Bridge Information Modeling (BrIM): Evolving into a Model Based Industry An Owners Perspective Scot Becker Director, Bureau of Structures Wisconsin DOT.

Slides:



Advertisements
Similar presentations
Civil Integrated Management
Advertisements

St. Croix River Crossing Project Public Information Meeting
March 10, 2011 Jerry Zogg, P. E. WisDOT – Bureau of Project Development ACEC/WisDOT Transportation Improvement Conference.
Project Delivery Methods. Traditional Owner Design/ Design/Bid/Construction Selection Build Owner’s Vision Owner’s Vision Owner’s Vision Complete Design.
Update - Subcommittee on Bridges and Structures Kelley Rehm, PE July 2011.
Sharif University of Technology Session # 2.  Contents  Structured analysis and design  Information system development  Systems Analysis and Design.
© 2010 Bentley Systems, Incorporated Ron Gant, P.E., Bentley Systems, Inc. Virtual Design & Construction: 3D Information Modeling.
Bridge Preservation Update Wade F. Casey, P.E. Bridge Management Engineer Federal Highway Administration AASHTO SCOM Meeting Louisville, KY July 20, 2011.
BIM Management – A Strategic Approach
1 Automated Machine Guidance: Electronic Files and Design Data AASHTO Subcommittee on Construction Meeting August 18, 2010 – Burlington, VT Mark Taylor.
 Project Delivery  Design Considerations  Lessons Learned.
BIM Me Up, Scottie! The Next Generation in Construction Technology.
Presented to presented by Increase Efficiency of Highway Freight Wisconsin’s Initiatives AASHTO BOD Workshop 9:30am to 11:30am Nov 2012 Mark Gottlieb,
FHWA Update 2011 VOBug Meeting Helena, MT Thomas Saad, P. E. FHWA Resource Center Phone:
Expanding Roadmap Opportunities Deke Smith, FAIA Executive Director buildingSMART alliance National Institute of Building Sciences Hotel Monteleone New.
 Value for one – Value for all Dan Russell – Director Construction Technology Eric Cylwik – Modeler II – Heavy / civil division Sundt Construction, inc.
AASHTO Subcommittee on Rail Transportation Sept. 18, 2012 Kevin Chesnik.
Civil Platform Update Derricke Gray, GEOPAK Product Manager.
1 SHRP 2 Implementation Outcomes and Products July 28, 2010 Accelerating solutions for highway safety, renewal, reliability, and capacity.
Part II – Applications 3D Engineered Models for Construction Part II - Applications September
SHRP 2 - FIRST DEMO PROJECT KEG CREEK, IOWA R04 – “BRIDGE DESIGNS FOR RAPID RENEWAL” Sandra Larson, P.E. Iowa Department of Transportation Research and.
IntelliDrive SM Strategic Plan 2009 Ted Trepanier SSOM – SCOTE Manchester The IntelliDrive SM logo is a service mark of the U.S. Department of Transportation.
A Dynamic 3D Traffic and GIS Model for Enhanced Visualization in Planning Daniel Morgan Caliper Corporation May 19, 2009.
Life Cycle Approach to Transportation Data Systems and Tools
World Trends in Spatial Data Interoperability Nathan Crews Principal Schema Architect, LandXML.org Software Researcher, Autodesk Civil Engineering/Survey/Imaging.
PennDOT’s Study of NCHRP Research Results Implementation TRB State Representatives & AASHTO National RAC Meetings July 27, Michael Bonini Transportation.
STATE CROSSING SAFETY PROGRAMS & FEDERAL CROSSING SAFETY FUNDING CROSSINGS FOR THE 21 ST CENTURY SESSION AASHTO – SCORT MEETING March 14, 2011 – Washington,
Metadata Strategy Case Study Bill Rosenblatt GiantSteps Media Technology Strategies (212)
Managing a Research Program from Various Funding Sources Sandra Larson, P.E. Research and Technology (R & T) Bureau Director Iowa Department of Transportation.
AASHTO TIG Ananth Prasad Chief Engineer, Florida DOT.
Working Smart for the Customer’s Benefit Pam Hutton AASHTO SHRP2 Implementation Manager June 11, 2013.
James McMinimee, P.S.E. July 27, 2011 AASHTO SCOR/RAC Meeting Salt Lake City, Utah.
National Cooperative Highway Research Program (NCHRP)
Trimble Buildings An example of a business strategy dependent on 3D indoor mapping and modeling Trevor Venter & Brent Godfrey November 2013.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
© 2006 Bentley Systems, Inc. Bentley Building Solutions multidisciplinary, integrated design and analysis.
Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits.
Methods Development – Support, Develop, InnovateFHWA – 3D Design at WisDOT, August 21, 2012 Implementing a Model Based Approach to Design at Wisconsin.
Overview of Building Information Modeling What does it mean for Civil Engineering?
Sue Sillick Research Manager Montana Department of Transportation Georgene Geary Research Manager – Retired Georgia Department of Transportation AASHTO.
Greta Smith, P.E. Associate Program Director, Project Delivery AASHTO Subcommittee on Design June 5, 2013.
I © 2015 Bentley Systems, Incorporated Andrew Smith, Feb 2016 How BIM can positively influence rail O&M.
Join us on Twitter: #AU2013 CI1754-R BIM for Infrastructure in Concrete Terms Francesca Maier, PE Aaron KrovanceKevin Gilson Parsons BrinckerhoffHDR, Inc.Parsons.
ITS Device Standards & Procurement Project PURPOSE  Develop a series of Standards & Strategies designed to guide and provide consistency across the development.
Melissa Lance Operations Systems Manager July 16, 2015 Connected Vehicle Update National and Virginia Perspective.
Agenda 1.Mechanical Design Capabilities 2.Electrical & Electronics Design Capabilities 3.Plant Automation and Test Bench Design Softnice Inc.
© 2009 Bentley Systems, Incorporated Intermediate Status Dec 8, 2009 FM Handover Aquarium (COBie2)
What is 3DM (DTM)? – Collection of intelligent computer objects that represent an original surface – The objects know their position in space and in what.
Internet of Things, Are You Ready?. Contents ●Introduction ●IoT Examples? ●IoT Benefits ○For Industries ○The Internet of Things In Organizations ○The.
Maria Stavrou ENG 160 Department of Civil Engineering CYPRUS UNIVERSITY OF TECHNOLOGY.
AN EXECUTIVE BRIEFING FOR THE GUIDEBOOK
Improving Safety in the NASTO States by Using SHRP2 Solutions
Fully Integrated and Automated Project Processes – The Vision
EXTRA SLIDES.
Transportation Research Resources
Multi-state Corridor Pooled Fund Program
Blatnik Bridge Management Study
INTRODUCTION TO CAPSTONE PROJECT
Data Impacts of Transportation Reauthorization: Data Community’s Plans and Strategies Pat Hu Chair, TRB National Transportation Data Requirements and Programs.
FHWA Bicycle and Pedestrian Program
MEP CoordinationMEP Coordination and Clash Detection is Extremely Significant for BIM-Know Why.
Support for the AASHTO Committee on Planning (COP) and its Subcommittees in Responding to the AASHTO Strategic Plan Prepared for NCHRP 8-36, TASK 138.
Project Information Management Jiwei Ma
FREIGHT PLANNING & EMERGING TECHNOLOGIES
Top Benefits of a BIM Consulting Firm for BIM Construction and the AEC industry Building Information ModelingBuilding Information Modeling or BIM Construction.
Building Information Modelling - UK Transition to ISO standards
What’s new in Bridges ABCD March 2019
Model-Based Design and Construction: the UDOT Experience
2019 NRRA Workshop May21, 2019 AASHTO Perspective on Electronic Data Michael J. Kennerly PE Director of The Design Bureau Iowa Department of.
Rebecca Embacher(MnDOT) Advanced Materials and Technology Engineer
Presentation transcript:

Bridge Information Modeling (BrIM): Evolving into a Model Based Industry An Owners Perspective Scot Becker Director, Bureau of Structures Wisconsin DOT 14/14/2015Iowa 3d Structures Workshop

Presentation Outline The Vertical Industry / Oil Industry – Leading the Way Benefits of Bridge Information Modeling to AASHTO SCOBS Other Transportation Infrastructure Information Model Initiatives T-19 “Software and Technology” Efforts 24/14/2015Iowa 3d Structures Workshop

Information Modeling 34/14/2015Iowa 3d Structures Workshop

BIM Terminology and Usage 44/14/2015Iowa 3d Structures Workshop

Life Cycle of Structures Information Model Information Model Planning / Concepts / Scenarios DesignConstructionOperations Bridge Management Touch Points to Cross Functional Areas Systems Interface Model Deliverables 54/14/2015Iowa 3d Structures Workshop

Planning / Scenarios Visualizations Simulations – Rehab vs. replacement Bridge Management Scenarios Investment Strategies Model Creation Planning / Concepts / Scenarios 64/14/2015Iowa 3d Structures Workshop

Visualizations Design 74/14/2015Iowa 3d Structures Workshop

Design Visualizations Import / export into FEM Virtual Construction Data Model Creation Integration into Refined Analysis Fabrication Interference – Clash Detection Model Handoff Design 84/14/2015Iowa 3d Structures Workshop

Clash Detection - Micro Design 94/14/2015Iowa 3d Structures Workshop

Clash Detection Macro Design 104/14/2015Iowa 3d Structures Workshop

Refined Pier Connection Model Design 114/14/2015Iowa 3d Structures Workshop

Digital Sections Design 124/14/2015Iowa 3d Structures Workshop

Interference (Tower – Crossbeam – Column Connection) Design 134/14/2015Iowa 3d Structures Workshop

Integration into Refined Analysis Design 144/14/2015Iowa 3d Structures Workshop

Construction Schedule Sequencing Demolition Planning Virtual Fit Up Bill of Materials Supplied Fabrication As built Conditions Model Handoff Construction 154/14/2015Iowa 3d Structures Workshop

Construction Schedule and Sequence Construction 164/14/2015Iowa 3d Structures Workshop

Oversize Over Weight Permits Perform Rating and Posting analysis In Service Investigations Emergency Simulations Operations Real time Monitoring – Videos, gates, loads etc Operate 174/14/2015Iowa 3d Structures Workshop

In Service Investigations 184/14/2015Iowa 3d Structures Workshop

Bridge Management, Preservation, and Maintenance Attach Information from / to Inspection Reports Bridge Management Cyclic Maintenance – Workflow In Service built Conditions Bridge Management 194/14/2015Iowa 3d Structures Workshop

Bridge Management 204/14/2015Iowa 3d Structures Workshop

Other Transportation Infrastructure Information Model Initiatives Civil Integrated Management (CIM) E- Delivery – Automated Machine Guidance – Stingless Pavers – Models in the field for construction Paperless Construction 214/14/2015Iowa 3d Structures Workshop

What is T-19 doing? Educating SCOBS members on Information Modeling Working with Cross AASHTO and TRB committees Participating with FHWA in their Information Modeling efforts Resourcing a to have workshop and provide road map of next steps for a standardized format 224/14/2015Iowa 3d Structures Workshop

Up Coming Events Today’s Event April 20 AASHTO Subcommittee on Bridges and Structures (SCOBS) – Presentation to State Bridge Engineers 234/14/2015Iowa 3d Structures Workshop

Up Coming Events June 11 International Bridge Conference (IBC) FHWA Workshop ??? National Workshop on a road map to a Standardized Bridge Information Model 4/14/2015Iowa 3d Structures Workshop24

Get Involved – Participate at Events – Champion Change Require Models as deliverables for owning and operating facility Partner with Contracting Industry to transform industry construction of structures – Fabrication – early Win What Can We Do to Foster Change? 254/14/2015Iowa 3d Structures Workshop

Thank You 4/14/2015Iowa 3d Structures Workshop26