ST. PETER CLAVER SCHOOL: THE NEW VISION! A FIVE YEAR VISION.

Slides:



Advertisements
Similar presentations
Created by: Theresa Hardy My School Its Location.
Advertisements

Crescent Academy International
The Greenwood Apartments a partnership between Banc of America Community Development Corporation and Clearwater Neighborhood Housing Services, Inc.
IIT – Bailey Hall – Graduate Student Housing – Existing Conditions
Classroom 1. Mission San Luis Rey.
Building for Learning Project Photo Progress Report October 2009 Project commencement 21 st September 2009.
Library/Media Center Presentation Room - Budget Proposal By Jennifer LeMaster and Matt Dockery.
INTRODUCTION Our school is called “Escola Montsant”.
Measure G Information August 2014 Enhancing Educational Opportunities at every school in Norwalk and La Mirada.
N EXISTING FACILITIES BUILDING “A” -Principal’s Office -Workroom -(9) 3 RD Grade Classrooms - (4) 4 TH Grade Classrooms -Life Skills Classroom -Title.
Information Technology Development Center FLAGLER COUNTY FLORIDA ENGAGING IN THE WORLD WIDE ECONOMY.
Wilson School Construction 2014 Tearing out the old courtyard to put in the new sewer line.
Barnstable Public Schools Integrated Preschool Presentation Town Council Meeting November 20, 2014 Phases II and III.
COMMUNITY HEALTH FUND Best Practices in Tanzania Workshop Singida District Council Juma H.Tantau CHF Coordinator.
Tuesday, October 2, 2012 MSS Room #1.  The Leadership Team has not had a formal discussion about HSD facilities.  Individual discussions have taken.
Rosscarrock School We are your neighbourhood School
Laos Women’s Shelter Visit New Day Meeting, November 1 st 2007.
Waterloo Local School District Technology Lab Presentation 2009.
The Catholic Community of St. Thomas More New Building Committee.
FY BUDGET REDUCTIONS.  Central Office (Administration - $700,000)$1,238,554  Shift Funding from M & O $1,371,930  Offset Allowable M & O to.
[d] – desk, dining room, door; [b] – bed, bedroom, bathroom; [s] – sofa, poster, sweep; [w] – wall, window, wardrobe.
Rosscarrock School We are your neighbourhood School
Introduction Transforming School Experience in India.
Legend Desktop Computer Tables Double faced Shelving Reference Section Single faced shelving Circulation desk LMS Office Videos/AV Storage copier Display.
ROTARY CLUB OF ZANZIBAR STONETOWN SEARCHING FOR PARTNERS TO HELP BUY SCHOOL DESKS AT MIGOMBANI SCHOOL IN ZANZIBAR, TANZANIA.
NH CHARTER SCHOOL PROGRAM OBJECTIVES & EXPLANATIONS Roberta Tenney, Administrator DOE.
NEW COMMUNITY FACILITY Adam Kroll - Lighting / Electrical - Consultant: Dr. Richard Mistrick - Tech 3: Schematic Design.
ADOPT-A-SCHOOL PROGRAM
A Proposal for the Repurposing of Penfield Hall Prepared By:Chris Crook: Project Manager Matt Baker: Logistics Lead Thomas Quigley: Budget Lead Brittany.
2 Direct and indirect benefits   UC Advisory Council (Majority students – advise on policies, fees, budget, space use, etc.)   Employment opportunities.
I NVESTMENT IN E ARLY C HILDHOOD J AMAICA SOCIAL INVESTMENT FUND 1.
Manistee County Library Master Space Plan December 2013 Quinn Evans Architects & GMB Architecture and Engineering.
College Station ISD Planning for Growth December 12, 2006.
 The law indicates that it is the intent of the governor and the legislature that school districts increase the total percentage of classroom spending.
Section B Inventory Process and Forms. General Inventory Actions %Getting Started Set inventory goals and objectives %Who District Program Manager Site.
9/19/20151 IBUSA ASSOCIATION INC, USA Presented by Executive Council.
Building for Learning Project Photo Progress Report 3 October 2009 – November 2009 Project commencement 21 st September 2009.
Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New.
Advanced Contract Management Case Study Requirement Chat Room Week One.
A LL D ULLES A REA M USLIM S OCIETY. ADAMS CORE VALUES.
2011/12 EHS-EES ALUMNI SUPPORT PROJECTS SUMMARY REPORT.
GENERAL INFORMATION SEATING SEATING CHART Assigned seats With a SUB you stay seated Tardy – is not in the room Bathroom and Water before entering room.
1 NEW FAIRFIELD FREE PUBLIC LIBRARY Renovation Project
BRVFD & RS Training Facility Proposal 05/07/2009.
DEDHAM PUBLIC SCHOOLS FY 2008 Approved FY 2009 Approved FY 2010 Approved Education Technology Program 275, Roof Replacement - High School750,
Natick Public Schools Technology Update October 6, 2008 Dennis Roche, CISA Director of Technology.
Department of Correctional PRESENTATION ON THE DEVELOPMENT OF THE “NEW GENERATION” CORRECTIONAL FACILITY PROTOTYPES DEPARTMENT OF CORRECTIONAL SERVICES.
PRIMARY AND SECONDARY SCHOOL AND TSUMEB TEACHERS RESOURCE CENTRE.
School Directory Insert picture of School here.. Table of Contents Superintendent/ Principal - Office Staff Superintendent/ Principal - Office Staff Kindergarten.
Budgeting Technology. Start with a Plan Learners Learning Environments Professional Competency System Capacity Community Connections Technology Capacity.
2 pt 3 pt 4 pt 5pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2pt 3 pt 4pt 5 pt 1pt 2pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4pt 5 pt 1pt Draw and Write Places at School.
Welcome To Our Class September Our classroom door.
Конструкция “there is\there are”
Rosscarrock School We are your neighbourhood School
School Works - Ministry of Education Progress Review 2015 and Way Forward to By Dr U G Y Abeysundara Director School Works.
Your school is a learning centre, and there is lots to learn!
FEDERAL, STATE, AND LOCAL INFLUENCE ON EDUCATION.
SMITHVILLE R-II SCHOOL DISTRICT Tradition of Excellence The Power of One … One Community … One Future! November 4, 2014 SMITHVILLE R-II SCHOOL DISTRICT.
Miller Driscoll Building Committee Update Tuesday, January 7, :00 PM - 7:00 PM Presented by: Turner Construction, CMA 1 Additions & Alterations Miller-Driscoll.
Rotary Global Grant Medical Supplies and Equipment for a Village Primary Health Care Center in South Sudan.
Introducing Smart Classrooms for TVET Improvement in Kenya Project launch in Nairobi, Kenya 18 March 2016.
Mariposa Elementary School Mariposa Elementary School Created by Lauren Sarah Darylyn Sahar Miranda Tami Stephanie Katie Madelyn.
St Martin’s Projects “Welcomes you to know Christ and to make Him known” Renovation, Refurbishment & Maintenance Rectory Bathroom and study.
Help Ted and Tilly put the furniture in the house.
Ultimate Classroom By: Alexia Jones.
Full- Day Kindergarten Feasibility Study
MY HOUSE.
Opening of Schools – Elementary/Secondary
COMMITTEE ROOM M46, MARKS BUILDING CAPE TOWN
State Budget Outlook.
Presentation transcript:

ST. PETER CLAVER SCHOOL: THE NEW VISION! A FIVE YEAR VISION

SCHOOL PROFILE ESTABLISHED: SEPTEMBER 1862 POPULATION PRIMARY SCHOOL: 885 Students 439 Girls 446 Boys PRESCHOOL: 27 Students 17 Girls 10 Boys TOTAL: 912 Students NUMBER OF BOYS: 456 NUMBER OF GIRLS: 456

SCHOOL PROFILE ESTABLISHED: SEPTEMBER 1862 POPULATION PRIMARY SCHOOL: 939 Students 470 Girls 469 Boys PRESCHOOL: 30 Students 19 Girls 11 Boys TOTAL: 969 Students NUMBER OF BOYS: 480 NUMBER OF GIRLS: 489

STAFF Administrative Principal 2 Administrative Vice Principals 2 Preschool Teachers 35 Primary School Teachers (Infant 1-Standard 6)

Construct two two- storey concrete buildings with 28 new classrooms. Construct two fences to secure the infrastructure of the school. Rehabilitate 2 existing buildings with 13 classroom Rehabilitate the existing school library Provide furniture for the whole school Improve the recreational facilities of the school.

PROJECT OVERVIEW PROJECT #1 PRESCHOOL Rehabilitation $60, Additional 3 classrooms for the Standard One $30, *Social Security to Pledge towards the project.

PROJECT OVERVIEW PROJECT #2 Construction of the first two- Storey 14 classroom building with principal’s office and bathrooms. Estimated cost Bze$1.3 M

PROJECT #3 Construction of the second two-Storey 14 classroom building with principal’s office and bathrooms. Estimated cost Bze$1.2 M

PROJECT #4 Construction of two fences Rehabilitation of 2 existing buildings Rehabilitation of existing library Estimated cost Bze$700,000

PHASE ONE GROUND WORK PREPARATION AND SECURING FUNDING PHASE TWO TEMPORARY BUILDINGS FOR 16 CLASSROOMS AND VACATING OF ASBESTOS ROOFED BUILDINGS PHASE THREE DEMOLITION OF ASBESTOS BUILDINGS AND SITE PREPARATION PHASE FOUR CONSTRUCTION OF THE FIRST TWO STOREY 14 CLASSROOM BUILDING PHASE FIVE REHABILITATION OF 13 CLASSROOMS IN TWO BUILDINGS AND THE LIBRARY PHASE SIX DEMOLITION OF THE TWO MAIN STREET BUILDINGS, SITE PREPARATION AND CONSRUCTION OF THE SECOND 2 STOREY 14 CLASSROOM BUILDING PHASE SEVEN CONSTRUCTION OF FENCE, INAUGURATION AND CELEBRATION OF 150 TH ANIVERSARY OF ST PETER CLAVER SCHOOL AND PARISH ( )

GROUND WORK PROJECT PROPOSALS forwarded to various agencies ENGINEER from BNE has visited DISTRICT EDUCATION MANAGER has pledged support VENEZUELAN AMBASADOR has visited MINISTER OF EDUCATION has visited AREA REPRESENTATIVE has visited ENGINEER from MOE has visited STAKEHOLDERS MEETING

MAIN STREET PRESCHOOL (3 Classrooms)

JOSE MARIA NUNEZ STREET STANDARD ONE (4 Classrooms)

JOSE MARIA NUNEZ STRRET INFANT TWO (4 Classrooms)

RECONSTRUCTION INFANT TWO BUILDING: 4 CLASSROOMS STANDARD ONE: 4 CLASSROOMS PRESCHOOL: 3 CLASSROOMS

SCOPE OF WORK Demolition of the existing buildings with special care given to the asbestos roof. Closure of School (1 week) during demolition. Purchasing of 11 temporary classroom buildings to house 370 students( a third of the total school population) over a one year period. Construction of a new14 classroom 2 storey building with principal’s office and bathrooms.

Wiring of the new building Installation of ceiling fans in the new classrooms Painting of the new building Furnishing of new classrooms

FURNITURE PRESCHOOL: 3 classrooms 50 armchairs 12 learning centre tables 2 teachers desks & chairs 3 bookshelves 3 cupboards 1 kitchenette with sink

INFANT TWO: 4 classrooms 120 armchairs 8 learning centre tables 4 teachers desks & 12 chairs 4 bookshelves 4 cupboards 4 chalk boards

STANDARD ONE: 4 classrooms 120 armchairs 8 learning centre tables 4 teachers desks & 12 chairs 4 bookshelves 4 cupboards 4 chalk boards

PRINCIPAL’S OFFICE Teachers’ Lounge & Print Room 1 Principal’s desk and 5 chairs 1 table to seat 20 teachers and 20 chairs for meetings and workshops 1 chalkboard 2 bookshelves 2 file cabinets 2 cupboards 1 kitchenette and sink

PRINT ROOM 3 WALL TO WALL BOOK SHELVES 1 COMPUTER STATION 3 TABLES FOR RISOGRAPHS & PRINTERS 2 CUPBOARDS TO STORE SUPPLIES

MAIN STREET, STANDARD FIVE (6 Classrooms)

MAIN STREET, STANDARD Six (4 Classrooms)

RECONSTRUCTION OF TWO BUILDINGS MAIN STREET STD V BUILDING: 6 CLASSROOMS STD VI BUILDING: 4 CLASSROOMS

SCOPE OF WORK Demolition of the existing buildings Construction of a new14 classroom 2 storey building to accommodate (226 students) with principal’s office and bathrooms. Wiring of the new building Installation of ceiling fans in the new classrooms Painting and furnishing of the new building

STANDARD FIVE: 6 classrooms 120 armchairs 12 learning centre tables 6 teachers desks & 18 chairs 6 bookshelves 6 cupboards 6 chalk boards

STANDARD 6: 4 classrooms 120 armchairs 8 learning centre tables 4 teachers desks & 12 chairs 4 bookshelves 4 cupboards 4 chalk boards

PRINCIPALS OFFICE Teachers Lounge 1 Principal’s desk and chair 1 table to seat 20 teachers and 20 chairs for meetings and workshops 1 chalkboard 2 bookshelves 2 file cabinets 2 cupboards

JOSE MARIA NUNEZ STREET PUNTA GORDA TOWN INFANT ONE (6 Classrooms)

School Library

Standard 2 & 3 (7 Classrooms)

REHABILITATION OF THREE BUILDINGS FRONT STREET STD 2 & 3 BUILDING: 7 CLASSROOMS INFANT I BUILDING: 6 CLASSROOMS SCHOOL LIBRARY

INFANT ONE Total cost$31, (COST OF FURNITURE NOT INCLUDED) SCOPE OF WORK Change Windows Electrification Ceiling Fans (6 per class) Painting Installation of burglar bars

INFANT ONE: 6 classrooms 150 armchairs 12 learning centre tables 6 teachers desks & 18 chairs 6 bookshelves 6 cupboards 6 chalk boards

STANDARD 2 & 3 Total Cost$86, (COST OF FURNITURE NOT INCLUDED) SCOPE OF WORK Change Windows Electrification Ceiling Fans (6 per class) Painting Installation of burglar bars

STANDARD 2 & 3: 8 classrooms 300 armchairs 16 learning centre tables 8 teachers’ desks & 24 chairs 8 bookshelves 8 cupboards 8 chalk boards

SCHOOL LIBRARY Total cost$31, (COST OF FURNITURE NOT INCLUDED) SCOPE OF WORK 1.Change Windows 2.Electrification 3.Ceiling Fans (10) 4.Painting of building 5.Installation of burglar bars 6.Replastering of outside walls 7.Furnishing of library

LIBRARY FURNITURE 20 tables 80 chairs 1 library counter 1 library computer centre 15 large bookshelves 5 cupboards 1 kitchenette with sink

PROJECT SUMMARY

TOTAL COST OF PROJECT BZ$4,501, Community Contribution: 10% of the total cost of the project. ($450,100.00)

Management’s/School/PTA Contribution 1. Salary of a full time Manager/Coordinator 2. Vehicle and gas for ground work preparations/meetings 3. Land for the Project 4. Plans for the project 5. Plans and Estimate for the Project 6. Ground work preparation

8. Implementation and coordination 9. Monitoring and Supervision 10. Building maintenance 11. Ongoing fundraising activities

PTA Ms. Florence Tillett- PRESIDENT Mr. Carlos Juarez- VICE PRESIDENT Ms. Lareini Reyes-SECRETARY Mr. Rudy Arzu- ASSISTANT SECRETARY Mr. Raju Thadhani- TREASURER Mr. Pedro Ical- ASSISTANT TREASURER Mrs. Cindy Bochub- COUNCILLOR Mr. Sheldon Ramirez- Staff Representative !!!!CONGRATULATIONS!!!!