Rehabilitation of Flat Creek, Teton County, Wyoming; Planning, design and implementation A cooperative effort between: Trout Unlimited, Jackson Hole Chapter.

Slides:



Advertisements
Similar presentations
Restore Lawyer Creek Habitat: Targeting Steelhead and Chinook Salmon.
Advertisements

Rehabilitate Newsome Creek Watershed BPA Project #
Implement Best Management Practices to Improve Riparian Habitat and Upland Conditions within the Medicine Lodge Creek Watershed Project No Sponsor:
LOWER SALMON RIVER Tributary Protection and Enhancement.
Lawyer Creek Steelhead Trout Habitat Improvement Project presented by: Lewis Soil Conservation District.
Upper Toppenish Watershed Restoration Project ( ) Yakama Nation Division of Natural Resources.
Little Canyon Creek Subwatershed Steelhead Trout Habitat Improvement Project Sponsored by: Lewis Soil Conservation District.
Rivanna Water & Sewer Authority Community Water Supply Plan Update Public Meeting Monticello High School September 21, :00 pm.
Robert Weber PA Fish and Boat Commission Fisheries Biologist Fish Management Division.
US Army Corps of Engineers BUILDING STRONG and Taking Care of People! Ecosystem Restoration Along the Los Angeles River: Creativity within Concrete Dan.
Capital Improvement Program City of Snoqualmie Public Works Department.
2009 City of Bozeman Storm Water Update
Status Update on Future Water Quality Strategies for the Refuge Kenneth G. Ammon, P.E., Deputy Executive Director, Everglades Restoration and Capital Projects.
Shingle Creek and West Mississippi Watershed Management Commissions Third Generation Watershed Management Plan.
Streamgaging Task Force Final Report Advisory Committee on Water Information Herndon, Virginia April 3, 2002.
Upper Providence Township Stormwater Management MS4 Program.
Project Collaboration In 1999, as a result of several years of monitoring of neotropical migratory birds such as the willow flycatcher, Jim Steele from.
Irrigated Lands Program Update – Sacramento River Conservation Forum Bruce Houdesheldt Director Regulatory Affairs Northern California Water Association.
City of Fargo Meadow Creek Area Flood Risk Management – Project 5944 Public Information Meeting June 21, 2010.
Highway Stormwater Runoff Patricia Cazenas Highway Engineer Water & Ecosystems Team Federal Highway Administration Washington, D.C.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
L-THIA Long-Term Hydrologic Impact Assessment Model ….provides relative estimates of change of runoff and non point source pollutants caused due to land.
Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research Program Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research.
Community-based Education K-12 students serving as a resource for meeting community needs.
Module 4: Getting Ready: Scoping the RI/FS. 2 Module Objectives  Explain the purpose of the scoping phase of the RI/FS  Identify existing data which.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
Morgan and Little Creeks Local Watershed Plan Totten Center, NC Botanical Garden 3 November 2004 Chapel Hill, NC
Low Flow Analysis & Water Use Plan Science & Community Environmental Knowledge Fund Forum June 10, 2004 Barry Ortman Diversified Technical Services Dawson.
Watershed-based Plan To Restore the Hackensack Meadowlands: The Meadowlands Comprehensive Restoration Implementation Plan Terry Doss and Karen Appell The.
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
May 5, 2015 Water Resources Meeting Heather Gutherless Jefferson County Planning & Zoning
Sonoma Ecology Center TMDL Implementation Project Update November 4, 2011 Funded by EPA, Managed by SFEP, Administered by MMWD, and north bay partnership.
Lakes District At Louisiana State University CAP 206 Project US Army Corps of Engineers New Orleans District.
2010 Yakima Basin Science & Management Conference Yakima River Basin Study June 16, 2010 Joel Hubble, Technical Projects Biologist Columbia-Cascades Area.
What is a Watershed? Goals for this module Discuss the goals and objectives of the project Discuss the goals and objectives of the project Learn who.
Los Osos Community Services District Basin Management Planning and Proposed Work Program June 5, 2008.
Chumstick Creek Salmon Habitat Conditions* Land development, road construction, and other human activities have affected channel migration and sediment.
Introduction to MS4 Stormwater Requirements (2009)
Comprehensive Flood Hazard Management Plan PUBLIC MEETINGS April 5-7, 2010 Rochester, Montesano, and Chehalis.
Marin Coastal Watersheds Permit Coordination Program Marin Resource Conservation District U.S.D.A. Natural Resources Conservation Service Sustainable Conservation.
North Bay Climate Adaptation Initiative
Western Lake Erie Basin Partnership Presented by: Name, Title Your Organization DATE YOU PRESENTED The Meeting you presented at.
Climate Change and Water Resources Planning Kim Shugar Department Director Intergovernmental Programs Kim Shugar Department Director Intergovernmental.
Timeline Impaired for turbidity on Minnesota’s list of impaired waters (2004) MPCA must complete a study to determine the total maximum daily load (TMDL)
Laguna Creek Watershed Council Development of the Laguna Creek Watershed Management Action Plan & It’s Relevance to the Elk Grove Drainage Master Planning.
Clinton Lake Sedimentation Earl Lewis Kansas Water Office.
10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002.
Channel Rehabilitation Projects TAMWG - June ‘04 Trinity River at Hocker Flat 1/16/2003.
Addressing the Sediment Problem in Sonoma Creek Watershed Rebecca Lawton 1, Deanne DiPietro 1, Laurel Collins 2, Arthur Dawson 1 1 Sonoma Ecology Center,
October 28, 2015 Yuba River Development Project Slide 1 Licensee Response to Relicensing Participant Tunnel Closure Proposal Yuba County Water Agency Yuba.
An Overview of our Community’s Stormwater Management Program
State of the Streams Loudoun County: 2005 Loudoun Strategic Watershed Management Planning Conference February 23, 2006 Presented by: Darrell Schwalm Loudoun.
Marin County Watershed Stewardship Program Marin County Department of Public Works.
Watershed Stewardship Program Status of Marin County Public Works Watershed Program 11/7/08 11/7/08.
STRATEGIES FOR FRESHWATER. CONTEXT FOR STRATEGIES.
I RIS E NVIRONMENTAL Independent Review of Documents Pertaining to the Lehigh Southwest Cement Permanente Facility Rob Balas & John McLaughlin February.
North Creek Water Quality Prepared by Jon Rogers and Carie McCoy.
CVFPB Executive Committee Meeting – Agenda Item No. 8A Central Valley Flood Protection Board.
General Water Obstruction and Encroachment Permits Presented by NCRO Watershed Management Program.
Obion Creek Stream Restoration Restoration of a Channelized Straight-line Ditch to a Naturalized Meandering Stream Presented by Robert B. Johnson Jackson.
Water Management Options Analysis Sonoma Valley Model Results Sonoma Valley Technical Work Group October 8, /08/2007.
Yolo Bypass Salmonid Habitat Restoration & Fish Passage Environmental Impact Statement Environmental Impact Report Information Presentation to YBFEPT July.
IMPLEMENTATION UPDATE Rice County Local Water Management Plan BOARD PRESENTATION JUNE 16, 2015.
Source: Stream Corridor Restoration Manual WATERSHED MANAGEMENT.
GOOSE CREEK WATERSHED LEVEL I STUDY SCOPING MEETING
Bridges Reach analysis Fundamental tool for design
Middle Fork Project Overview of 2008 Technical Study Plan Implementation April 21, 2008.
Identifying Barriers to Fish Passage in Mason County
Quantifying Flow Reduction Benefit of the Miners Ravine Off-Channel Detention Basin Using HEC-HMS
Hamilton Township, Mercer County, NJ Hydrologic Evaluation and Water Resources Recommendations For Planning and Implementation Rutgers Cooperative Extension.
Presentation transcript:

Rehabilitation of Flat Creek, Teton County, Wyoming; Planning, design and implementation A cooperative effort between: Trout Unlimited, Jackson Hole Chapter Teton Conservation District Town of Jackson Teton County Wyoming Game and Fish Department HabiTech, Inc Others

Project Goal Reduce icing and winter flooding of Flat Creek through stream improvements which allow the creek to approach its fisheries and ecological potential

Project Tasks PHASE 1: Conduct a planning and feasibility study to determine the aquatic habitat limitations of Flat Creek and recommend likely concepts and strategies for rehabilitation; PHASE 2: Conduct a detailed siting and design study leading to the recommendation of specific rehabilitation treatments and the submittal of necessary documents to the appropriate state and federal agencies for permitting purposes; PHASE 3: Implement the recommended and permitted rehabilitation treatments and provide a post implementation evaluation.

Project Priorities 1.Winter icing and flooding; 2.Discontinuing thaw well use and not adding additional thaw wells; 3.Storm water runoff storage in stream banks and sediment load management; 4.Fish habitat

Project Priorities

What’s been done to date? Completion of 2 reaches Monitored & Analyzed Results on first 2 reaches –1 st reach flood –2 nd reach with stood coldest winter in recent history Preliminary design of Karnes Meadow Reach Site specific survey and hydraulic modeling Development of improvement concepts

Reach #1 Downstream of Hwy 191 to High School Road

No Frazil ice production during extreme cold (-10°F) Surface Ice Formation

Reach #1 Downstream of Hwy 191 to High School Road Flood What did we learn Will it happen again

Reach #2 Downstream of Saddle Butte Bridge to Hwy 191

Reach #3 Karnes Meadow