Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring 2009-2010 Lot Sizing Slide Set #11.

Slides:



Advertisements
Similar presentations
BU Decision Models Integer_LP1 Integer Optimization Summer 2013.
Advertisements

Module C6 Other EOQ Type Models.
ALTERNATIVES LOT-SIZING SCHEMES
Inventory Modeling Concepts
Lecture 5 Decision Analysis Chapter 14.
6 | 1 Copyright © Cengage Learning. All rights reserved. Independent Demand Inventory Materials Management OPS 370.
© Wallace J. Hopp, Mark L. Spearman, 1996, The (Q,r) Approach Assumptions: 1. Continuous review of inventory. 2.
Distribution Inventory Systems Dr. Everette S. Gardner, Jr.
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Inventory Control – IV Multiperiod Probabilistic Demand:
Chapter 17 Inventory Control.
Inventory Control IME 451, Lecture 3.
Types of Inventory Transit stock or pipeline inventory Cycle stock
Operations Management
Chapter 11, Part A Inventory Models: Deterministic Demand
Supply Chain Management (SCM) Inventory management
ISEN 315 Spring 2011 Dr. Gary Gaukler. Demand Uncertainty How do we come up with our random variable of demand? Recall naïve method:
LESSON 22: MATERIAL REQUIREMENTS PLANNING: LOT SIZING
Lecture 5 Project Management Chapter 17.
1 Chapter 10- Order Quantities IM417 Manufacturing Resources Analysis Southeast Missouri State University Compiled by Bart Weihl Spring 2001.
Dynamic lot sizing and tool management in automated manufacturing systems M. Selim Aktürk, Siraceddin Önen presented by Zümbül Bulut.
Material Requirements Planning (MRP)
Chapter 5 Inventory Control Subject to Uncertain Demand
Push Vs. Pull Part Two – Focus on MRP IE 3265 POM R. R. Lindeke, Ph. D.
21–1. 21–2 Chapter Twenty-One Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
14 – Advanced MRP Topics Dr. Ron Tibben-Lembke pp. 478-
A Simple Inventory System
Production and Service Systems Operations
Chapter 12 – Independent Demand Inventory Management
Material Requirements Planning Dr. Everette S. Gardner, Jr.
MNG221- Management Science –
Maysoon Isleem.  As a policy, the inventory level is reviewed periodically and new items are ordered from a supplier, if necessary.  ** When items are.
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
Operations Management
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Aggregate Production Planning (APP) Slide Set #8.
BA 301 Operations Management Spring 2003 Inventory Management Chapter 12 Continued.
Production and Service Systems Operations
Slides 2 Inventory Management
Material Requirements Planning (MRP)
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Material Requirements Planning (MRP) Slide Set #10.
Operations Management
Independent Demand Inventory Planning CHAPTER FOURTEEN McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Advanced Concepts in Material Requirements Planning Chapter 11.
Hierarchy of Production Decisions
1 1 Slide © 2011 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole.
CHAPTER 5 Inventory Control Subject to Uncertain Demand McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
1 The Base Stock Model. 2 Assumptions  Demand occurs continuously over time  Times between consecutive orders are stochastic but independent and identically.
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Inventory Control – I Deterministic Demand: EOQ Model.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
MBA 8452 Systems and Operations Management
35E00100 Service Operations and Strategy #6 Fall 2015
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
1 Inventory Control with Time-Varying Demand. 2  Week 1Introduction to Production Planning and Inventory Control  Week 2Inventory Control – Deterministic.
ALTERNATIVES LOT-SIZING SCHEMES
Chapter 17 Inventory Control
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 13 Aggregate Planning.
Chapter 13 Aggregate Planning.
Dr. S. S. Bhakar Director, PIMG. ‘‘ I often feel like the director of a cemetery. I have a lot of people under me. But nobody listens! ’’ - General John.
1 By: Prof. Y. Peter Chiu MRP & JIT ~ HOMEWORK SOLUTION ~
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Master Production Scheduling (MPS) Slide Set #9.
14-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter: 15 Inventory management(MSC 301)
Dynamic Lot Size Models
Chapter 14 Aggregate Planning.
Operations Management
Basic Strategies Level capacity strategy: Chase demand strategy:
Introduction to Materials Management
13 Aggregate Planning.
Dr Sh Salleh bin Sh Ahmad
Managing Economies of Scale in a Supply Chain Cycle Inventory
Dr. Arslan Ornek MATHEMATICAL MODELS
Presentation transcript:

Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Lot Sizing Slide Set #11

Murat Kaya, Sabancı Üniversitesi 2 Lot Sizing (VBWJ Chapter 14) Issue: “How to group time-phased requirements data into a schedule of replenishment orders that minimize the combined costs of placing orders and holding inventory” Lot sizing techniques –Lot-for-lot (L4L) –Economic Order Quantity (EOQ) –Periodic Order Quantity –Part-Period Balancing (PPB) –Wagner-Whitin Algorithm (finds the optimal schedule) No backordering allowed Holding cost might be based on either –average inv. level = (beginning inv. + ending inv.) / 2 –or, to the ending inventory level only

Murat Kaya, Sabancı Üniversitesi 3 Lot-for-Lot (LFL, L4L) In each period, order that period’s requirements Example: Fixed ordering cost: 54 Holding cost/unit/week: 0.4, charged to avg. inventory level

Murat Kaya, Sabancı Üniversitesi 4 EOQ Using the EOQ rule to find the order quantity (because of its simplicity) –not optimal in this case (demand is not stationary, and other reasons…) Calculate the “average net requirement” to use in the EOQ formula –100/week in this example, resulting in EOQ=164 Ignores the changes in demand (NR) by using a fixed order quantity –may result in high inventory costs

Murat Kaya, Sabancı Üniversitesi 5 Period Order Quantity (POQ) Use the EOQ formula to compute In our example, 164/100= 2 (by rounding) –order exactly the requirements for a two-week interval POQ method improves the inventory cost performance by allowing the lot sizes to vary –this time, however, the order interval is fixed

Murat Kaya, Sabancı Üniversitesi 6 Part Period Balancing (PPB) This method tries to equate the fixed ordering cost with the inventory holding cost Procedure for period 1: Choose the alternative below in which the inventory holding cost is the closest to the fixed ordering cost (54 in our example) –order to cover the requirements of period 1 –order to cover the requirements of period 1 and 2 –order to cover the requirements of period 1, 2 and 3 –…. Remember: Inventory holding cost is charged to the average inventory level in a period –average inv = (beginning inv. + ending inv.) / 2

Murat Kaya, Sabancı Üniversitesi 7 Part Period Balancing (PPB) This table illustrates the holding costs for different order scenarios

Murat Kaya, Sabancı Üniversitesi 8 Part Period Balancing (PPB) PPB permits both the lot size and the time between orders to vary –when requirements are low, the size of the orders will be low and the orders will be infrequent (periods 1-3, for example) However, PPB will not always yield the minimum cost ordering plan because it does not evaluate all possible alternatives

Murat Kaya, Sabancı Üniversitesi 9 To find the optimal lot sizes (when planning horizon is finite) How many feasible policies are there? –too many… we cannot search all of them to find the optimal one WW algorithm is based on the following observation –An optimal policy has the property that in each period, the production quantity is either “0”, or it is exactly the sum of some future requirements. That is, y 1 =r 1, or y 1 =r 1 +r 2, or ….. or y 1 =r 1 + r 2 + r 3 …r n y 2 =0, or y 2 =r 2, or y 2 =r 2 +r 3, or …. or y 2 =r 2 + r 3 + …+ r n y n =0, or y n =r n Hence, the number of policies to consider to find the optimal policy is not as large as the number of all feasible policies Wagner-Whitin (WW) Algorithm

Murat Kaya, Sabancı Üniversitesi 10 Wagner-Whitin Example 4 period problem. Requirements: (52, 87, 23, 56) h=$1, Setup cost=$75 –for simplicity, assume that the holding cost is only applied to ending inventory in this example Define c tv = setup and holding cost of producing in period t, to meet the requirements in periods t to v. We calculate the c tv values as follows: t \ v

Murat Kaya, Sabancı Üniversitesi 11 Wagner-Whitin Example Define F(t) = The total cost of the best replenishment strategy that satisfies the requirements in periods (1, 2, …,t) F(1)=75, simply the setup cost… F(2)= That is, we choose between two options: –option 1: Produce in period 1 to satisfy the requirements of periods 1 and 2. The cost will be c 12 –option 2: Produce in period 2 (cost: c 22 ). Assume that an optimal replenishment policy was chosen to take care of period 1 (costs F(1)). Hence, the total cost of this option is (F(1)+c 22 ). We have F(2)=min{c 12, F(1)+c 22 }=min{162, 75+75}=150. Hence, the optimal replenishment policy to meet the requirements in periods 1 and 2 is to produce in periods 1 and 2. Policy cost=150

Murat Kaya, Sabancı Üniversitesi 12 Wagner-Whitin Example F(3)=min{c 13, F(1)+c 23, F(2)+c 33 }. We choose between three options: –option 1: Produce in period 1 to satisfy the requirements of periods 1, 2 and 3. The cost will be c 13 –option 2: Produce in period 2 to meet the requirements of periods 2 and 3 (cost: c 23 ). Using the optimal replenishment policy for period 1 (cost F(1)), the total cost of this option is (F(1)+c 23 ). –option 3: Produce in period 3 to meet the requirement of period 3 (cost: c 33 ). Using the optimal replenishment policy for periods 1 and 2 (cost F(2)), the total cost of this option is (F(2)+c 33 ). F(3)=min{c 13, F(1)+c 23, F(2)+c 33 }= min{208, 75+98, }=173 Hence, the optimal replenishment policy to meet the requirements in periods 1 to 3 is to produce in periods 1 (for period 1) and period 2 (for periods 2 and 3). The cost of the policy is 173.

Murat Kaya, Sabancı Üniversitesi 13 Wagner-Whitin Example F(4) = min{c 14, F(1)+c 24, F(2)+c 34, F(3)+c 44 } = min{376, , , }=248 Hence, the optimal replenishment policy to meet the requirements in periods 1 to 4 is to produce in period 1 (for period 1), in period 2 (for periods 2 and 3), and in period 4 (for period 4). The cost of the policy is 248.

Murat Kaya, Sabancı Üniversitesi 14 The Table to Summarize the Solution c 11 c 12 c 13 c 14 2 F(1)+c 22 F(1)+c 23 F(1)+c 24 3 F(2)+c 33 F(2)+c 34 4 F(3)+c 44 This table summarizes the solution algorithm we discussed Column “t” shows the total cost of production alternatives for periods 1 to “t” The chosen alternatives for each “t” are shown in bold red –these are the F(t) values

Murat Kaya, Sabancı Üniversitesi 15 The Table to Summarize the Solution This table summarizes the solution algorithm we discussed Column “t” shows the total cost of production alternatives for periods 1 to “t” The chosen alternatives for each “t” are shown in bold red –these are the F(t) values

Murat Kaya, Sabancı Üniversitesi 16 Wagner-Whitin for the 12-period Example This is the example we used for the other methods Setup cost: $54, Holding cost: $0.4 charged to average inventory

Murat Kaya, Sabancı Üniversitesi 17 We calculated that the optimal decision for the requirement at period 4 was producing it at week 4 rather than carrying it from earlier periods Given this information, do you think it is possible to produce the requirement for period 5 at periods 1, 2 or 3? No… The only options are meeting period-5 requirement by production in period 4 or in period 5. This observation further reduces the computational requirements of the problem –see the simplified table in the following slide Wagner-Whitin for the 12-period Example

Murat Kaya, Sabancı Üniversitesi 18 Wagner-Whitin (WW) Algorithm

Murat Kaya, Sabancı Üniversitesi 19 Comparison of Methods (for the 12-Period Example)