Presentation subtitle: 20pt Arial Regular, Recommended maximum length: 2 lines IBM logo must not be moved, added to, or altered in any way. Indications.

Slides:



Advertisements
Similar presentations
Presentation subtitle: 20pt Arial Regular, Recommended maximum length: 2 lines IBM logo must not be moved, added to, or altered in any way. Indications.
Advertisements

Retail Planning & Optimization Solution Elevator Pitches.
Supply Chain Logistics Management
Leveraging JDA technology to support a Shelf Connected Supply Chain Amy Higgins VP, Space Management & Analytics Sears Holdings Corporation 1.
Supply Chain 1. 2 Creation and delivery of Products and Services Operations is about the creation of a product or service which adds value to the consumer.
Chapter 8 Integrating the supply chain
The Itron logo is integrated into the background and can not be modified, moved, added to, or altered in any way. Slide Heading Style 24pt Arial Regular.
Purpose: These slides are for use with customers by the Microsoft Dynamics NAV sales force and partners. How to use: Add these slides to the core customer.
PSeries Advanced Technical Support © 2002 IBM Corporation Presentation subtitle: 20pt Arial Regular, teal R045 | G182 | B179 Recommended maximum length:
OMSAN LOJİSTİK. Inventory Positioning Inventory Planning and Management Latin America Logistics Center Logistics Management Series -
Main Function of SCM (Part II). Main Functions  Procurement (supplier selection, optimal procurement policies, etc.)  Manufacturing (plant location,
Template release: Jun 2014 Go to: ae1.usca.ibm.com:9081/WorkplaceXT/ContainerLogin.jsphttp://cm-p8- ae1.usca.ibm.com:9081/WorkplaceXT/ContainerLogin.jsp.
SUPPLY CHAIN MANAGEMENT SYSTEMS Part I. 7-2 LEARNING OUTCOMES 1.List and describe the components of a typical supply chain 2.Define the relationship between.
Introduction to Supply Chain Management Designing & Managing the Supply Chain Chapter 1 Byung-Hyun Ha
Main Function of SCM (Part I)
Template release: Jun 2014 Go to: ae1.usca.ibm.com:9081/WorkplaceXT/ContainerLogin.jsphttp://cm-p8- ae1.usca.ibm.com:9081/WorkplaceXT/ContainerLogin.jsp.
IBM Retail Store Solutions November 2003 Presentation subtitle: 20pt Arial Regular, teal R045 | G182 | B179 Recommended maximum length: 2 lines Confidentiality/date.
Active Technologies - HRL Active Technologies | 14/04/03 Presentation subtitle: 20pt Arial Regular, teal R045 | G182 | B179 Recommended maximum length:
IBM Software Group © 2006 IBM Corporation Confidentiality/date line: 13pt Arial Regular, white Maximum length: 1 line Information separated by vertical.
Organization for the Advancement of Structured Information Standards OASIS | March 04, 2003 Presentation subtitle: 20pt Arial Regular, teal R045 | G182.
© 2007 IBM Corporation Storage Area Network Management Modeling Simulation Eclipse Aperi SAN Simulator Ramani Routray.
IBM CONFIDENTIAL | PREPARED BY IBM ATTORNEY Presentation subtitle: 20pt Arial Regular, teal R045 | G182 | B179 Recommended maximum length: 2 lines Confidentiality/date.
IBM Research © 2008 IBM Corporation Confidentiality/date line: 13pt Arial Regular, white Maximum length: 1 line Information separated by vertical strokes,
UNIT –V SUPPLY CHAIN MANAGEMENT
Supply Chain Management (SCM) Basics
Presentation transcript:

Presentation subtitle: 20pt Arial Regular, Recommended maximum length: 2 lines IBM logo must not be moved, added to, or altered in any way. Indications in green = Live content Indications in white = Edit in master Indications in blue = Locked elements Indications in black = Optional elements Presentation title: 28pt Arial Regular Recommended maximum length: 2 lines For client presentations, client’s logo may go in this area © 2008 IBM Corporation Smarter Solutions for Retail: Optimal Replenishment Model Gabriel Mesas, Associate Partner IBM Global Business Services Spain Supply Chain Visibility and Optimization for a smarter planet

IBM logo must not be moved, added to, or altered in any way. Background should not be modified, Slide heading: 28pt Arial Regular, Maximum length: 2 lines Slide body: 18pt or 20pt Arial Regular, white Recommended maximum text length: 5 principal points Group name: altered in any way. Maximum length: 1 line Indications in green = Live content Indications in white = Edit in master Indications in blue = Locked elements Indications in black = Optional elements Supply Chain Visibility and Optimization for a smarter planet © 2009 IBM Corporation 2 IBM Sensor Solutions Agenda Bisuness Issues 1 Transformation Enablers 2 New Replenishment Model 3 Implementation Approach 4 References 6 Benefits Delivered 5

IBM logo must not be moved, added to, or altered in any way. Background should not be modified, Slide heading: 28pt Arial Regular, Maximum length: 2 lines Slide body: 18pt or 20pt Arial Regular, white Recommended maximum text length: 5 principal points Group name: altered in any way. Maximum length: 1 line Indications in green = Live content Indications in white = Edit in master Indications in blue = Locked elements Indications in black = Optional elements Supply Chain Visibility and Optimization for a smarter planet © 2009 IBM Corporation 3 IBM Sensor Solutions 1.Business Issues Map: Traditional Supply Chain Replenishment model: Issues and Volume Automatic Replenishment Manual Replenishment DIST. CENTERSUPPLIERSREPL. WAREH. Replenishment System STORES Logistic Flow Replenishment Flow Logistic Flow Replenishment Flow Pressure to reduce stock without integral vision High proportion of manual replenishment Promotional activity not inegrated in logistic model Complex operations and planning in DC and WH Planners focus on problem solving Logistics responsibilities spread across departments Average retailer: products / 500 stores / 10 DCs = 400 Million Decisions daily 3% of total sales profitability

IBM logo must not be moved, added to, or altered in any way. Background should not be modified, Slide heading: 28pt Arial Regular, Maximum length: 2 lines Slide body: 18pt or 20pt Arial Regular, white Recommended maximum text length: 5 principal points Group name: altered in any way. Maximum length: 1 line Indications in green = Live content Indications in white = Edit in master Indications in blue = Locked elements Indications in black = Optional elements Supply Chain Visibility and Optimization for a smarter planet © 2009 IBM Corporation 4 IBM Sensor Solutions Banks Suppliers Distributors Carriers/ 3PL Customs DCs Retailer Store 3 Store 2 Store 1 Call Center Web Catalog Customers Warehouses Plan, Forecast & Scale capacity to actual needs Automatically generate accurate DC orders Forecast customer demand accurately Level Stock to minimise waste Plan best transport options 1. Pressure in SC for 50 years: Still room for improvement Pressure to reduce stock without integral vision Automatically generate accurate store orders Turn store demand into DC demand Incremental improvements dried out. Supply Chain Transformation towards integration is required for significant leap.

IBM logo must not be moved, added to, or altered in any way. Background should not be modified, Slide heading: 28pt Arial Regular, Maximum length: 2 lines Slide body: 18pt or 20pt Arial Regular, white Recommended maximum text length: 5 principal points Group name: altered in any way. Maximum length: 1 line Indications in green = Live content Indications in white = Edit in master Indications in blue = Locked elements Indications in black = Optional elements Supply Chain Visibility and Optimization for a smarter planet © 2009 IBM Corporation 5 IBM Sensor Solutions 2. Transformation Enablers: Unprecedented power allows Supply Chain Integration ILOG C-PLEX Optimization Engine & LogicTools Inventory Analyst DIAGNOSE OPTIMIZE

IBM logo must not be moved, added to, or altered in any way. Background should not be modified, Slide heading: 28pt Arial Regular, Maximum length: 2 lines Slide body: 18pt or 20pt Arial Regular, white Recommended maximum text length: 5 principal points Group name: altered in any way. Maximum length: 1 line Indications in green = Live content Indications in white = Edit in master Indications in blue = Locked elements Indications in black = Optional elements Supply Chain Visibility and Optimization for a smarter planet © 2009 IBM Corporation 6 IBM Sensor Solutions Block 4: Realign Responsibilities along Organization Block 3: Empower IT Block 2: Streamline Satellite Processes Block 1: Integrate Core Processes Master Data Management Integration of the forecasting sales Stores & DC Import-Export Demand Forecasting Inventory & Replenishment planning Replenishment Management Store Operations Capacity Management at DC & RW Promotion Management 3. New Replenishment model proposition Vision of an Integrated Supply Chain Assortment & Catalog Management Warehouses Management Picking, expeditions

IBM logo must not be moved, added to, or altered in any way. Background should not be modified, Slide heading: 28pt Arial Regular, Maximum length: 2 lines Slide body: 18pt or 20pt Arial Regular, white Recommended maximum text length: 5 principal points Group name: altered in any way. Maximum length: 1 line Indications in green = Live content Indications in white = Edit in master Indications in blue = Locked elements Indications in black = Optional elements Supply Chain Visibility and Optimization for a smarter planet © 2009 IBM Corporation 7 IBM Sensor Solutions Store Replenishment Ordering Forecast Daily Sells Order Quantity Forecast Forecast Ilog - CD Regular Orders Promotional history Formula Promotional Index Promotional Order Promotions Flow-Through Flow-Through Orders Order Consolidation Capacity Constrains Auto – approval strategy Exceptions Integrated Optimization Cicle Order EOQ 4 6 Order Approval Other demand flows 3. New Replenishment model proposition Optimizing in practical and mathematical terms

IBM logo must not be moved, added to, or altered in any way. Background should not be modified, Slide heading: 28pt Arial Regular, Maximum length: 2 lines Slide body: 18pt or 20pt Arial Regular, white Recommended maximum text length: 5 principal points Group name: altered in any way. Maximum length: 1 line Indications in green = Live content Indications in white = Edit in master Indications in blue = Locked elements Indications in black = Optional elements Supply Chain Visibility and Optimization for a smarter planet © 2009 IBM Corporation 8 IBM Sensor Solutions 4. Implemantation Approach Much more than implementing technology Business Model Simplification Redefinition of Stock Responsibilities Leadership and establishment of cost objectives Optimal logistic model definition Work by exception not by checking every order Simplification by logistic category Process Simplification Move stock upstream (Rick pooling effect) Put together the assortment definition & logistic model Use order forecast of store to pilot the supplier replenishment Flow-through with Suppliers Roles & Responsibilities Simplification Redefine the store role as expert in the client but not in the replenishment Synchronize replenishment and logistics Define KPIs to control the SC in an integrated way IT Simplification Order & Promotion Workflow Integrate capacity constrains & optimization Auto-approval of orders Exception Management of Orders Incorporate the new demand models (Flow-Through) Automate the order forecast in stores

IBM logo must not be moved, added to, or altered in any way. Background should not be modified, Slide heading: 28pt Arial Regular, Maximum length: 2 lines Slide body: 18pt or 20pt Arial Regular, white Recommended maximum text length: 5 principal points Group name: altered in any way. Maximum length: 1 line Indications in green = Live content Indications in white = Edit in master Indications in blue = Locked elements Indications in black = Optional elements Supply Chain Visibility and Optimization for a smarter planet © 2009 IBM Corporation 9 IBM Sensor Solutions 1. Information Integration: Demand forecast of Stores 3. Minimize replenishment Cost (EOQ) vs. force stock reduction 4. Promotional stock & replenishment management at the DC Level 2.- Maximize replenishment volumes by : Cross-docking & Flow-Through 5. Make the replenishment process automatic 7. Adjust the new organization to be oriented to the new process 6. Massive management of Administrative Parameter 4. Implemantation Approach Implement to Innovate

IBM logo must not be moved, added to, or altered in any way. Background should not be modified, Slide heading: 28pt Arial Regular, Maximum length: 2 lines Slide body: 18pt or 20pt Arial Regular, white Recommended maximum text length: 5 principal points Group name: altered in any way. Maximum length: 1 line Indications in green = Live content Indications in white = Edit in master Indications in blue = Locked elements Indications in black = Optional elements Supply Chain Visibility and Optimization for a smarter planet © 2009 IBM Corporation 10 IBM Sensor Solutions 4. Implemantation Approach An enterprise transformation not a systems implementation STORE AUTOMATIC RE-ORDERING months 5 months FLOW THRU 4 months DC AUTOMATIC RE-ORDERING 6 months PRIMERA TIENDA DOCK SCHEDULING 3 months SUPPLIER INTEGRATION 5 months BENEFITS DELIVERED PROMOTIONAL PROCESS DIAGNOSTICQUICKWINS

IBM logo must not be moved, added to, or altered in any way. Background should not be modified, Slide heading: 28pt Arial Regular, Maximum length: 2 lines Slide body: 18pt or 20pt Arial Regular, white Recommended maximum text length: 5 principal points Group name: altered in any way. Maximum length: 1 line Indications in green = Live content Indications in white = Edit in master Indications in blue = Locked elements Indications in black = Optional elements Supply Chain Visibility and Optimization for a smarter planet © 2009 IBM Corporation 11 IBM Sensor Solutions 5. Benefits delivered

IBM logo must not be moved, added to, or altered in any way. Background should not be modified, Slide heading: 28pt Arial Regular, Maximum length: 2 lines Slide body: 18pt or 20pt Arial Regular, white Recommended maximum text length: 5 principal points Group name: altered in any way. Maximum length: 1 line Indications in green = Live content Indications in white = Edit in master Indications in blue = Locked elements Indications in black = Optional elements Supply Chain Visibility and Optimization for a smarter planet © 2009 IBM Corporation 12 IBM Sensor Solutions 6. References Example