ADVANCED PLANNING BRIEFING TO INDUSTRY TANK & MEDIUM CALIBER AMMUNITION Mr. Bruce Potter Ms. Trish Huber OPM-TMAS Operations & Support Command Business Manager Tank and Medium Cal Team Leader Picatinny Arsenal, New Jersey 29 May 2002
FY02 (EXISTING R&D CONTRACTS) M829E3 (APFSDS-T) Contract w/Alliant EMD Complete in FY02 Production Starts: FY02 XM1002 (TPCSDS-T) R&D: FY00-FY03 Production Starts: FY04 Mid-Range Munition Contracts w/Alliant and Raytheon
POTENTIAL OPPORTUNITIES FY02/03 120mm XM1028 CANISTER 120mm M830A1 USMC Buy 120mm M865 & M831 TP Ctgs 105mm AMMO for MGS 25mm TP-T M910E1 20mm/25mm/30mm families Small Calibers & 40mm Grenades
CTG, 120MM, XM1028, CANISTER Acquisition Strategy – Competitive Best Value Award U.S./Canada Performance Specification Gov’t Design/Test Data Provided for Info Program Strategy Contractor R&D Effort: FY02-FY04 with options: Low Rate Production Full Rate Production In Source Selection
CTG, 120MM, M830A1, MPAT-T For USMC Acquisition Strategy – Competitive Best Value Award U.S./Canada U.S. Government TDP Program Strategy Award with annual options FY02-FY04 RFP Being Assembled
PROJECTED TANK (TRNG) REQUIREMENTS NOMENCLATURE Qty 02 Qty Outyrs M865 KE 215K Yes M831A1 HEAT 95K Yes
TANK (TRNG) ACQUISITION STRATEGY MULTI-YEAR I 1995-1998 w/ATK & Primex MULTI-YEAR II 1999-2003 w/ATK & Primex (GD-OTS) MULTI-YEAR III Yes, planned for 2004-2008 Restrictive - Competitive – Best Value Cut-in XM1002 for M831A1
NEW MGS MUNITION High Explosive (10,500 Total for Tactical and Ramp Up to 15,000/year for Training Cartridges) Defeat a Standard Infantry Bunker and Create an Opening in Double Reinforced Concrete Walls Large Enough for an Infantry Soldier and Equipment to Pass Through (2’ X 4’) Performance Specifications (U.S. Tech Data Provided For Information Only) Based on Current 105mm Ammo Brought to Current Safety Standards (e.g. Dual Safe Fuze) As Threshold With Aggressive Performance Levels As Objective Full and Open Competition (Tactical) Non-Developmental Item (NDI) Acquisition Best Value Award North American Production Required (Training) In Source Selection
CTG,105MM, XM1040, Canister RDTE FY03-04, Follow-on Production Acquisition Strategy – Competitive Best Value Award U.S./Canada Performance Specification Gov’t Design/Test Data Provided for Info RDTE FY03-04, Follow-on Production RFP Being Assembled
CTG, 25MM, M910E1, TP-T RDTE FY03-04, Follow-on Production Acquisition Strategy – Competitive Best Value Award U.S./Canada Performance Specification RDTE FY03-04, Follow-on Production Will replace M910 TPDS-T RFP Being Assembled
PROJECTED MEDCAL REQUIREMENTS NOMENCLATURE Qty 02 Qty Outyrs 20mm PGU 28A/B 0 Yes PGU 27A/B 6,935K Yes PGU 27A/B & PGU 30A/B 528K Yes 25mm M910 TPDS-T 1,663K Yes M791 APDS-T 0 Yes M793 TP-T 1,538K Yes 30mm PGU 15/B 2,679K Yes M788 TP 831K Yes M789 HEDP 0 No
MEDCAL ACQUISITION STRATEGY CURRENT (thru FY03) M910, M793, M788 IN MULTI-YR THRU FY03 ACQ PLAN COVERS 20MM THRU 30MM OTHER SERVICES W/ SIGNIFICANT RQMTS CURRENT PRODUCERS = GD-OTS AND ATK FUTURE CON’T W/LONG-TERM CONTRACTS RESTRICTED - COMPETITIVE - BEST VALUE 2 SOURCES STRATEGIZE FROM A “FAMILY” PERSPECTIVE
TECHNOLOGY AREAS OF INTEREST GOVERNMENT LABS & INDUSTRY Enhanced Propulsion Systems Higher Energy Reduced Wear & Erosion Survivability Enhanced KE Novel Defeat Mechanisms Advanced Penetrator Materials Improved Depleted Uranium Enhanced Tungsten Enhanced Accuracy High G-Low Cost Course Corrections Guidance & Control Sensor & Fuzing Technology Batteries/Power Supplies Advanced Warheads Airbursting Munitions
PROJECTED ITEMS BEGINNING FY03 PM – MANEUVER AMMUNITION SYSTEMS (ARMY ONLY - POM FUNDED)
SUMMARY Opportunities May Exist With: 120mm Ammo for ABRAMS 105mm Ammo for MGS 25mm Ammo for Ground Systems 20mm for Aviation 30mm for Aviation & Ground Systems Small Calibers beginning FY03 Sub-Contracting Through System Contractors Opportunities – Funding and Requirement Dependent PM POC: Mr. Bruce Potter, 973.724-4173, bpotter@pica.army.mil OSC POC: Ms. Trish Huber, 309.782-5223, huberp@osc.army.mil