NASA Global Hawk- Lessons Learned Aircraft, Staffing, Flight Op’s Dave Fratello HS3 Science Team Meeting May 7, 2013.

Slides:



Advertisements
Similar presentations
Emergency COA Process Presented to: UAS All Users TELCON
Advertisements

01/14/01 S2K+1 Field Training Spring /14/01 FAR 121 Air Safety PAD Operational Responsibility shared by: –P ilots –A TC –D ispatchers Enhancing.
AVIATION WEATHER DEBBIE SCHAUM.
Pilots & Weather Considerations Federal Aviation Administration 1.
Air Traffic Management
NASA Global Hawk Aircraft Status, Integration, Op’s, Schedule 8May’12 Hurricane and Severe Storm Sentinel (HS3) Science Campaign 2012.
Flight Testing Advanced Unmanned Aircraft Michael McDaniel - AIR Naval Air Systems Command NAS Patuxent River, MD, USA DISTRIBUTION STATEMENT A:
PROPOSED FLIGHT PATTERNS. Flow pattern and area of flight operations.
METEOROLOGICAL INFORMATION FOR GENERAL AVIATION IN SLOVENIA.
Instrument Ground Training Module 5
Runway Incursion’s Affect on FAA Approved Pilot Training and Pilot and Flight Instructor Certification and Part 121 Pilot Checking – Andy Edwards – Manager.
Robbie Hood NOAA UAS Program Director 20 June 2013.
Departure Hazards: Turbulence, Icing, C/V, Storms (winter/conv), Oceanic/VA Decisions- problem ID Weather information needed Update Rate (Info Age) SpatialObstacles.
HS3 S CIENCE T EAM M EETING F IELD O PERATIONS FOR 2013 M.V ASQUES 9 M AY
Presented to: MPAR Working Group By: William Benner, Weather Processors Team Manager (AJP-1820), FAA Technical Center Date: 19 March 2007 Federal Aviation.
INTERNATIONAL H 2 O PROJECT (IHOP_2002) FLIGHT PLANNING PLAYBOOK.
AIR LAW – FLIGHT RULES Airspace classification -1 A.Above ft (FL200) Instrument (IFR) flights only B Visual (VFR) and Instrument (IFR) flights* C.All.
Presented to: By: Date: Federal Aviation Administration Gulf of Mexico 50 NM Lateral Separation – RNAV Routes Project Project Overview ATO Oceanic & Offshore.
Farnborough Airspace Change Proposal Briefing to FACC 7 th March 2013.
NASA Global Hawk Aircraft Status, Integration, Op’s, Schedule 23 Oct 2013 ATTREX
Sep 2012 Lesson 3.4 Air Law Air Traffic Rules. Reference From the Ground Up Chapter 5.1: Air Traffic Rules and Procedures Pages
May 2010Approval of Experimental Aircraft for Instrument Flight APPROVAL OF EXPERIMENTAL AIRCRAFT FOR INSTRUMENT FLIGHT Richard L (Dick) Newman (M) and.
UNITED AIRLINES LEONARD J. SALINAS FLIGHT DISPATCH 21APR2010 Congressional Hazards Caucus Alliance.
Chapter 5:intrument flight rules
AVAPS F LIGHT S UMMARY HS NOAA ESRL G ARY W ICK R YAN S PACKMAN D ARREN J ACKSON D AVE C OSTA NCAR T ERRY H OCK D EAN L AURITSEN C HARLIE M ARTIN.
AIR TRAFFIC CONTROL Presented by S.SUMESWAR PATRO Regd no:
Recite a prayer…(15 seconds)
Line Maintenance (on Aircraft)
Chapter 6 Section A. STAR Standard Terminal Arrival Route –Depart the enroute structure –Navigate to destination –Terminate with an instrument approach.
6-1 Design of UAV Systems UAV operating environmentsc 2002 LM Corporation Lesson objective - to discuss UAV Operating Environments including … National.
Data Link Communications
Dr. Scott Braun Principal Investigator. Hurricane Intensity Is Difficult To Predict Intensity prediction is difficult because it depends on weather at.
Air Operations Branch Director Course Safety Issues Part 1 U.S. AIR FORCE AUXILIARY U.S. AIR FORCE AUXILIARY.
1 World Dispatch Summit Toronto, Canada May 2002 ETOPS Presentation Ralph Webster Transport CanadaTransports Canada Safety & SecuritySécurité et sûreté.
Part 73 Special Use Airspace Subpart A General Special Use Airspace Defined dimensions –Vertical limits defined by designated altitude floors and.
Functional Check Flight Symposium Andre Tousignant C.I.M. Director Air Safety Investigation Office (ASIO) Bombardier Aerospace Vancouver Feb 8, 2011.
NASA’s Hurricane and Severe Storm Sentinel (HS3): Results from the 2012 Deployment and Plans for 2013 Scott Braun Paul Newman (NASA/GSFC) 3/5/201367th.
Lecture 3: Air Traffic Control Tower
Presented to: By: Date: Federal Aviation Administration OPERATIONAL SUITABILITY EVALUATIONS Weather-in-the-Cockpit Workshop Robert Ruiz, AFS-430 August.
HS3 Science Lessons. Aircraft The inability of AV-1 to get over storms is a critical shortcoming. Some PIs were funded to study the results from AV-1.
5 Ops Objectives. Decisions/Things to Keep in Mind (as a forecaster) Mission has to decide where to fly and what category of objective they’re fulfilling.
The Aircraft Dispatcher “One stop shopping” source of information for the pilot.
Tim Myers – Metron Aviation August 26, Evaluate weather-related operational inefficiencies or safety hazards in remote, non-radar controlled airspace.
Excerpts from Tom Jackson’s slides shown at Nov 2013 SMAP CalVal workshop with comments added by E. Kim in green TJJ–1 Green comments added by E.Kim.
Mesoscale Predictability Experiment MPEX National Center for Atmospheric Research Research Aviation Facility.
Presented to: NASA Applied Sciences Weather Program Review By: Warren Fellner, Aviation Weather Office Date: November 18, 2008 Federal Aviation Administration.
AIR TRAFFIC CONTROL.
Lecture 9: Ecological Factors & Aircraft Performance AIRCRAFT WEIGHT & PERFORMANCE.
Presented to: By: Date: Federal Aviation Administration ADS-C CDP Climb/Descend Procedure Implementation Project Update IPACG/39 Keith Dutch, FAA 03 –
Communications, Airspace and a bunch of other stuff ! Rick L. Crose Orlando International Tower.
Mission Science lessons learned Flight Should be able to switch Ku coverage in flight – Dave F. Scientists need to keep a close eye on cloud top height.
Airport Noise Compatibility Study Group Navigation Committee AIRPORT NOISE COMPATIBILITY PROGRAM Louisville and Jefferson County FINDINGS AND RECOMMENDATIONS.
Use of Unmanned Aircraft Systems (UAS) For Environmental Applications Robbie Hood, NOAA UAS Program Director NOAA Office of Oceanic and Atmospheric Research.
HS3 Review and Planning Meeting Scott Braun. Goals of Meeting Review 2012 campaign – Initial science results – Lessons learned Prepare for 2013 campaign.
UNMANNED AVIATION QUALIFICATION FLIGHT SKILLS TEST BRIEFING UAVAirways Limited | Registered in England No: | UAQ Skills Test v1.0.
National Airspace System
Sensing Hazards with Operational Unmanned Technology: NOAA's multi-year plan to deploy the NASA Global Hawk aircraft for high impact weather Michael L.
2015 HS3 Science Team Meeting Ames Research Center, Moffett Field, CA.
Where can we profile through the TTL? Based on forecasts of ENSO and QBO phasing, we will likely encounter temperatures somewhere between 2009 and 2010.
Part 117 Flight and Duty Limitations and Rest Requirements: Flightcrew Members.
UAS in the NAS Technology Working Group Out-Brief Suborbital Science Technical Roadmap.
Safer Skies Personal Equipment Chart Computer & plotter Flight logs Flight plan form FAR/AIM AFD.
REGULATIONS FOR ARMY AIRCRAFT CW2 ROBERT GOEBEL. Administrative Please turn off all: –Cell phones –Beepers –Palm Pilots –Gameboys –Stereos –Watch alarms.
REGULATIONS / PUBLICATIONS VFR AND AIRSPACE CLASSIFICATION CPT Fishburn.
FAA Flight Standards AFS-220/430 FPAW 2017 Summer
AIR TRAFFIC ONTROL.
U.S. AIRSPACE.
Airports, Airspace, & Radio Communication
Portland Tower/TRACON UAO Customer Briefing July 2010
Oceanic and International Operations
Presentation transcript:

NASA Global Hawk- Lessons Learned Aircraft, Staffing, Flight Op’s Dave Fratello HS3 Science Team Meeting May 7, 2013

Lessons Learned - Aircraft 2 Spares, GSE shortages (Fuel Freeze Tester, Defuel Kit, Fuel Nozzles, Spare Parts, etc.) - Mike Bereda taking lead… yes, we’ll have spare bulbs Runway 22 Departure GPS Mission Pt. (AGE Equip) - New Start Pt. identified, being entered into Mission Plan Crew Staffing Levels & Qualifications - Every OA Tech and Lead now VTC Qualified - New Staffing Plan in place (to be discussed later) GHMOF to Trapper VHF Comm’s intermittent for 22 Departure - In Work – will not be an issue if GHOC-East is used VAPCAPES Scheduling constraints - Being worked – DFRC-proposed Track C&D will open Op’s

Lessons Learned – GH Staffing Staffing Plan is complete and approved at DFRC - GH Team (all groups) will provide man-days support at WFF - Hangar Crew (Mech’s, Tech’s) Staffing Plan will provide 7-day/wk, 15-hr/day support AV-1 Readiness Issue (HS3 delay was a Staffing issue) - Aircraft is flight ready (currently being used for UAVSAR / LVIS Cert. flights) Personnel “Fatigue” Assessment – DFRC requirement - Caused issues in Current 2013 WFF/DFRC Staffing is “Green” Fatigue Assessment No demonstration of Back-to-back Op’s - GH Team is committed to 3 Back-to-back Flight Op’s A take-off approx. 2-3 hrs after a landing of other aircraft - WFF ‘13 GH Staffing Plan will provide Back-back flights

Lessons Learned - Staffing

6

7

Lessons Learned – Others 8 Instrument issues related to Aircraft: AVAPS and HIRAD RF issues being worked HIWRAP Temp. issuebBeing worked with P.I. and possible Heater wiring change Camera Performance HDVis Camera icing Issue believed resolved, demonstrated during ATTREX Low-light Camera resolution, etc New lens in work, Camera software. Same on both aircraft “Piggyback” Integration being worked prior to start of HS3 Integ. IT “Backbone Data-rate limitation Increased significantly – possibly no “web” restriction COMSEC – now a requirement for 24/7 Access to GH Hangar Fire Waiver – being worked

Flight Operations: Early coordination with FAA and DOD resulted in no surprises with operations and COA. – early engagement and face-to-face meetings pay large dividends Issuing of COA was delayed due to an unexpected USAF event. –start process as early as feasible Dropsonde coordination went smoothly –Getting real time traffic information from ATC was provided by controllers despite NY Center’s initial concerns VACAPES is a very busy workspace and potentially difficult to schedule. –the current 72 hour requirement is not ideal, but is stipulated in their standard procedure –The Test Track-C Scheduling Requirement for not more than 2, 1 hour periods per day almost was the cause of a flight cancellation. This is being reviewed in the updated LOA More info on later slide The Mission Tool Suite was essential to hazardous weather avoidance. –pilots and scientists worked to make this a valuable decision making tool A dedicated flight planning pilot (not on the flight schedule) is essential for coordinating multi- day flight operations. –There will be a dedicated Pilot at WFF to handle all Flight Planning and FAA Coordination Lessons Learned – Flt. Op’s

In-Flight Weather Limitations: 1.Do not approach thunderstorms within 25 nm during flight at FL500 or below 2.When flying above FL500: –Do not approach reported lightning within 25NM in areas where cloud tops are reported at FL500 or higher. –Aircraft should maintain at least ft vertical separation from reported lightning if cloud tops are below FL500 3.No over-flight of cumulus tops higher than FL500 4.No flight into forecast or reported icing conditions 5.No flight into forecast or reported moderate or severe turbulence Lesson Learned: The pilots were able to maintain weather limitations using MTS tools. - If it is believed that the limitations in Item 2 should be changed, a technical case can be made to DFRC management through the Tech Brief Process. Lessons Learned – Flt. Op’s

Other Questions 1) Will New York's "close vetting" of our pre-flight dropsonde patterns be relaxed? –Dropsonde procedures are described in the Interagency Hurricane Operations Plan, which requires a NOTAM (issued prior to flight). –Pilots have the ultimate responsibility for release of sondes. –Dropsondes deployed in the hurricane environment may have greater flexibility, depending on the type of clearance received (box, circle, other traffic, etc). 2) Will the CoA allow CPL to operate over land for altitudes > FL530? –Extensive Laser Ops to be permitted during the Range Flt (using R-2502) –Discussions have been conducted with FAA and it seems likely we will get approval for CPL operations during the over-land transit portions of the flight. –Once FAA approves the flight track for CPL, an addendum to the COA is required 3) Can we open up the possibility of night flights from WFF? –This will be discussed by WFF and DFRC flight ops teams to see if this can be conducted safely. 4) Will expanded scheduling of VACAPES be a big problem? –The LOA with VACAPES, PAX River, WFF, and DFRC is currently being revised. –Test Track C is being split in half to allow PAX River to access airspace during GH departures and arrival to reduce the impact to F-35 test flights –NASA has requested two (2) three hour windows per calendar day for scheduling