National Aeronautics and Space Administration www.nasa.gov 1 Rehab of Electric Propulsion Lab Controls, PH2 Site Visit Registry COMPANYPRIMESUBPHONE NUMBER.

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

Jim McElwain College Architect SETTING UP A LABORATORY.
New York City Department of Education Charter Matching – Facilities Upgrades/ Capital Improvements – FY 2014.
MULTIPLE PROFESSIONAL REVIEWS DOCUMENT SOLUTIONS Architectural and engineering review identifies building code and accessibility repairs needed. ($750,000.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Beneficial Occupancy Readiness Evaluation Plan Update Brian Heneveld, P.E., CIH NSLS-II BORE Coordinator Conventional.
Acme Industrial Mechanical, Inc. Capabilities Presentation Performance-Based Planned Maintenance Providing Leadership Quality Service for the HVAC Industry.
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
1 Institutional Support Services Capital Project Process.
1 BROOKHAVEN SCIENCE ASSOCIATES Site Preparation Lessons Learned Michael P. Bromfield, Construction Engineer Convention Facilities Advisory Committee Review.
AMBLER BOILER HOUSE REDEVELOPMENT AMBLER BH DEVELOPMENT PARTNERS, LLC RT ENVIRONMENTAL SERVICES, INC.
National Aeronautics and Space Administration 1 DEMOLITION PSL and AWT Les Main.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 114 September 18, 2008.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
National Aeronautics and Space Administration Explorers’ Guide to the Solar System 1 National Aeronautics and Space Administration
They also develop power- using machines such as refrigeration and air- conditioning equipment, machine tools, material handling systems, elevators and.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
National Aeronautics and Space Administration 1 NASA GLENN RESEARCH CENTER Tomorrow Begins Here!
PIP Update Linac Utilities for 2014 shutdown Matthew Gardner, 4/23/14.
The JINR engineering infrastructure is a multi component structure of the interacting elements. The following subsystems have the greatest effect on integrative.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
1 MICE-Video Conference Status of MICE Hall Contents: General status Electrical Mechanical Preparing for Steps II & III Risks and worries Andy Nichols,
Machine Advisory Committee Review APS Upgrade Installation Plan and Schedule John Noonan November 15, 2006.
Experts in Chem-Feed and Water Treatment Pre-Engineered Systems 1.
Lawrence Livermore National Laboratory This work performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities.
About Us  We are a group of Mechanical Engineers specialized in Construction & Engineering Services.  Our mission is to provide highest quality of construction.
Holland High School Construction Update June 8, 2011.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Steve Dierker Director, NSLS-II Conventional Facilities Division NSLS-II User Workshop July 17,
January 4, 2007 Project Overview RHIC II Project Internal Cost Review Roberto Than Cryogenics Systems January 4, 2007.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
Construction of a Transfer Station
Inspection Team Topic: Electrical Safety 9/15/2015.
Homestake DUSEL Project Management and Systems Engineering Richard DiGennaro LBNL April 20, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier NSLS-II Conventional Facilities Schedule Review December 13, 2006.
Energy Huntsville Opportunity Report and Government Collaboration February 2016.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Overview Scope & Schedule Marty Fallier Director for Conventional Facilities.
First discussion on MSS for Katrin March 26, 2013 M.Capeans CERN PH-DT.
Chilled Water Plant Overview From Project Concept To Operation July 26, 2007.
Ross Parkman PE Ryan Wester PE Central Chiller Plant Experience Big Ten and Friends Mechanical and Energy Engineering Conference October 1, 2013.
0 Design Change Construction & Completion Management (Outline and related procedures) Hanul NPP Engineering Center.
Green Labs Symposium | March 15, 2016 Travis Wanat, Senior project manager Department of Facilities Efficient building design and operation Fueling high.
The ABLE CompanyThe ABLE Company is a full service power plant equipment, instrumentation and control system specialist that has been providing dependable.
Gate Rehabilitation – Phase 1 NS09, NS10 and NS12 Contract C98045C03 Prebid Meeting – Technical Presentation May 9 th, 2013.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Schedule Steve Sawch Asst. Director, Construction Management CF Advisory Committee Review of the.
Update on the PSB Cooling and Ventilation Systems
HVAC Replacement Case Study
Introduction to Mechanical Engineering
Filter Rehabilitation and Seismic Upgrades – Construction Update
Cryoplant Installation Scope
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
Perris Water Filtration Plant Membrane Upgrade – Phase I
WP1 Metrology & Alignment
College II Tank Interior Recoating Award of Construction Contracts
Engineering Technology Division
Eastern Pennsylvania Laboratory Facility
Reach 4 Air Valve Replacements Award of Construction Contracts
ChE 473K Plant Design R. Bruce Eldridge.
Fleet Turnover Transitioning Your Contract With a Healthy Fleet Health.
LONGWOOD AT OAKMONT HEALTHCARE CENTER
Energy Huntsville Opportunity Report March 2017
Meeting of the LCLS Facilities Advisory Committee
Located at Tufts University in Boston, Massachusitts
Scope, Requirements Deliverables & Schedule
Overarching Commissioning Plan
Operator Training Requirements
Westmoreland Intermediate Unit
Conventional Facilities (WBS 1
Presentation transcript:

National Aeronautics and Space Administration 1 Rehab of Electric Propulsion Lab Controls, PH2 Site Visit Registry COMPANYPRIMESUBPHONE NUMBER McTech Corp QBS Inc.X Call Henry Inc.X Herbst Electric Analex RRAM North BayX Clark Mech. Inc.X Dunlop & JohnstonX ext 123 New Era Builders Fowler Co.X Soehnlen Piping Co.X Schworzer Dipplis Inc.X SiemensX VIP ElectricX

National Aeronautics and Space Administration 2 Rehabilitation of Electric Propulsion Laboratory Controls, PH 2 Bldg 301 November 2, 2005

National Aeronautics and Space Administration 3 Rehab of Electric Propulsion Lab Controls, PH2 Customer – Jim Zakany, Facility Manager for Vacuum Facilities NASA Design Team –Sue Gaudreau Project Manager –Pisal Satayathum Electrical Engineer –Greg Markus Electrical Engineer –Debbie Zamostny Research Facility Electrical Engineer – Lead –Stan Grisnik Research Facility Mechanical Engineer (Vacuum Sys Tech Lead) –Art Hugo Mechanical Engineer –Ray Franz Mechanical Engineer –Dennis Veverka Construction Manager –Carmela Bynum Alternate Construction Manger –Steve England Quality Assurance –Tony Schoeffler/Steve Hershman Safety –Trudy Kortes/Bill Howser Environmental –Paul Antczak Building Manager –Lori Conroy/Angel Pagan Buyers

National Aeronautics and Space Administration 4 Rehab of Electric Propulsion Lab Controls, PH2 Scope – –Upgrading vacuum tank VF6 programmable logic controllers and facility data equipment. Base Bid – –Demo electrical equipment, control and instrumentation for VF6 tank. –Provide and install programmable logic controllers, electrical equipment, and instrumentation on VF6 tank Option 1 – –Provide four (4) refrigeration units, cold traps, piping, controls and instrumentation (Material only) Option 2 – –Provide installation for material noted in Option 1.

National Aeronautics and Space Administration 5 Rehab of Electric Propulsion Lab Controls, PH2 Implementation –Contractor is responsible for installing, cut-over, and testing (mechanical, electrical, and instrumentation) for Tank 6 vacuum system including master annunciator, LN2 System and cooling tower water system. –Research impacts the window for Implementation. Start date for the shutdown of Tank 6 is 3/1/06 for 33 calendar days. IST (Integrated System Test) is the Government’s responsibility. Contractor to provide support for troubleshooting. –Prep work is crucial to complete prior to shutdown Run conduit and wire for electrical power, controls and instrumentation Mount new instruments

National Aeronautics and Space Administration 6 Rehab of Electric Propulsion Lab Controls, PH2 Implementation (cont’d) –Prep Work is crucial to complete prior to shutdown Remove CN41 through CN50 and infill floor. Install mechanical piping and electrical power and control (also miscellaneous subsystem piping Options 1 & 2) Rework existing control panels CN-1 through CN-7, CN-30 through CN-39 and CV-23 through CV-29. Rework shall include internal wiring.