Raw data recipes SGDP Science Grade Data Products Wolfram Freudling DPD / SDP Group.

Slides:



Advertisements
Similar presentations
Introduction to the Feedback Loop Note: this presentation is based on the MicroSave publication: The Feedback Loop – A process for Enhancing responsiveness.
Advertisements

OPC matters Simon Morris. Topics for possible Discussion Simon Morris is OPC Chair for period 80 and 81 Rapid turnover planned for Panel membership Large.
Ranking and priorities | | Michael Hilker Ranking of service mode observations and relative priorities Michael Hilker.
EPA Plans for Moving Forward with Electronic Reporting David Hindin, US EPA May 31, 2012 General Session for the Exchange Network National Meeting Philadelphia,
Science Operations Replan NGAO - Meeting 6 D. Le Mignant W. M. Keck Observatory 04/25/2007.
Computer Engineering 203 R Smith Agile Development 1/ Agile Methods What are Agile Methods? – Extreme Programming is the best known example – SCRUM.
1 CMSC 132: Object-Oriented Programming II Software Development III Department of Computer Science University of Maryland, College Park.
1 NGAO Science Instrument Reuse Part 1: NIRC2 NGAO IWG December 12, 2006.
IRAC-Data Processing Pipeline Review / January 26, 2001 Jason Surace (1) IRAC Pipeline Data Analysis and Pipeline Validation Plan Jason Surace January.
Introduction to Spitzer and some applications Data products Pipelines Preliminary work K. Nilsson, J.M. Castro Cerón, J.P.U. Fynbo, D.J. Watson, J. Hjorth.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
The Sound of One System Crashing Deploying Sakai at Indiana University David Goodrum Lance Speelmon Barry Walsh Indiana University.
S/W Project Management
Implementing 2007 NRC Portals of the Universe Report Chandra X-ray Center 25 April 2012 Implementing Portals of the Universe, April
Abdulmotaleb El Saddik Prof. Dr.-Ing., FIEEE, FCAE University Research Chair ELG 4913F ELG 4913F Electrical Engineering Design Project II
COMPGZ07 Project Management Presentations Graham Collins, UCL
Hunt for Molecules, Paris, 2005-Sep-20 Software Development for ALMA Robert LUCAS IRAM Grenoble France.
1 CMPT 275 Software Engineering Software life cycle.
N By: Md Rezaul Huda Reza n
Detector Monitoring as part of VLT Science and Data Flow Operations Wolfgang Hummel DMO/DFO/QC group Lander de Bilbao, SDD/pipeline group Andrea Modigliani,
University of Western Australia Mobility Programme.
© Grant Thornton | | | | | Guidance on Monitoring Internal Control Systems COSO Monitoring Project Update FEI - CFIT Meeting September 25, 2008.
SSSC 02/18/2010 P. Marcum Science Utilization Policies SOFIA SCIENCE UTILIZATION POLICIES Pamela M. Marcum SOFIA Project Scientist SSSC Feb 19, 2010.
Institutional Planning, Assessment & Research 2010 Institutional Planning, Assessment & Research Assessment Review Committee Report Administration & Finance.
Z26 Project Management Introduction lecture 1 13 th January 2005
McMullinEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Data Post-processing: SSG (AIPS++/CASA) Development J. McMullin.
EGEE is a project funded by the European Union under contract IST Testing processes Leanne Guy Testing activity manager JRA1 All hands meeting,
ALMA Software B.E. Glendenning (NRAO). 2 ALMA “High Frequency VLA” in Chile Presently a European/North American Project –Japan is almost certainly joining.
July 2002 Board Meeting: Agenda Item 55 Discussion and Request for Direction on the Board Approved SB 2202 Work Plan Recommendation on Jurisdiction Diversion.
Draft TIP for E-rate. What is E-rate? The E-rate provides discounts to assist schools and libraries in the United States to obtain affordable telecommunications.
Response to ASAC Report of May 2004 Response to ASAC The Atacama Large Millimeter Array Tom Wilson and Al Wootten Science IPT.
ASI Review Padova ICC Contribution 1 WP3000 : Padova ICC Contribution Staff Alberto Franceschini (AF) [Professore Ordinario] Giulia Rodighiero (GR) [Ricercatore.
1 - RAP-11/17/08 SSEC Agenda Suggestions Preparations for SSEC2 at Cape Town Bob Preston.
SDD/DFS A. Modigliani VLT 2 nd Generation Instrumentation Pipelines, 19 Apr ACCEPTANCE TESTS Andrea Modigliani.
Searching for Gravitational Waves from Binary Inspirals with LIGO Duncan Brown University of Wisconsin-Milwaukee for the LIGO Scientific Collaboration.
Phase calibration pictures 3/9/10. Dark count image Required for: 1. determining image intensity in the absence of light. 2. also required for phase artifact.
The European Hubble Space Telescope Legacy Archive Wolfram Freudling.
EECS 582 Projects Mosharaf Chowdhury EECS 582 – W1611/8/16.
1 CS 501 Spring 2002 CS 501: Software Engineering Lecture 27 Software Engineering as Engineering.
Data Processing & Quality Control Group [ Faculty Meeting Sept Data Processing & Quality Control Quality Control Group head: Reinhard.
An Early Release Science Program Janice C. Lee STScI Science Mission Office JWST Science Working Group Meeting 29 April 2015.
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
1 Universities Space Research Association Science Instrument Pipeline Requirements SSSC 2009 September 29 Erick Young Director SOFIA Science Mission Operat.
LIGO-G Z How to organize the global network? Introduction to a “town meeting” Peter R. Saulson Syracuse University.
Faculty meeting - 13 Dec 2006 The Hubble Legacy Archive Harald Kuntschner & ST-ECF staff 13 December 2006.
1 Melynda Brooks, “Understanding the Origin of the Nucleon Spin” Understanding the Origin of the Nucleon Spin Andi Klein, P-23, Melynda Brooks P-25, Pat.
ASI Review Padova ICC Contribution 1 WP3000 : Padova ICC Contribution Staff Alberto Franceschini (AF) [Professore Ordinario] Giulia Rodighiero (GR) [Ricercatore.
1 Core Data Processing Software Plan Review – University of Washington, Seattle, WA – Sept th Data Management XXVIII IAU General Assembly.
Introduction to Web Authoring Bill Hart-Davidson AIM: billhd30 Session 21
A.Zanichelli, B.Garilli, M.Scodeggio, D.Rizzo
Calibration meeting summary
European Southern Observatory
CLAS Collaboration Organization for 12 GeV Operations
ECA 2010, Geneva, Switzerland Creating a synergy between BPM
Bell Ringer List three procedures discussed the first day of school.
Integrating Quality Activities in the Project Life Cycle
Internal Assessment 2016 IB Chemistry Year 2 HL.
CLAS Collaboration Organization for 12 GeV Operations
WORKING GROUP 2: PARTNERSHIPS PROGRESS UPDATE
Francesco Forti University and INFN, Pisa
Bell Ringer List three procedures discussed the first day of school.
Software Measurement Process ISO/IEC
Bell Ringer List three procedures discussed the first day of school.
EVLA Advisory Committee Meeting
How to Use PathologyOutlines.com to Help your Practice
Gustaaf van Moorsel September 9, 2003
Observatory Science Operations
Observatory Science Operations
Backtesting.
Bell Ringer List three procedures discussed the first day of school.
Presentation transcript:

raw data recipes SGDP Science Grade Data Products Wolfram Freudling DPD / SDP Group

Science grade data products (SGDPs) are data products which can be used as-is to extract scientific conclusions, or to carry out quantitative measurements. Instrument signature removed physical units signal-to-noise ratio close to the optimum error estimates all aspect of data taking and processing fully documented

Data Product Survey Nov 2008 About 50% overlap with DFS tickets

Proposed Projects

Science Ready Pipelines as reported by Survey CRIRES LS Spectroscopy GIRAFFE/MEDUSA Hawk-I UVES VISIR

address issues which apply to several instruments Multi-OB image combination Telluric lines tool illumination correction distortions background subtraction detector “monitoring”  Austrian contribution

Looking for science-ready instrument to develop Reflex workflow Hawk-I: – Major problem with background subtraction => fixed – Distortions: not enough calibration data needed recipe to analyze distortions distortions not stable => Austrian in-kind

Looking for science-ready instrument to develop Reflex workflow Hawk-I: – Major problem with background subtraction => fixed – Distortions: - not enough data - needed recipe to analyze distortions - distortions not stable => Austrian in-kind UVES: – error-bars – Combination of calibrations – CR-like artefacts => most issues fixed draft of report by Daniel Bramich

Extrapolation: Every instrument needs substantial work before data products can be considered science-grade Many easy to spot problems Problems often involve both calibration data and pipeline Bottle-neck is the resources available for validation and verification Only 2.5 astronomers work in SDP group => need IOT involvement Conclusions so far

New process to set priorities

Why? Tickets driven development not good way to set priorities Rush to submit something to pipeline priority meeting PSD resources are spread too thin: – do fewer things with more resources Projects are too software-centric – full support of projects by IOT/SDP Goals of projects are ill-defined – start with good specifications, test plan

“Proposals should be articulated, comprehensive, and set some specific measurable goals to improve data quality. “ DP B Proposals will be assessed by Data Products Board. Instrument upgrades should use the same route. SDP Proposals

The Board The Data Product Board is chaired by the head of SDP meets twice per year, monthly progress meetings Members: IOT Coordinator, head of LPO/PSO, the head of DMO/DPD, head of SDD/PSD, representative from INS/IPD First meeting: Feb 2011

but... IOT/IS does not have the time, resources, motivation... to write a SDP proposals It is de-motivating if IOT proposal needs DPB approval We will not be able to process some data if operational critical tickets are not addressed right away I prefer to talk directly to software developer We should work only on projects which we can complete. Approved projects get lots of resources. We need to use our resources efficiently. This is understood and accepted.

What should be in a proposal / data products requirements Specific requirements for data quality Proposal is not compilation of tickets Separate requirements from implementation suggestions Prototypes for algorithms are great, but... Detail resources

Effect on Pipeline Development All pipeline development frozen be default Tickets should be submitted but will not be attended immediately. Exceptions have to be approved on a case- by-case basis “new” pipelines under development not affected.

Pipelines not frozen VIMOS: support for upgrade XSHOOTER: still in development for several modes VISIR: basic support for the new detector only; additional development must go through an enhancement proposal OMEGACAM: support for commissioning VIRCAM: pipeline still in development for several modes PRIMA: still in development

Questions? Comments?