1 Spare Transformer Equipment Program (STEP). 2 STEP Objectives Industry initiative to increase the number of available spare transformers for use following.

Slides:



Advertisements
Similar presentations
Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
Advertisements

NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
Cleco Transmission Planning Summit Attachment K November 15, 2007 Terry Whitmore.
NERC Critical Infrastructure Protection Advisory Group (CIP AG) Electric Industry Initiatives Reducing Vulnerability To Terrorism.
WECC Reliability Management System
Training objectives & notes to the presenter… This training module is designed for an administrative commissioner ( Council Commissioner, Assistant Council.
Gcpud1 CRITICAL INFRASTRUCTURE PROTECTION NERC 1200 CIP CRITICAL INFRASTRUCTURE PROTECTION NERC 1200 CIP
Reporting the Economics of Reliable Energy Ralph Fehr, P.E. Engineering Consultant Reliability of the U.S. Power Grid.
Congestion Management in a Market Environment 2 nd CIGRE / IEEE PES International Symposium San Antonio, Texas October 5, 2005 Kenneth W. Laughlin.
1 “The National Grid” Presented To The Fall Tri-State Member Services Conference October 10, 2001 Covington, KY Jeff Mitchell ECAR Manager, Transmission.
Faculty Separations Carmen Shockley Director, Academic Personnel Services August 18, 2014.
Jeffery J. Gust IOWA INDUSTRIAL ENERGY GROUP FALL CONFERENCE Tuesday, October 14, 2014 MidAmerican Energy Company.
Railroad 101 Equipment April 9, Next Generation Corridor Equipment Committee  Established by Section 305 of the Passenger Rail Investment and Improvement.
1 FRCC Compliance Organization and Entity Registration 2008 FRCC Compliance Workshop.
IMPERIAL VALLEY CONFERENCE July 21, SOLICITATION RENEWABLES PORTFOLIO STANDARD.
Your Intelligent Fleet Community™ Providing Answers Community | Benchmarking | Education| Tools.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
Pasadena Water & Power Intermountain Power Project Amend the Existing Contracts Participate in Renewal Project Pasadena City Council Item 11 July 20, 2015.
Charles Hosken, General Manager Imperial Irrigation District
Presentation to Energy & Technology/Planning & Development Committees Considerations on Establishing Municipal Utilities Joint Informational Forum Legislative.
SDG&E Summer Preparedness July 2012 Update © 2012 San Diego Gas & Electric Company. All copyright and trademark rights reserved. 1.
System Operations Staffing Request Presented to the ERCOT Board Of Directors By Sam Jones, COO November 16, 2004.
Spare Transformer Equipment Program (STEP) Public Service Commission of Utah – Technical Conference July 8, 2014.
National Power Corporation Small Power Utilities Group POWER SUPPLY AGREEMENT.
Peak RCCo Performance Metrics Draft –November 2013.
Compliance Monitoring and Enforcement Audit Program Background Information.
1 Crisis Management / Emergency Management Overview.
Powering Alberta AESO Annual General Meeting May 14, 2009 Reliable Power Reliable Markets Reliable People.
Overview of WECC and Regulatory Structure
1. 2 NERC Bulk Electric System (BES) Definition (NERC Glossary of Terms Used in Reliability Standards) FERC Order 693 FRCC Handbook Review Task Force.
Status Report for Critical Infrastructure Protection Advisory Group
Phoenix Convention Center Phoenix, Arizona When Prevention and Preparation May Not be Enough: Resilience and Recovery for the Electricity Sub-Sector Operational.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
© 2005 San Diego Gas and Electric and Southern California Gas Company. All copyright and trademark rights reserved 2006 Low Income Energy Efficiency Program.
Overview of Southern Company Transmission
Generation assets important to the reliable operation of the Bulk Electric System What does this mean?
COMPLIANCE WITH THE SIGNING AND FILING OF PERFORMANCE AGREEMENTS BY HEADS OF DEPARTMENT BRIEFING TO THE PORTFOLIO COMMITTEE ON PUBLIC SERVICE AND ADMINISTRATION.
2012 Member Representatives Committee Members System Coord & PlanningChuck ManningElectric Reliability Council of Texas, Inc. System Coord & Planning AlternateKen.
Transmission Owners and Operators Forum NERC Stakeholders Meeting 8/1/06 Ad-Hoc T. O. O. Forum Group.
POWER SYSTEM PLANNING CHARTER AND PROCESSES UPDATES Presentation to TAC Sept 9, 2004 Transmission Services Ken Donohoo, Manager of System Planning
Earthquake Response and Recovery Planning at a Major Canadian Electric Utility Presented by Doug McLeod Disaster Preparedness Coordinator BC Hydro British.
Standards Review Subcommittee Update August 17, 2010.
Florida Public Service Commission Restoration Workshop January 23, 2006 William H Mayer, P.E. Edison Electric Institute EEI’s Mutual Assistance Program.
Federal Energy Regulatory Commission MISO/Alliance Companies’ RTO Status Reports Presented by: Joseph Power Tony Ingram Rahim Amerkhail Patrick Clarey.
© 2010 AT&T Intellectual Property. All rights reserved. AT&T, AT&T logo and all other marks contained herein are trademarks of AT&T Intellectual Property.
How the Transmission System Works Really William F. Reinke.
1 CREPC 101 September 19, 2005 San Diego. 2 CREPC 101 CREPC History – Doug Larson Operation of Committee – Marsha Smith Relationship with other Western.
Grid Reliability Metrics by Jim Dyer Electric Power Group, LLC January 29, 2004 Washington, DC Transmission Reliability Research Review.
Renewable Energy Transmission Initiative 2.0 Organizational Structure and Work Plan California Energy Commission and California Public Utilities Commission.
2006 TRANSMISSION CUSTOMER FORUM September 21, 2006 Andrew J. Dearman, III Executive Vice President & Chief Transmission Officer.
1 Thoughts on ERCOT-Wide Critical Infrastructure Protection Committee Bill Muston October 31, 2006.
RiversidePublicUtilities.com Arts & Innovation RiversidePublicUtilities.com MOD GENERATOR TESTING REQUIREMENTS RESOURCE PLANNERS LeeAnne Uhler, Regulatory.
2015 Hurricane Season Preparedness Briefing Jorge Puentes Engineering Manager – Northeast and Northwest Divisions March 18, 2015.
2014 Hurricane Season Preparedness Briefing Jorge Puentes Technical Projects Manager – Northeast and Northwest Divisions March 26, 2014.
ACEC National Energy and Environment Challenges in Asset Management? Brian Long Transmission Line Performance Xcel Energy August 15, 2015.
RA workshop presentation Karl Meeusen, Ph.D. Senior Advisor – Infrastructure Policy CPUC Resource Adequacy Workshop February 18, 2016.
Solving the Energy Puzzle Understanding the Rules of Energy Delivery Electricity Natural Gas Tariffs Solar Combined Heat and Power Generation Distribution.
NERC BAL-005, BAL-006, FAC-001 Gary Nolan WECC ISAS April 20, 2016.
Strategic Utility Consulting Smart Grid and its Opportunities for New Rate Designs April 28, 2016 Dale Pennington Managing Director UtiliWorks Consulting,
East Region Source: J.D. Power and Associates 2004 Gas Utility Residential Customer Satisfaction Study SM Charts and graphs extracted from this press release.
Oversight Update Michael Moon, Vice President Registered Entity Oversight W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Kenneth Silver Los Angeles Department of Water & Power
California Product Offerings
ERCOT Technical Advisory Committee June 2, 2005
Eastern Region PPL Electric Utilities Allegheny Power
NERC TPL Standard Overview
Pacific Power Seismic Preparedness Update
NERC Critical Infrastructure Protection Advisory Group (CIP AG)
Planning Coordinator - Gap Resolution Team (GRT)
Presentation transcript:

1 Spare Transformer Equipment Program (STEP)

2 STEP Objectives Industry initiative to increase the number of available spare transformers for use following a terrorist attack Participating utilities commit to share their spares by means of a binding agreement Participating utilities obligate themselves to provide a calculated number of spares to different voltage classes (required obligation) Required obligation varies depending on connected load and current level of preparedness

3 Current Industry Participation Number of utilities involved in the project to date –54 Number of utilities that have signed the agreement –20 Number of utilities with signatures pending –17

4 Utilities That Have Signed The Agreement Allegheny Power American Electric Power American Transmission Company Cinergy Corporation Duke Power First Energy Corporation Florida Power and Light Company Michigan Electric Transmission Company Northeast Utilities Pacific Gas and Electric Company Pepco Holdings Public Service Company of New Mexico Public Service Electric & Gas Puget Sound Energy San Diego Gas and Electric Southern California Edison Southern Company Texas-New Mexico Power Company TXU Electric Delivery Company Xcel Energy

5

6 Binding Sharing Agreement - 1 Open to all types of utilities A Utility does not become a participating utility until it secures any necessary regulatory approvals and two other utilities are participating in a class. Obligation –Calculated by voltage class –Recalculated each year –Two years to meet initial obligation –If a committed spare is used, a utility agrees to replace the transformer

7 Binding Sharing Agreement - 2 Triggering Event Call Rights – A participating utility is qualified to exercise a call right if: –It is in compliance with its obligations under the Sharing Agreement, –Has suffered the loss or long-term disabling of one or more substations in connection with a triggering event, and, –After taking all actions necessary to use all spare transformers that it owns or has rights to access, it is still unable to satisfy an N-0 contingency.

8 Binding Sharing Agreement - 3 Committed Spare Transformers can be jointly owned Spare transformers committed under the Sharing Agreement are to be maintained in accordance with Good Utility Practices. Governance under Sharing Agreement –Agreement provides for an overall Equipment Committee, –Equipment Sub-Committee for each equipment class, and –Eleven-member Executive Committee (8 current NERC Regions, 1 small, 2 at large) Utility may withdraw its membership from an equipment class only upon a minimum of two year's prior written notice to the Equipment Committee and the relevant Equipment Sub- Committee.

9 Voltage Classes Currently Under Consideration

10 Voltage Obligation Calculation Step 1 for Self Assessment Each Utility Reviewed the five most critical substations in each voltage class Assumed all equipment and spares in the substation were destroyed Assumed system recovery to N-0 condition Each utility identified how it would respond to the loss, e.g. –Serving the load from other substations –Re-dispatching generation –Moving in a spare from another location –Moving in an in-service transformer from another substation Acquiring a spare from outside their system

11 Voltage Obligation Calculation Determining Transformers Required Utilities determined number and sizes of transformers needed to restore their system after a 5 substation attack Data for all participating utilities within a voltage class is compiled Total need for the class is determined by worst case utility’s need Each utility is assigned an obligation (MVA) based on their proportion of spares needed to restore their system and their proportion of total connected transformer MVA in class Utilities can meet their obligation with any combination of existing spares or newly acquired spares, including jointly owned spares

12 Current Activity The STEP Agreement has been sent out for execution Companies are currently signing up Obligation calculation and subcommittee leadership election meeting will be April in Dallas

13 For Additional Information Sharing Agreement –Sylvia Foya – General Administration –Gail Royster – Obligation Calculation –Ken Hall –