HYDRO POWER POTENTIAL AND INVESTMENT PROSPECTS IN GILGIT-BALTISTAN

Slides:



Advertisements
Similar presentations
Pakistans Power Sector Need for Reforms By Kalim A. Siddiqui President-Petroleum Marketing Byco Petroleum Paksitan Limited 4 th International Power Generation.
Advertisements

KEY CHALLENGES IN INDIA FOR ROOFTOP PV PROJECTS Nexus Energytech Pvt. Ltd. Arvind Karandikar
Dr. Bader Eddin Al-Majali
- P G Ajith kumara.  Introduce strong community/ business concept  Build capacity of non technical aspects  Build capacity of technical Aspects  Identify.
Climate Investment Funds SCALING-UP RENEWABLE ENERGY IN LOW- INCOME COUNTRIES (SREP) Investment Plan for Solomon Islands June 2014 Government of Solomon.
PAKISTAN POWER SECTOR BACK-GROUND, PRESENT SITUATION & FUTURE PLANS.
Mexico’s initiatives with respect to Renewable Energies World Bank February 2012 Washington D.C. Alejandro Peraza-García Director General of Electricity.
Donors’ Conference on Sustainable Energy for Kosovo
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
Renewable Energy Program Arab Union for Electricity
Hydropower Development: Experience of Nepal
Understanding Ontario’s Electricity System
Khalid Saeed Head Energy Research Centre COMSATS Institute of Information Technology, Lahore Campus.
BUSINESS OPPORUNITIES IN SAUDI POWER SECTOR US-Saudi BUSINESS OPPORTUNITIES FORUM CHICAGO April 28-29, 2010 Ali Albarrak President &C E O Saudi Electricity.
Take A Load Off, Texas SM is provided by Oncor Electric Delivery LLC as part of the company’s commitment to reduce energy consumption and demand. Frontier.
THE CURRENT STATE OF ENERGY SECTOR IN MONGOLIA, DEVELOPMENT TRENDS
Practical Ways For Towns to Save Money With Clean Energy Projects Paul Michaud Murtha Cullina LLP April 30, 2014.
California's three large IOUs collectively served 12.7% of their 2007 retail electricity sales with renewable power. – Pacific Gas and Electric (PG&E)
Solar Energy in Gujarat Some Aspects of Regulatory Decision-making Dr. P. K Mishra Chairman Gujarat Electricity Regulatory Commission Forum on Clean Energy,
Fremont County – Green Spring 2012 Research Team: Jacob Tolman, Justin Andersen, Thresia Mouritsen, Joseph Huckbody, John Beck Feasibility Study.
Small Farm Profitability: Is Wind Energy the Answer? 1
Green Energy London Co-operative Inc. (GEL) May 9, 2013 What is GEL?
Renewable Energy Support Schemes & Capacity Building Needs Benon Bena Manager, Off-Grid Renewable Energy Development Rural Electrification Agency-Uganda.
WATER ISSUES IN THE EASTERN EUROPE:
Energy Policy Levers. 2 State as a Taxing Authority Income tax credits or deductions Income tax credits or deductions Residential Alternative Energy Tax.
Load shedding in Pakistan Reasons & Remedies February 9, 2009 By Muhammad Ziauddin.
Renewable Energy Sector
The Learning Process and Technological Change through International Collaboration: Evidence from China’s CDM Wind Projects Tian Tang David Popp Maxwell.
Distributed Generation Programs, Incentives and Interconnections Ian Loughran, P.Eng. DSM Program Leader Renewable Energy Programs
INSTALLATION OF CAPACITOR BANKS IN COMMERCIAL/INDUSTRY BUILDINGS African Regional NAMA Workshop Kigali, Rwanda, 2015 By: Kennedy Amankwa, Energy Commission,
Turkish Power System Overview March 2012
DATA COLLECTION ISSUES (DATA SOURCES, STATISTICAL UNITS AND APPROACHES TO DATA COLLECTION) PROBLEMS AND SOLUTIONS. By Salami R Ayodele National Bureau.
How to deliver a Renewable Energy Project Jemma Benson CO2Sense Yorkshire.
Smart Grid - Developments and Implementations Prof. Gady Golan – HIT, Israel Dr. Yuval Beck – HIT, Israel , Electricity 2012, Eilat.
RENEWABLE ENERY & BIOMASS COGENERATION TRAINING – KENYA BY LEWIS B. MHANGO.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
1 WIND ENRGY STATUS : PAKISTAN ASIAN CLEAN ENERGY FORUM ND ADB Quantum Leap in Wind Conference GOVERNMENT OF PAKISTAN June 20, 2011.
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
JUNTOS CONSTRUIMOS UN PAIS DE CALIDAD HONDURAS RENEWABLE ENERGY 2012.
CAPTIVE POWER POLICY. Section 44 of the Electricity(Supply) Act, 1948 gave birth to Captive Generation.  Any other person to establish or to acquire.
Practical issues in identification and development of CDM projects AIT, Bangkok, October 20, 2005 Soeren Varming Senior Consultant, Climate Change
2008 Electricity Distribution Maintenance Summit Stream 3A: Funding, Investment and Financial issues 10 June 2008 Theo van Vuuren Divisional Executive.
Overview In order to address this issue, we will be setting up a small, local power company to provide local alternative energy. We will use wind energy.
Natural Gas and Power Generation Natural Gas and Power: A Look at Prices Carbon Legislation and Power Generation The future of Power Generation and the.
El Gallo Hydroelectricity Project PDD Analysis
Community Power Projects An introduction to the process of developing community power projects UBCM 2006 Tuesday, October 24.
IMPACT OF 18th AMENDMENTS ON ENERGY SECTOR GOVERNMENT OF THE PUNJAB
MINING AND INFRASTRUCTURE INDABA 2015 ZPC PRESENTATION Presented by: N.F. Gwariro (MD)
Vision for Power Sector: To Ensure reliable & quality power supply to all citizens by 2021 at an affordable price. Vision 2021: To be a Middle-Income.
1 19 th World Energy Congress – 2004 Round Table 1 – Non Fossil Fuels: Will They Deliver? Jerson Kelman President, Brazilian Water Agency - ANA.
Southern California Edison The San Onofre Nuclear Generating Station April 14, 2011.
Legal, Regulatory and Financial Incentive Framework to Support Landfill Gas Power Generation Project Development Presented by Leiping Wang Senior Energy.
ICAP SAFA Conference 2016 South Asia: Corridor of Opportunities Lahore, January 30, 2016 Mirza Hamid Hasan.
In 2014, the average levelized price of signed wind power purchase agreements was about 2.35 cents per kilowatt-hour. This price is cost competitive with.
Slide 1 Overview of Conservation in the Pacific Northwest Energy Efficiency Options in the Northwest Post-2011Meeting March 4, 2008.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
EABC/EAC ENERGY CONFERENCE: 8-9TH JUNE, AVAILABLE BUSINESS OPPORTUNITIES IN THE ENERGY SECTOR By Eng. B.J. Mrindoko.
RFPEG2013 PRE-BID MEETING RFPEG2013 – Pre-Bid meeting January 9, 2014 Presentation by Derek Davis – Public Utilities Commission.
Energy is one of the most important files being dealt with in Jordan that are dealt with at the present time, for the big burden it puts on the national.
AFRICAN DEVELOPMENT BANK KENYA- SPAIN Multilateral Partnership Meeting Nairobi, 9 December 2013.
Erdeneburen HPP Project Implementation Unit
1 Implementation of Off-Grid Policy in the state of Maharashtra By H M Kulkarni General Manager (R.E) Maharashtra Energy Development Agency Date 17 th.
Community Choice Aggregation Demonstration Project Marin County Base Case Feasibility Analyses Overview April 5, 2005.
Electricity Basket Price & 2013 Power Policy Hammad Hashmi Advisor Technical (USAID) MWP.
ROK-PH Partneship: Exploring Cooperation in Renewable Energy Mr. Ariel D. Fronda Division Chief, Geothermal Energy Management Division Renewable Energy.
Republic of the Union of Myanmar Electricity Sector Financial and Regulatory Issues 18 May 2016 by Myanmar Energy Team The World Bank.
Electricity & Regulatory Overview of Korea
CURRENT STATUS - ENERGY TRANSITION
March, 30 – April 3, 2009, Honolulu, Hawaii
The Role of Policy in Scaling Private Sector NDC Finance
Presentation transcript:

HYDRO POWER POTENTIAL AND INVESTMENT PROSPECTS IN GILGIT-BALTISTAN

PRESENTATION SEQUENCE Map of Gilgit-Baltistan Salient Potential Indicators for Hydro Development in GB Supply & Demand of Electricity in Gilgit-Baltistan Hydro Power Potential Institutional Arrangement Present Power Policies Salient Reforms Underway Incentives already available for Private Investors Challenges Possible Ventures for Private Investment

Salient Potential Indicators for Hydro Development in Gilgit-Baltistan Gilgit Baltistan is the water bank for Pakistan due to large area of glaciers and snow deposits in its mountains. Catchment Area is 72496 Sq Km, which include about 27 % glaciers, the biggest in the world outside polar region. Main Tributaries of Indus River are 06 (Olding River, Shyoke River, Shigar River, Gilgit River, Hunza River & Astore River). Drop of Indus River up to Diamar /Basha Dam site is 1.37 Km. Average annual run off near Basha is 50 MAF. Hydro power potential on Main Tributaries & Indus River is 40,000 MW. Hydro power potential on sub tributaries is 1,200 MW.

SUPPLY AND DEMAND OF ELECTRICITY IN GILGIT-BALTISTAN Present Generation : 90 MW (92 Power Stations) Population Connected with suppressed load : 75% Present Demand : Conservative – 200 MW Optimistic - 410 MW Future Demand Forecast:- 2011 : 428 MW 2012 : 446 MW 2013 : 465 MW 2014 : 485 MW 2015 : 506 MW

Feasibility Study completed Shagharthang, Skardu (Financed by ADB) 2016 : 528 MW 2017 : 551 MW 2030 : 863 MW Under Construction Power Projects : 29 (40 MW) Projects Under Active Planning :- S. # Name Capacity Status 1 Hanzal Gilgit River 20 MW Feasibility Study completed 2 Shagharthang, Skardu (Financed by ADB) 26 MW Procurement stage

S. # Name Capacity Status 3 Thak Chilas (Financed by ADB) 4 MW Procurement stage 4 Naltar V, Gilgit (PSDP) 14 MW 5 Naltar III, Gilgit (PSDP) 16 MW 6 Basho, Skardu 28 MW Detail Engineering Design under process by WAPDA 7 Harpo, Skardu 42 MW 8 Phandar, Ghizer 87 MW 9 Tormik, Skardu 10 MW Feasibility study completed

S. # Name Capacity Status TOTAL 278 MW 10 Ghowari, Shyoke Ghanche 20 MW Feasibility study completed 11 Hassanabad, Hunza 5 MW 12 Dermadar, Ghizer 2 MW 13 Hushey, Ghanche 4 MW PC-II under process 14 Regional Grid in Gilgit-Baltistan 132 KV Feasibility Study completed TOTAL 278 MW

Average Construction Cost Per MW in GB : 2.0 Million US $ Average Production Cost Per Unit (KWh) : 3 – 4 US cents

HYDRO POWER POTENTIAL IDENTIFIED 1) 122 sites on sub tributaries in GB identified by WAPDA and GTZ (Germany) 772 MW 2) 6 sites identified by WAPDA on River Indus: a. Yugo 520 MW b. Skardu 1600 MW c. Tungus 2200 MW d. Yulbo 2800 MW e. Bunji 7100 MW f. Diamer-Basha 4500 MW TOTAL 18,720 MW

3) 36 projects identified by W & P department GB on tributaries and sub tributaries of River Indus 204 MW Total 19,696 MW

INSTITUTIONAL ARRANGEMENTS Water & Power Department GB is responsible for Planning, Execution and Operation of power projects in GB. WAPDA is responsible for mega projects on River Indus besides small hydros under specific directions of GOP. NEPRA’s jurisdiction not yet extended to GB in the absence of National Grid. W & P department is responsible for devising tariff with the approval of GB government. GB Electricity Development Company being raised shortly.

PRESENT POWER POLICIES GOP Policy for power generation projects 2002: All types of power projects exceeding 50 MW capacity under public sector, private sector (IPPs) and public private partnership are covered. BOOT and BOO are applicable. GOP Renewable Energy Policy 2006: Solar, Wind and Small Hydro Power projects up to 50 MW capacity are covered. The policy also provides private investment incentives. GB Hydel and Renewable Energy Policy 2007: This policy covers projects up to 50 MW capacity under public sector program. Being revised for development of hydro power projects by private sector and public private partnership also.

SALIENT REFORMS UNDERWAY Consultancy services acquired for “Establishment of GB Electricity Development Company” to facilitate investors through one window operation besides capacity building of W&P Department. Feasibility study of Regional Grid in GB completed. The project aims at interconnection of all existing and future hydro power projects to a common grid for improvement of diversity factor, minimize line losses and establish a power corridor for interconnection to the National Grid. Estimated cost of the project is Rs. 25 billion and proposed for construction in 3 phases.

Computerized billing system introduced in Gilgit city as pilot project. PC Energy Meters introduced to minimize electricity pilferage.

INCENTIVES ALREADY AVAILABLE FOR PRIVATE SECTOR INVESTORS Under “Renewable Energy Policy of Pakistan 2006”, which is applicable in Gilgit Baltistan also following incentives for private sector investment in development of Hydro Power projects having capacity of 50 MW or below are covered:- 1. Investment opportunity for private sector for following categories:- a. IPPs for sale of power to the grid only. (Solicited and unsolicited proposals)

b. Captive Power cum grid spillover projects for self-use and sale to utility. c. Captive power projects for self or dedicated use. d. Isolated grid power projects of 5 MW and below. 2. Except for category 1(a) above, the projects will not require any LOI, LOS or IA. 3. It permits an investor to generate electricity from hydro power project at one location and receive an equivalent amount of energy for own use elsewhere on the grid at investors own cost of generation plus transmission charges (wheeling concept / Energy Banking).

4. It permits “Net Metering and Billing” 4. It permits “Net Metering and Billing”. A power producer can sell surplus energy at one time and receive electricity from the grid at another time and settle accounts on net basis. 5. Simplified principles of tariff determination. 6. Insulates the investor from hydrological variability risk. 7. It facilitates projects to obtain carbon credits for avoided green-house gas emissions, helping financial returns and reducing energy cost for the purchaser and inturn the consumers. 8. Off grid hydro power projects can be developed for supply to a local community by corporate entities, NGOs or individuals at any location with the approval of the Provincial Government. For such projects, simplified procedural

arrangements can be developed by the provincial government. 9 arrangements can be developed by the provincial government. 9. No Custom Duty or Sales Tax for machinery and equipments with spares requiring import and not manufactured in the country for initial installation for renewable energy projects. 10. Many other fiscal and financial incentives. Details can be seen from the Renewable Energy Policy 2006.

CHALLENGES Less revenue receipt due to lower load factor for repayment to the IPPs. Affordable energy cost for the consumers in case of power purchased from IPPs. GOP may not permit any subsidy under present policy. Non interconnection of GB with the national grid. NEPRA’s role in GB. Capacity building of the power utility. Tendency of high electricity pilferage.

POSSIBLE VENTURES FOR PRIVATE INVESTMENT 1. Establishment of regional grid in Gilgit-Baltistan to interlink all the power potential sites. 2. Investment in the field of Captive Power & Energy Banking. Industry and hydro power development may take place simultaneously. 3. The main purpose to club hydro power development with other industries would enable the private investors to offer affordable tariff.

4. Power Projects through IPPs would be viable for mega projects on Indus river through PPIB/WAPDA. Commencement of physical work on high voltage transmission line by WAPDA for interconnection to the national grid may take place simultaneously 5. Project through IPPs can be developed simultaneously at the identified sites near to Bunji and Diamar/Basha projects to supply power to WAPDA during implementation of these vital projects.

THANK YOU The End