Building Your LPFM Station Presented by John George.

Slides:



Advertisements
Similar presentations
Agricultural Mechanics Fundamentals & Applications Chapter 33Installing Branch Circuits.
Advertisements

Cabling UTP AND FIBER CABLING. Structured Cabling Infrastructure Mounted and permanent Allows patching Comfort that infrastructure is OK Components: Information.
Introduction. Introduction: Things to Prepare before Assembly Anti-static wrist strap Set of screwdrivers and pliers Piece of cloth CPU Thermal compound.
Videofied Product/Service presented by Cooperative Response Center, Inc.
Technician License Course Chapter 9 Lesson Module 22 Mechanical Safety.
Mounting instruction – Hi-Fi-Series – HE-01 / HE-02 Specification : Color: black / silver Measurement: 445 x 460 x 135mm (w x d x h) Material: all-aluminium.
Installation ARIA IP - 60.
Connector Installation Guide For Compression and Mechanical Connectors
Installation Instructions. Delivery Light fixtures, mounting structures and electrical components ship together Poles ship on a separate truck.
Corning Cabelcon 1. 2 To begin with – we need some tools… Cable cutter Cabelcon RG11 Rotary Stripper Mounting tools Compression tool Please read the instructions.
© 2012 DEHN + SÖHNE / protected by ISO Site visits to Botas Lightning and Surge Protection 1.
Antenna Installation. Installation Study the location antenna pattern Study the location antenna pattern Evaluate the most effective antenna in the location.
Technician License Course Chapter 9 Lesson Module 20: Electrical Safety.
A 2 element 6 Meter Quad Made from PVC pipe and capable
1 System Upgrades. This module reviews DIRECTV system upgrade instructions System Upgrades.
Residential Wiring Facts
Embedded Programming and Robotics Lesson 6 Mechanical Assembly 1.
TP4-ENERSOL-TD/PV double function
What is a Computer Network? Two or more computers which are connected together.
Guide to Network Cabling Fundamentals
Assembling a Computer Safety Precautions CPU Installation
Alarmline Linear Heat Sensor Typical Applications.
Minnesota BEST Kits Elliot Eid Minnesota BEST Robotics Copyright © 2010 BEST Robotics, Inc. All rights reserved. 1.
Submitted by Ravi Prakash PGT(Computer Sc.) KV39 GTC Varanasi
Wireless Fundamentals Lesson 2: Implementing A New Wireless System Bellevue Community College Bob Young, Instructor.
E8 / PPA Solar PV Design Implementation O&M Marshall Islands March 31-April 11, Field investigation Installation site confirmation Roof-mounted.
May Fiber Optic Technology Basics May 2008 WHY USE FIBER OPTICS?  Superior Signal Quality  Long Distance Signal Transmission  Protection from.
NCGS: Positioning NC today and for the future! North Carolina Geodetic Survey Maintenance of a CORS/RTN infrastructure.
Setting up the Ricoh C305 Press F5 to start the Presentation
Scripps Institution of Oceanography HF Radar Installation Info Tom Cook & Eric Terrill Scripps Institution of Oceanography University of California, San.
Site Construction & Installation Services
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
ROV Cameras. Extending Your Camera We want your ROV to be able to see the sea! (And the pool)
Minnesota BEST Kits Elliot Eid Minnesota BEST Robotics Copyright © 2010 BEST Robotics, Inc. All rights reserved. 1.
Copyright © 2010 Delmar, Cengage Learning. ALL RIGHTS RESERVED. Unit 34 Installing Branch Circuits.
MF Pad Considerations. Date: June 9, Hz Power Converter –The 400-Hz connectors installed on power pop-ups: The part number for the 400-Hz connector.
Ipswich City Precinct. 6. ICC Precinct Installation Standards & Regulatory Compliance ICT Infrastructure Integration & Convergence 1. Pit & Pipe Underground.
COMMUNICATION INFOTECH. MICROWAVE INSTALLATION Check on the power outlet box before beginning the installation to insure that outlet box is properly grounded.
1 UNIT 19 Data Security 2. Introduction 2 AGENDA Hardware and Software protect ion Network protect ion Some authentication technologies :smart card Storage.
1 UNIT 19 Data Security 2 Lecturer: Ghadah Aldehim.
Unit 3, Lesson 6 Conducting an Interview Video Shoot AOIT Digital Video and Digital Media.
Objective 39 Honors Geometry WP: Pythagorean Theorem.
ERICSSON MICROWAVE COMMISSIONING GUIDELINES
County of Grey Wireless Project Presentation to Finance and Personnel, Feb. 6/03 Presentation received, and directed to move forward. Update on test presented,
W. C. “Buster” Hounshell Spring 2002 SWITCHES.
User Manual FIBER OPTIC 2Ch Video LINK Fiber Optic 2Ch Video Link.
 Karen Jusely Alanis Dolores  Ivan Israel Guerra Mejia  Ruth Ariana Manriquez Cruz  Manuela Saenz Romero MADE BY!!!!
Wireless Network Planning Alberto Escudero Pascual Louise Berthilson IT +46 Unit 20.
Chapter 30 Electrical Wiring Copyright Goodheart-Willcox Co., Inc. May not be posted to a publicly accessible website. Define basic electrical terms.
LINDENBLAD CONSTRUCTION SEMINAR FOLDED-DIPOLE LINDENBLAD VERSION By Ron Herring W7HD Version dated 23-Oct-2016.
Scripps Institution of Oceanography HF Radar Installation Info Tom Cook & Eric Terrill Scripps Institution of Oceanography University of California, San.
ASSEMBLY/INSTALLATION INSTRUCTIONS ASSEMBLY AND INSTALLATION
Transfer of data in ICT systems
CAUTION GENERAL TOOLS REQUIRED ASSEMBLY AND INSTALLATION
Components of Computer
ASSEMBLY/INSTALLATION INSTRUCTIONS ASSEMBLY AND INSTALLATION
UNIT 19 Data Security 2.
SWITCHES W. C. “Buster” Hounshell Spring 2002.
CAUTION GENERAL TOOLS REQUIRED ASSEMBLY AND INSTALLATION
Smitty’s Super Speed Drill for Memorization No. 2
Towers and Antennas Tim Jellison W3YQ/KL7WV
Installation guide for RG6/59 compression connectors
MATERIALS Acer Monitor UTP cable cat 6 MWS MCT 9943
Setting up your computer
Installation guide for CX3 RG 7/11 compression connectors
A. Touching both terminals with the hands can cause electrical shock
Appalachian Underground Corrosion Short Course
Presentation transcript:

Building Your LPFM Station Presented by John George

Your CP has arrived-What next? Review you construction budget Confirm tower location and locate a qualified tower crew to install your antenna Determine where you will purchase equipment Order equipment- Get delivery dates! Have a secure storage location for equipment as it arrives

Mounting the antenna on a support pole will improve your coverage 60" (152 cm) tower face: 36" (92 cm) min

Carefully wrap all connections with waterproofing tape carefully following the instructions from the manufacturer. Be sure to ground the transmission line properly to the tower in several locations

Examples of Installs Metal Pipe Wooden Pole

Use RG-6 cable to connect the antenna to the EAS receivers Properly ground your cable to a known ground. Consider using Polyphaser lightning protectors.

Some things that will bring your rack together neatly.

Don’t forget the rack screws Speakers to monitor your audio Rack mount power strips

Some things that will bring your rack together neatly. Properly terminated audio connectors If your budget permits, consider “Studio Hub” connectors for your rack interconnects

Only needed if you are using an external processor and composite I/O Some things that will bring your rack together neatly.

Questions? John George