engineering Consultants Category A: usually used for policies and procedures or the presence or absence of a requirement Scored either “0” or “2” A “2” may become a “1” or “0” if the track record is insufficient Category B: used for process requirements If requirement exists, then process design and track record is scored (may be eliminated during 2008!) Category C: instances of non-compliance Score “2”: 1 or no instances of non-compliance Score “1”: 2 instances of non-compliance Score “0”: 3 or more instances of non-compliance

Joint Commission Scoring for EP’s Healthcare Engineering Consultants If any “EP” is scored “0”, the standard is not compliant If 65% of the EP’s are scored “2”, then the standard is considered “compliant”, unless any other EP is scored “0” (up to 35% of the EP’s may be scored a “1”!)

Special Scoring for SOC Deficiencies Healthcare Engineering Consultants  “X” is considered a minor deficiency Example: a fire door does not latch properly (item 1C2) – Score 1  “Y” is considered a midrange deficiency Example: the same fire door above is missing hardware (item 1C2) – Score 2  “Z” is considered a major deficiency Example: the building is not of an allowable type of construction (item 1A1) or each floor does not have at least two approved exits (item 5A) – Score 4 Note 1: Use the scoring grid and key to determine the X, Y and Z scores; 1-5 total score is partial compliance; 6 or greater is non-compliance, or a “Z” score! Note 2: Use of the BMP “caps” scores for each category at “1”

Joint Commission Scoring Decisions Healthcare Engineering Consultants Accreditation Decision Rules for 2008  Accredited (same)  Provisional Accreditation (same)  Conditional Accreditation (change) 10 or more non-compliant standards (< 100 ADC) 14 or more non-compliant standards (>100 ADC)  Preliminary Denial of Accreditation (change) 14 or more non-compliant standards (<100 ADC) 18 or more non-compliant standards (>100 ADC)  Denial of Accreditation (same)  Preliminary Accreditation (same)

“EC”-Related Scoring Rules Healthcare Engineering Consultants  Preliminary Denial of Accreditation (PDA) PDA01 - Immediate threat to health or safety PDA03 - Falsification of documentation PDA06 - Non-compliant standards 3 standard deviations above the mean (14 or 18 RFI’s)  Conditional Accreditation (CON) CON01 - Non-compliant standards count 2 standard deviations above the mean (10 or 14 RFI’s) Note: In 2008, will be 1.5 deviations above the mean CON03 - Failure to clear repeat non-compliant standards CON04 - Delayed PFI or no ILSM’s when required

What’s New for 2008? Healthcare Engineering Consultants Which Areas Have Historically Been the Lowest Scoring?

Lowest Scoring JC Areas Healthcare Engineering Consultants Percent Scored Not Compliant for Hospitals IM.3.10 (44%) – Information management MM.2.20 (36%) – Medications storage PC (29%) – Operative procedure planning EC.5.20 (19%) – Compliance with the Life Safety Code MM.3.20 (19%) – Clear medication orders IM.6.50 (15%) – Transcription of verbal orders IM.6.10 (15%) – Complete and accurate medical record PC.8.10 (14%) – Pain assessment and treatment PC (13%) – Definition of initial assessment time frame EC1.10 (12%) – Safety management risk assessment

Lowest Scoring “EC” Areas Healthcare Engineering Consultants Percent Scored Not Compliant for Other Facilities Assisted Living – EC.1.5 (33%) Fire prevention planning Assisted Living – EC.2.2 (33%) Security planning Assisted Living – EC.2.5 (33%) Fire prevention implementation Assisted Living – EC.1.4 (33%) Emergency planning Ambulatory Care – EC.4.10 (19%) Emergency management Behavioral Health Care – EC.4.10 (10%) Emergency management Behavioral Health Care – EC.4.20 (5%) Emergency drills Critical Access Hospital – EC.1.10 (10%) Safety risk management Critical Access Hospital – EC.7.10 (4%) Utility management

Lowest Scoring “EC” Areas Healthcare Engineering Consultants Percent Scored Not Compliant for Other Facilities Laboratory – EC.6.20 (11%) Equipment testing and inspection Long Term Care – EC.4.10 (18%) Emergency management Long Term Care – EC.9.10 (14%) Monitoring the environment Office Based Surgery – EC.4.20 (13%) Emergency drills Office Based Surgery – EC.1.20 (8%) Safe environment Office Based Surgery – EC.5.40 (8%) Fire equipment maintenance Home Care – EC.4.10 (20%) Emergency management Home Care – EC.4.20 (10%) Emergency management drills Home Care – EC.6.60 (7%) Medical equipment testing

What’s New for 2008? Healthcare Engineering Consultants What will be the Other Major EC Changes for 2008?

Possible Change for 2008 Healthcare Engineering Consultants 2006 AIA Document: Approval voted June, 2005 May be adopted by JCAHO in the future Available for purchase now! (AIA.org or ASHE.org) Multiple changes for single rooms, expanded ICRA, space revisions, HVAC changes, patient safety language, surge capacity information in Appendix

Other Changes for 2008 Healthcare Engineering Consultants Electronic SOC Document  All BBI’s and PFI’s must be electronically entered into the Joint Commission Connect site  Deadlines: BBI’s: 1/1/07 PFI’s: 9/1/07  Annual submission of SOC with PPR delayed!  Entered data will be “frozen” after approval by surveyor  PFI entries should be continuous  Password for organization will be required for data entry  Actual completion dates must be entered as they occur  Be sure to fill out forms, even if “No Deficiencies” on PFI  Download the data and put “hard copy” in notebook

Other Changes Continued for 2008 Healthcare Engineering Consultants Electronic SOC Document  PPR process will now include questions about the e-SOC  No longer “busted plan” – now termed “Non-Compliant”  e-SOC will track when completion dates are changed prior to approval by surveyor  PFI’s completed beyond 6 months of intended date may be cited under: EC.5.20, LD.2.20, LD.3.80 or LD.4.50  Can delete buildings on BBI, but not sites!  PFI summary uses the following colors: - Yellow for 4 months beyond intended completion date - Orange when beyond the 6-month grace period - Salmon when PFI completed after 6 months of intended date

Other Changes Continued for 2008 Healthcare Engineering Consultants Generator Run Tests (EC.7.40)  4-hour run at greater than 30% of nameplate load every three years; first due 7/1/07  Load test should be dynamic (actual hospital load), although the Joint Commission will accept load bank tests  Any 30% load test since July 1, 2004 will count and the next test will not be required until the 3-year anniversary date  Test failure requires interim measures until repairs are completed; successful retest is required after initial failure  All other existing generator tests still required; reference NFPA 110, 2005 edition  Simultaneous monthly, annual load bank and trienniel tests will count, as long as first 30 minutes are at 30%, rather than 25% of load (NFPA 70 panel does not yet agree!)

Expectations for 2008 Healthcare Engineering Consultants Sentinel Event Alert #37 Recommendations  Perform emergency power system gap analysis  Maintain complete, labeled, accurate inventory of loads served by the emergency power system (EPS)  Ensure competency training of staff who are responsible for the testing and maintenance of the EPS  Test generator fuel oil on an annual basis and filter or replace, as necessary  Communicate EPS capabilities and limitations to clinical staff and hospital management  Establish clinical contingency plans in the event of brief or prolonged failure of the EPS

Other Changes for 2008 Healthcare Engineering Consultants Operational Damper Tests  Re-inspection now every six rather than four years in hospitals; other occupancies still four years per NFPA  Change effective January 1, 2008  Result of move from NFPA 90A to NFPA 80 (fire dampers) and NFPA 105 (smoke dampers), the 2007 editions  For smoke dampers, the inspection shall occur one year after installation and then on a six-year basis  Inaccessible dampers should be placed on the PFI form and given a 6-year time period for completion; completion date can be extended after the 6-year period has expired

Emergency Management Healthcare Engineering Consultants What are the Newly-Adopted Changes for 2008? EC.4.11: Plans for managing emergencies EC.4.12: Development of emergency operations plan EC.4.13: Emergency communications strategies EC.4.14: Management of resources and assets EC.4.15: Strategies for managing safety and security EC.4.16: Management of staff roles and responsibilities EC.4.17: Strategies for managing utilities EC.4.18: Management of clinical and support activities EC.4.20: Implementation of emergency drills 2X per year Note: One drill requires external “non-support” simulation

Top “EC” Focus Areas for 2008 Healthcare Engineering Consultants  Patient Safety  Infection Control  Emergency Management (Katrina impact – 2008 changes)  Life Safety (life safety specialist surveyor change)  Risk Assessment

“EC”-Related Patient Safety Goals for 2008 Healthcare Engineering Consultants For Ambulatory, Behavioral Health, Home Care and Hospital Facilities Add Goal #13: Encourage patient’s active involvement in their own care as a patient safety strategy (define and communicate the means for patients and families to report safety concerns) Add Goal #15: The organization identifies safety risks inherent in its patient population (identify suicide risk – relates to patients being treated for emotional and behavioral disorders)

What’s New for 2008? Healthcare Engineering Consultants What Other Chapters in the Manual Will Impact EC in 2008?

Organizational Function Overview Healthcare Engineering Consultants  Human Resources (HR) Staff training, competency and performance  Leadership (LD) Compliance, resources, patient safety (LD.3.50, oversight of contracts/ services; 7/1/07)  Performance Improvement (PI) Data collection, aggregation, analysis, action  Information Management (IM) Data collection, aggregation, security  Infection Control (IC) Measurement and reduction of infections

What’s New for 2009? Healthcare Engineering Consultants What will the EC Chapter look like in 2009?

The 2009 EC Chapter Healthcare Engineering Consultants What will be the major EC changes? Mostly editorial changes Emergency management and life safety (not fire safety) will have their own chapters Staff competency (including for clinical staff) will be returned to the EC chapter Safety and security will be combined into one standard An entirely new numbering system will be used

Numbering the EC Standards Healthcare Engineering Consultants  EC.1.01 – Management Plan Requirements  EC.2.01, 2.03 – Safety and Security  EC.3.01 – Hazardous Materials and Wastes  EC.4.01 through 4.04 – Fire Safety  EC.5.01, 5.02 – Medical Equipment  EC.6.01 through 6.05 – Utilities Management  EC.7.01, 7.03 – Other Physical Environment  EC.8.01 – Staff Competency  EC.9.01 through 9.03 – Monitoring, Improvement

Understanding the Four “EC” Vulnerabilities Healthcare Engineering Consultants What are the Four Survey Points of EC Vulnerability for 2008?

The Four Survey Points of Vulnerability Healthcare Engineering Consultants  The Survey Planning Session  LSC Facility Tour  The “EC” Interview Session Involves all seven EC areas Documents and staff must be available Consists of three phases  “EC” Tracers

The Four “EC” Vulnerabilities Healthcare Engineering Consultants What is the Expectation Triad?

The Expectation Triad Healthcare Engineering Consultants Regulatory Compliance Performance Improvement Risk Assessment

The Expectation Triad Healthcare Engineering Consultants Regulatory Compliance: “Ensuring that all of the required standards are being met”

The Expectation Triad Healthcare Engineering Consultants Performance Improvement: “Attempting to measure and improve performance on an ongoing basis in the Environment of Care”

The Expectation Triad Healthcare Engineering Consultants Risk Assessment: “Prioritization and management of resources through an assessment of probability and impact”