Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS.

Slides:



Advertisements
Similar presentations
1. The preserver upstream. 2. The preserver downstream
Advertisements

Changes to the St. Louis Hydrologic Service Area Mark Fuchs Service Hydrologist.
Lowermost Pajaro left-bank bench vegetation just downstream from Thurwatcher Bridge.
The Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DPWH STRATEGIC INFRASTRUCTURE POLICIES AND PROGRAMS 1 Secretary ROGELIO L. SINGSON.
18 October 2012 WATERSHED Science & Engineering WEST Consultants Chehalis River Basin Hydraulic Modeling and Flood Relief Alternatives Evaluation.
3 rd IMPACT WORKSHOP Brembo-Adda test case Fabrizio Savi, University of Rome “La Sapienza”
Application of the Continuous Slope-Area Method for Determining Stream Discharge and Development of Rating Curves in Ephemeral Channels Navajo Nation Hydroclimate.
The Way Forward – A 21 st –Century Transportation Plan Frank DePaola, P.E. Administrator, Highway Division April 2013 Massachusetts Department of Transportation.
Sediment & Hydraulic Challenges in the City of Livermore December 11, 2008 Sediment Forum Alameda Creek Watershed.
ABOUT ILOILO RIVER. BEFORE THE SPANISH REGIME Channel of Trade - a busy artery of commerce & instrumental in the economic development of several important.
Rural Settlement Patterns
Proposed State Highway Projects: Kendall County September 20, 2007 Region 2/District 3 Illinois Department of Transportation.
Drainage Services Department Drainage Project Division Contract No. DC/2007/01 Contract Title: Drainage Improvement Works in Ki Lun Tsuen, Kwu Tung, Ma.
Bass Creek Watershed Road Stream Crossing Survey Survey conducted by Janice Tompkins and Mary Sievert, MDEQ during August and September of 2003.
Channel Repair of Montezuma Creek in Coronado National Memorial following Fire and Flood Damage Stephanie Yard, P.E. & Allen Haden, Aquatic Ecologist Natural.
Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI Aerial Photos Taken April 1, 2009 By.
1Chapter 9-4e Chapter 9. Volume Studies & Characteristics Understand that measured volumes may not be true demands if not careful in data collection and.
SMOKEY MOUNTAIN PROJECT, BALUT, TONDO MANILA MODEL UNIT.
Stage – Discharge Rating Numerical relationship between water elevation (stage) and discharge at a location in a flowing system. Expressed as an equation,
Aerial view of Missouri Boulevard, Jefferson City. Five-Lane With Two-Way Left- Turn Lane and High Driveway Density. Missouri Boulevard Ground Level View--Strip.
Section 3: The Spanish Return to Texas
1 Ministry of External Relations Department of Trade and Investment Promotion Investments Division Investment Opportunities Brazil-China.
Route CC bridge replacement over Caulk’s Creek. What is the problem? Large debris consistently collects on the upstream end of the bridge. This causes.
University of Miskolc Faculty of Economics Institute of World- and Regional Economics 1 Regional disparities of the transport infrastructure in Northern.
Ali Nabavi Project Manager Information Technology Fulton County Government Atlanta-Fulton Public Library System Capital Improvement Program.
San Simeon Earthquake Ground Deformation Photos by California Geological Survey.
S.Y UNDERGROUND RIVER PALAWAN(LUZON) A world heritage site inscribed by the UNESCO, this natural wonder features an 8.2 km. navigable underground.
赴国际水稻所访学情况汇报 长江大学农学院 邢丹英 2010 年 6 月. 学习目的 学习时间、地点 学习内容 学习收获 几点体会 汇报提纲.
(1) Vijaynagar-Taila Motor Road. (i) Damage of R/wall (Km 1-9 &
Kalibo, Aklan Philippines Typhoon Frank June 2008.
1.Look at the pieces of the picture. 2.Can you guess what is in the picture?
An Experience In Conducting A Longitudinal Profile… A Study of the Response of San Pedro Creek to the US Army Corps of Engineers (USACE) Flood Control.
Project IDAgencyTitleRelevant Project ComponentCompletion Date LAE0332City of Long BeachLong Beach Park & Ride LotPRL with 400 parking spacesJune, 2014.
Back on Track The role of the railway station boulevard in perspective MobKos II - Mission 2 - September Kobe Boussauw.
Are You a Smart 4 th Grader? Geography 1 What are the 5 themes of Geography?
In connection with the observance of World Health Day Celebration With the theme “ Safe Hospitals: Protect Health Facilities in Emergencies” The Western.
Preparations for the 2010 PALARONG PAMBANSA
A. American Settlers Move to Texas
Spanish treatment of Cubans was brutal. Spanish treatment of Cubans was brutal. The Maine was a U.S. battleship sent to protect our interests. It.
Find out why people say the Southern states are different from the rest of Brazil.
Ped/Bike Crossing to Pigs Eye Presentation by the District 1 Community Council.
1835 to 1836 By Rachel Kelly Period 6.  The War was an armed conflict between Mexico and the settlers in the Texas portion of the Mexican state of Coahuila.
Maps of Alaska Mapping Activity 6 Regions of Alaska.
Cycles of Change: Part II The Ventura River: before and after the big storm In the three weeks following Christmas, the South Coast was hit with a series.
Location Allowance Components Salary Administration- HDBP LifeBank Foundation, Inc August 6, 2013.
Investment opportunities in public infrastructure
南水北调东线第一期工程山东段 情况简介. 主要汇报内容 二、南水北调山东段工程总体布置 三、山东段工程项目划分及工程主 要建设内容 一、南水北调东线工程概况 四、前期工作及工程建设进展情况 五、工程总投资.
State of play of Corridor X Technical Secretariat Pan-European Transport Corridor X REPUBLIC OF GREECE MINISTRY OF INFRASTRUCTURE, TRANSPORT AND NETWORKS.
This presentation was given by, Manfred Kittel, CDFW, at a meeting of the Statewide Coho Recovery Team, June 26-27, 2013.
Cebu Philippines Cebu Essay Administrator Prepared by:
San Mateo Bridge Replacement Project Caltrain Replaces Four 100-Year-Old Rail Bridges May 2, 2013.
Camp Francisco S. Macabulos, Tarlac City
CITY OF LA PUENTE VALINDA COMMUNITY BIKEWAY PROJECT
ABANDONMENT OF A PORTION OF A PUBLIC UTILITY EASEMENT RANCHO SAN MIGUEL MARKET June 21, 2005 Agenda Item 9.01.
May, 1999 Bridges This module will cover bridges and how they are input into HEC-RAS. 9/21/2018.
San Dieguito Lagoon Inlet Dynamics and Maintenance
11/20/2018 Culverts Culverts are the same as bridges as far as locating cross sections 11/20/2018.
Chapter 6: The Spanish Missions Section 3: The Spanish Return to Texas
Environmental Advisory Committee Meeting
Budapest the metropolis
ATM PAYROLL IMPLEMENTATION IN DepED. ATM PAYROLL IMPLEMENTATION IN DepED.
TYPES OF MAPS SOCIAL SCIENCES UNIT 1: OUR WORLD YEAR 3
What do you know about ground water and surface water?
Велики откриватели и пътешественици
Identification of Access Management Problem Corridors With
AESTHETIC EVALUATION of URBAN WATERCOURSES
ES Waterfall Bridge.
Rail Program Management Services Review Grade Separation Recommended Ideas Palo Alto Rail Committee Meeting ……..
Pre-K Classes in San Antonio | Pre-K San Antonio | Discovery World Learning Center
November Bond Election
Presentation transcript:

Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

ILOILO RIVER BATIANO RIVER CALAJUNAN CREEK DUNGON CREEK MAMBOG CREEK-JIBAO- AN RIVER CABALUAN RIVER Pavia Sta. Barbara San Miguel Oton River Systems Iloilo City Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

ILOILO RIVER ILOILO RIVER ILOILO RIVER ILOILO RIVER City Proper Molo Arevalo Oton Carpenter’s Bridge Diversion Bridge Jalandoni Bridge Forbes Bridge Quirino Bridge Sooc Bridge Mohon Bridge Lambuyao Culvert ILOILO RIVER

Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Upstream of Batiano River Poblacion Oton Brgy. Alegre OtonBrgy. San Nicolas Oton Brgy. Sta Cruz Arevalo Brgy. Sto Nino Sur Arevalo Brgy. Sto Nino Sur Arevalo (near JBLMU) Brgy. Sto Nino Norte Arevalo (downstream Yulo Br.) Brgy. Calaparan ArevaloBrgy. Calumpang Molo Brgy. San Juan MoloBrgy. Boulevard Molo (upstream of Batiano Brd.) Brgy. Boulevard Molo (downstream of Batiano Brd.) BATIANO RIVER

Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS City Proper Molo Arevalo Oton ILOILO RIVER IMPROVEMENT (Dredging and Excavation) 9.33 Km Quirino Br. Mohon Br. Trenas Boulevard Forbes Br. Jalandoni Br. Carpentr’s Br. Sooc BridgeBr. Lapaz Mandurriao (Dredging and Excavation)

SECTION 6 (ILOILO BRIDGE - CARPENTER BRIDGE) Length: 2.26 Volume : 76,640 m 3 SECTION 6 (ILOILO BRIDGE - CARPENTER BRIDGE) Length: 2.26 Volume : 76,640 m 3 SECTION 4 (FORBES BRIDGE - JALANDONI BRIDGE) Length: 1.84 km Volume : 111,420 m 3 SECTION 4 (FORBES BRIDGE - JALANDONI BRIDGE) Length: 1.84 km Volume : 111,420 m 3 SECTION 2 (QUIRINO LOPEZ BR. - MUELLE LONEY BR.) Length: 1.48 km Volume : 51,760 m 3 SECTION 2 (QUIRINO LOPEZ BR. - MUELLE LONEY BR.) Length: 1.48 km Volume : 51,760 m 3 SECTION 1(ARROYO TO QUIRINO LOPEZ BR.) Length: 0.47 Km Volume : 100, 000 m 3 SECTION 1(ARROYO TO QUIRINO LOPEZ BR.) Length: 0.47 Km Volume : 100, 000 m 3 ILOILO – ANTIQUE ROAD GENERAL LUNA STREET ILOILO – ANTIQUE ROAD GENERAL LUNA STREET IZNART STREET ARROYO STREET MUELLE LONEY STREET ILOILO DIVERSION ROAD R. MAPA STREET TREÑAS BOULEVARD ILOILO RIVER ILOILO RIVER ILOILO RIVER ILOILO RIVER ILOILO RIVER DUNGON CREEK Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REGION VI – WESTERN VISAYAS SECTION 5 (JALANDONI BRIDGE - ILOILO BRIDGE) Length : 0.81 Volume : 89,210 m 3 With exception Volume : 45,492.5 m 3 SECTION 5 (JALANDONI BRIDGE - ILOILO BRIDGE) Length : 0.81 Volume : 89,210 m 3 With exception Volume : 45,492.5 m 3 SECTION 3 (MUELLE LONEY BR. - FORBES BRIDGE) Length: 0.12 km Volume: 8,440 m 3 SECTION 3 (MUELLE LONEY BR. - FORBES BRIDGE) Length: 0.12 km Volume: 8,440 m 3 SECTIONVOLUME OPERATIONAL COST TOTALDURATION DREDGINGHAULING STATION 1TO BE DREDGED BY DREDGE VISAYAS II STATION 251, M6.21 M7.76 M5 mo. STATION 38, M1.01 M1.26 M1 mo. STATION 4111, M13.37 M16.71 M10.5 mo. STATION 543, M5.25 M6.56 M4.2 mo. STATION 676, M9.20 M11.50 M7.3 mo. T O T A L291, M35.04 M43.79 M28 mo.

Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS 2.5km Oton CONSTRICTED PORTION FROM MOHON TO MAMBUG OTON Mohon Arevalo Lambuyao Culvert Mohon Bridge San Nicolas Oton San Antonio Oton Mambug Oton

Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Oton DUNGON CREEK IMPROVEMENT (Dredging and Excavation) LAPAZ MANDURRIAO JARO City Proper Molo Arevalo 4.59 Km Unworkable Area Due to presence of Formal and Informal Settlers and Mangrove Vegetation Cuartero Jaro Bolilao Br. Mandurriao Sta Rosa Mandurriao

Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Oton CALAJUNAN CREEK IMPROVEMENT (Dredging and Excavation) LAPAZ MANDURRIAO JARO City Proper Molo Arevalo 5.40 Km Calajunan Mandurriao

Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REGION VI – WESTERN VISAYAS