UM FERI laboratorij za energetiko jože voršič črpalne hidroelektrarne.

Slides:



Advertisements
Similar presentations
“Power Factor” In Transmission System
Advertisements

Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
Study Committee Representatives Annual Report December, 2012
Modeling of Reconnection of Decentralized Power Energy Sources Using EMTP ATP Ing. Dušan MEDVEĎ, PhD. Železná Ruda-Špičák, 25. May 2010 TECHNICAL UNIVERSITY.
Sistan & Balouchestan Electric Power Distribution Company
Power Quality during the late 90’s  PQ was dominated by Fluke and LEM  Power Utilities has just started talking about standards to be followed  National.
NETWORK ANALYSIS IN GIS ENVIRONMENT Uday Deshmukh North Delhi Power Limited.
EMC in Electrical Power Systems Frithiof Jensen Power System Engineer November 12, 2013.
Frankfurt (Germany), 6-9 June 2011 Coordination between TSOs and DSOs – a necessity for system planning and operation Dr. Ralph Pfeiffer Amprion GmbH 1.
Disconnect Switches There are many purposes for disconnect switches in substations and power lines. They are used to isolate or deenergize equipment for.
Economic Impact of Poor Power Quality on Industry Nepal Adopted from The Internet for Educational Purpose Sudaryatno Sudirham October 2003.
Chapter 27 Lecture 12: Circuits.
Terry Chandler Power Quality Inc, USA Power Quality Thailand LTD Sept /6/20091www.powerquality.org all rights reserve.
1 Introduction to Power Systems Expensive! Influential!Intrusive! Source: Riadh W. Y. Habash, Electromagnetic Fields and Radiation, Marcel Dekker, New.
1 Georgian National Energy And Water Supply Regulation Comission Power Losses Nugzar Beridze June 27-July 3, 2008.
F. Ferrandis_SP_ALPHA 2_BLOCK 2_Paper 35_Presentation Barcelona May POWER FACTOR CORRECTION WITHIN INDUSTRIAL SITES EXPERIENCES REGARDING.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 13 Energy Efficiency Module 13: SUPPLY-SIDE MANAGEMENT.
Frankfurt (Germany), 6-9 June 2011 Economic assessment of PQ solutions Helge SELJESETH – Norway – RT 2b – Economic assessment of PQ solutions.
Economy and calculations If 4 million households are provided with smart power cells, the total price of generators, all equipment and software will be.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
1 Power Quality Mary Santori, P.E. Senior Engineer September 12, 2013.
Section 3 TRANSMISSION & DISTRIBUTION US Bulk Power Transmission System Transmission & Distribution (T&D) Components New T& D Technologies This product.
2. Terms and definitions1 # Terms and Definitions # Voltage Sags and Interruptions.
Microgeneration and new end-use technologies in ADDRESS, INCA and SEESGEN-ICT Jussi Ikäheimo (VTT) (& Regine Belhomme, Giovanni Valtorta) IEA DSM 17 workshop.
Electrical Distribution Training
Lecture 1 – Power Quality INTRODUCTION TO POWER QUALITY Power Quality phenomenon-Terms and definitions-Various Power events in power quality - causes for.
POWER QUALITY.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
Medium Voltage products Energy reliability & revenue improvement Speaker: Jean-Yves Pocthier - Schneider Electric France Technical solution for improvement.
Tutorial: Mechanic - electrician Topic: Basics of electrical engineering the 2nd. year Three-phase current, electrification system Prepared by: Škarka.
The strategy for improved electricity distribution maintenance 9 June 2008.
Flow Margin Assumptions for NTS Planning and Development Transmission Planning Code Workshop 3 5 th June 2008.
Presentation Identifier (Title or Location), Month 00, 2008 Cost and Benefit Analysis Framework: Update EPRI Smart Grid Advisory Meeting October 14, 2009.
SINTEF Energy Research 1 Fault statistics in distribution network Regulation of quality of supply Gerd Kjølle, Norway, RT3.
Daudi Mushamalirwa Luanda June, 2014 Technical issues of the stability of small size electric systems composed of wind generators and conventional generating.
Incorporating Quality of Service into Incentive-based Regulation Juan Rivier Florence School of Regulation Workshop Improving.
1 An Overview of Power Quality Problems In Transportation and Isolated Power Systems Paulo F. Ribeiro Calvin College / BWX Technologies, Inc Grand Rapids,
A common 400 Hz AC Power Supply Distribution System for CMS FEE. Authors C. Rivetta– Fermilab. F. Arteche, F. Szoncso, - CERN.
Submitted to: Submitted by:
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
Distribution Systems-General
Dated: 17 February 2016 Instructor :Kashif Mehmood.
M. R. Gouvea BR Session 1 – Block 1 – Transformers – Paper #36 Barcelona May RISK CRITERIA TO APPLY AND MANAGE DISTRIBUTION TRANSFORMERS M.
Craig T. Riesen Energy Workshop II 1 Electricity & Generation Basics of Electricity and Electrical Transmission Transmission Generation electrons.
Energy is one of the most important files being dealt with in Jordan that are dealt with at the present time, for the big burden it puts on the national.
ARM and GPS Based Transformer monitoring system with area Identification Student Name USN NO Guide Name H.O.D Name Name Of The College & Dept.
SARDAR VALLABHBHAI PATEL INSTITUTE OF TECHNOLOGY PREPARED BY: 1)BALDIWALA ALIABBAS ( ) 2)PARTH GUPTA ( ) 3)ANIL KHATIK ( )
State Regulation in the Natural Monopoly Sphere Agency of the Republic of Kazakhstan on Regulation of Natural Monopolies ALMATY – 2006.
J.PRAKASH.  The term power quality means different things to different people.  Power quality is the interaction of electronic equipment within the.
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
Prepared By: Theo Laughner, PE
Sub Station.
IG BASED WINDFARMS USING STATCOM
Ensuring Security of Supply in Estonian Transmission Grid
Economic Operation of Power Systems
STATE ENERGY AND WATER REGULATORY COMMISSION
Combined operation of different power plants PREPARED BY : Priyanka Grover Btech (EE) SBSSTC,FZR.
the CERN Electrical network protection system
An-Najah National University
ABB SACE Maintenance Preventive Maintenance Program
Project WECC-0100 Update Load Modeling Task Force
Electricity Distribution Network Design Training & Courses
POWER SYSTEM ANALYSIS INTRODUCTION.
EU-IPA12/CS02 Development of the Renewable Energy Sector
Transmission Planning in a Modern Market Environment
Long-term Capacity Market
Ilkka Jokinen Taavi Heikkinen
Project WECC-0100 Update Load Modeling Task Force
Slovenian EMF Legislation
Presentation transcript:

UM FERI laboratorij za energetiko jože voršič črpalne hidroelektrarne

INVESTICIJE DISKONTNA STOPNJA Zaupanje odjemalca (DSM) Deregulacija EES 25%8 % Pay-back gap UM FERI laboratorij za energetiko jože voršič črpalne hidroelektrarne

GG EDINI KUPEC UVOZ IZVOZ DIS G LLLLL SO Model edinega kupca

Anglija in Wales nova organizacijska struktura National GRID Nuclear Electric National Power PowerGen Škotska Francija 12 Regionalnih distribucij Neodvisni generatorji Odjemalci Neodvisni generatorji UM FERI laboratorij za energetiko jože voršič črpalne hidroelektrarne

GGG ponudbe PX- BORZA SO - obratovalno načrtovanje - sistemske storitve - dostop na omrežje - energetske izravnave -poravnave in obračuni Distrib. Bilateralne pogodbe GGGGGG G G Struktura trga

elektrarnaprenosno podjetje distribucijsko podjetje denarlastništvoenergija storitev produkt odjemalec Vele- prodaja Finančni trg izvajalec energetski h storitev združenje ur ni trg prodaja Upravljanje dostopa na omrežje meritve sistemski operater Organizator trga Kompleksnost trga električne energije UM FERI laboratorij za energetiko jože voršič črpalne hidroelektrarne

Ključno vprašanje deregulacije V ČIGAVIH ROKAH JE SKRB ZA RAZVOJ ENERGETSKEGA SISTEMA ? UM FERI laboratorij za energetiko jože voršič črpalne hidroelektrarne

POWER QUALITY -- THE ADDED VALUE The problem of Power Quality (PQ) cost in industrial customers is particularly important at present in the new scenery of competitive electricity markets. In fact, it represent the added value that the electric suppliers can provide to the users for improving their productivity and the reliability of their industrial process. The industry must compare the cost of the PQ services provided by the utilities with the cost derived from damages to the production output and/or to the plants. While this later is easy to define because is related to the physical replacement of some equipment, the cost of production losses is not simple to monetize. Regina Lamedica UM FERI laboratorij za energetiko jože voršič črpalne hidroelektrarne

Contents and reflections on power quality and energy market Power quality responsibility Economic regulation of network charge Quality parameters Measurements in the past Measurements nowadays Research Model of Slovenian power system UM FERI laboratorij za energetiko jože voršič črpalne hidroelektrarne

Electricity supply has nowadays become a part of every day life and is a service expected by electricity consumers. Their expectations rely on the availability of electricity whenever needed and on a safe and satisfactory operation of all connected electrical devices. In order to carry out economic regulation of network charge, the Energy Agency of the Republic of Slovenia (Slovenian regulator) monitors quality electricity supply, which is divided into: reliability (continuity) of supply, voltage quality and commercial quality. The Agency monitors the parameters of quality electricity supply with the intention of permanently increasing and maintaining its level, respectively. UM FERI laboratorij za energetiko jože voršič črpalne hidroelektrarne

The Council of European Energy Regulators (CEER) has divided quality of electricity supply to: commercial quality, dealing with service between the supplier or system operator and the consumer, continuity (reliability) of supply, dealing with the number and duration of interruptions spotted with consumers, quality of voltage which contains the technical characteristics of voltage measured in the receiving- transmitting point of the consumer. UM FERI laboratorij za energetiko jože voršič črpalne hidroelektrarne

Agency’s main task is to prepare and issue the methodology for the calculation of network charge and methodology for setting out the criteria for defining eligible costs while taking into consideration the mechanisms of promotion, manifested in the field of investment, ascertaining technical losses of the system and maintenance. Together with these mechanisms which monitor cost efficiency of system operators, quality of electricity supply in case of consumers also needs to be monitored. A decrease of costs in a company can be most easily reached by means of decreasing costs in the field of maintenance and investment, which can also lead to a lower quality level. UM FERI laboratorij za energetiko jože voršič črpalne hidroelektrarne

Legal bases for quality of electricity supply The Energy Act (Official Gazette of the Republic of Slovenia No.: 26/05; EZ-UPB1) The Decree on the method for implementing public service obligation relating to the activity of distribution system operator The Decree on the method for implementing public service obligation relating to the activity of transmission system operator UM FERI laboratorij za energetiko jože voršič črpalne hidroelektrarne

Quality parameters and methodology of network charge setting Price cap – the highest determined price of goods or service which encompasses the general price growth and the anticipated growth in efficiency of the undertaking UM FERI laboratorij za energetiko jože voršič črpalne hidroelektrarne

Reliability (continuity) SAIFI (System Average Interruption Frequency Index) This index is designed to give information about the average frequency of sustained interruptions per costumer over a predefined area. Ni- Number of interrupting customers served for each interruption event during reporting, NT - Total number of customers served for the area being indexed. UM FERI laboratorij za energetiko jože voršič črpalne hidroelektrarne

SAIDI (System Average Interruption Duration Index This index is commonly to as customer minutes of interruption or customer hours, and is designed to provide information about the average time the customer are interrupted. ri- Restoration time for each interruption event, Ni- Number of interrupting customers served for each interruption event during reporting, NT - Total number of customers served for the area being indexed. UM FERI laboratorij za energetiko jože voršič črpalne hidroelektrarne

Voltage characteristics of electricity Power frequency Magnitude of the supply voltage Supply voltage variations Rapid voltage changes Supply voltage dips Short interruptions of the supply voltage Long interruptions of the supply voltage Temporary power frequency overvoltage between live conductors and earth Supply voltage unbalance Harmonic voltage Interharmonic voltage Mains signalling voltage on the supply voltage UM FERI laboratorij za energetiko jože voršič črpalne hidroelektrarne

The highest quality demands are set on the voltage level of the consumers. The rule of parallel connection of consumers to the same voltage applies when connecting consumers. Many consumers are very sensitive to oscillation or deviation of voltage, which logically calls for the strictest rules in this area. Therefore, the SIST EN standard has been applied, which determines what characteristics of low supply voltage need to be observed. When electricity supply is reliable enough, we need to ensure to the consumers power quality also in those parameters which are seemingly invisible. By that we mean especially voltage form (voltage dips, rapid changes and harmonics). Such disturbance can appear on the voltage level of consumers or it can be a consequence of lightning or switching surges on higher voltage levels. Disturbance transiting among voltage levels equals disturbance crossing a transformer. With the remuneration of quality supply manager it is essential to pinpoint the place of disturbance. UM FERI laboratorij za energetiko jože voršič črpalne hidroelektrarne

Rules for recording power quality Recording rules establish an obligation for all (or at least all the major) companies to register continuity data. Secondly, they indicate which data are required for a correct identification of an incident. Usually these include the time interval of the supply interruption, its cause, the network device where it originated, the affected installations and the number of consumers involved. UM FERI laboratorij za energetiko jože voršič črpalne hidroelektrarne

In the past we had only one utility and it was responsible to the government for the quality of electricity supply. Frequency at the moment of connection of Yugoslav power system to UCPTE (16. September 1974) UM FERI laboratorij za energetiko jože voršič črpalne hidroelektrarne

Measurements in the past Project quality of electrical energy (June 1972) (Honneywell’s 10 channels loop oscilograph – mirror galvanometer) UM FERI laboratorij za energetiko jože voršič črpalne hidroelektrarne

Measurements in the past Harmonics and influence of power system growing THD = 3,464 elektroliza A prof. Pehani meritev z resonančnim V-metrom THD = 1,889 elektrolizi A in B meritev s HP elektrolizi A in B meritev s HP UM FERI laboratorij za energetiko jože voršič črpalne hidroelektrarne

Measurements in the past Harmonics and influence of power system growing elektrolizi B in ½ C meritev s Tectro THD = 0,70THD = 0,842 elektrolize A, B in ½ C meritev s Tectro UM FERI laboratorij za energetiko jože voršič črpalne hidroelektrarne

Measurements in the past Flicker Place Pst,95Pst,99Plt,95Plt,99 Dravograd2,953,212,572,74 Kidričevo0,370,440,310,33 Pekre0,620,800,590,66 Hudo0,470,580,410,43 Kleče0,590,710,510,58 Okroglo1,221,701,001,04 Selce0,140,190,170,22 Nova Gorica0,240,290,220,37 Ravne železarna 3,584,823,223,70 UM FERI laboratorij za energetiko jože voršič črpalne hidroelektrarne

Measurements nowadays Monitoring of all voltage characteristics at each nod connecting transmission and distribution network Monitoring recommended (by decree) at each substation and wished at each customer UM FERI laboratorij za energetiko jože voršič črpalne hidroelektrarne

The telegraph equation uuuu uuuu uuuu UM FERI laboratorij za energetiko jože voršič črpalne hidroelektrarne

Computer program To calculate transient states in individual systems and in the electricity system as a whole, software such as ATP, EMTP, PSCAD and Matlab with the Powersys module is at disposal. All mentioned software has similar characteristics since it is based on the Dommel approach and it uses similar mathematical data which then causes similar problems. Out of major software from the mentioned field the Siemens Netomac needs to be mentioned but it is not directly related to the above software. Matlab with its Powersys module has been selected as the software for modelling the electricity system of Slovenia due to its user-friendliness and possibility of fixed calculations. Since the dynamic model of the entire electricity system of Slovenia surpasses the capacities of available software and hardware, we were forced to use simplified models of individual elements. UM FERI laboratorij za energetiko jože voršič črpalne hidroelektrarne

Model evaluation The proposed simplified dynamic model of Slovene power system was confirmed in two ways. The steady state accuracy of the dynamic model was confirmed through the comparison of calculated results with those obtained by the professional program for steady state analysis and network optimization NEPLAN. The agreement of steady state voltages during normal operating conditions is very good, while the steady state voltages during the three-phase faults can differ up to 4 % in 0,4 kV network. The dynamic response of the model was partially confirmed by the comparison of calculated results with the results of field testing performed on 20 kV in the substation Rogaška Slatina. UM FERI laboratorij za energetiko jože voršič črpalne hidroelektrarne

Steady state evaluation Comparison of voltage drops calculated by NEPLAN and by dynamic model on 110, 20 and 0,4 kV busbars in substation Cerkno caused by a three-phase short circuit in the middle of 110 kV overhead line Divača – Ajdovščina. CerknoDynamic model NEPLANDifferences [%] 110 kV14,6 kV14,54 kV0,41 20 kV2,27 kV 0,0 0,4 kV57 kV55 kV3,63 UM FERI laboratorij za energetiko jože voršič črpalne hidroelektrarne

Field tests at Rogaška Slatina – dynamic evaluation Voltages and currents in L3 at 3phase short-circuit on 20 kV level in Rog. Slatina Model in meritev napetosti (L3) na 110 kV: Model in meritev toka (L3) na 110 kV: Model in meritev napetosti (L3) na 20 kV: Model in meritev toka (L3) na 20 kV: Model in meritev napetosti (L3) na 0.4 kV: Del EES Slovenije v Matlab/Simulink: 1,1 % 5 % 3 % 4,5 % 4 %

Model of Slovenian power system UM FERI laboratorij za energetiko jože voršič črpalne hidroelektrarne

Results The proposed simplified dynamic model of Slovene power system was applied to evaluate the impact of different events on power quality in 0.4 kV distribution networks. Simulations were performed for the following list of events: a three-phase short circuit on a 110 kV busbars in the substation Kleče, a switch-off of a 300 MVA power transformer in the substation Okroglo, a three-phase short circuit on a 20 kV busbar in the substation Rogaška Slatina, switch-on in a pumping regime of pump-turbine plant Kozjak and switch-on in a pumping regime of pump-turbine plant Avče. UM FERI laboratorij za energetiko jože voršič črpalne hidroelektrarne

The impact of these events on the power quality in 0.4 kV distribution networks is in this work analyzed in the following points: 0.4 kV busbars in the substation Cerkno, 0.4 kV busbars in the substation Škofja Loka, 0.4 kV busbars in the substation Šentjur and 0.4 kV busbars in the substation Rače. UM FERI laboratorij za energetiko jože voršič črpalne hidroelektrarne

Voltages on 0.4 kV busbar in substations a) Cerkno, b) Škofja Loka, c) Šentjur and d) Rače, during a three-phase short circuit on 110 kV busbar in substation Kleče. UM FERI laboratorij za energetiko jože voršič črpalne hidroelektrarne

Voltages on 0.4 kV busbar in substations a) Cerkno, b) Škofja Loka, c) Šentjur and d) Rače, during switch-off of 300 MVA power transformer (400 kV / 110 kV) in substation Okroglo. UM FERI laboratorij za energetiko jože voršič črpalne hidroelektrarne

Voltages on 0.4 kV busbar in substations a) Cerkno, b) Škofja Loka, c) Šentjur and d) Rače, for the case of a three-phase short circuit on 20 kV busbar in the substation Rogaška Slatina. UM FERI laboratorij za energetiko jože voršič črpalne hidroelektrarne

Voltages on 0.4 kV busbar in substations a) Cerkno, b) Škofja Loka, c) Šentjur and d) Rače, calculated for pumping regime switch-on of pump- turbine plant Kozjak. UM FERI laboratorij za energetiko jože voršič črpalne hidroelektrarne

Voltages on 0.4 kV busbar in substations a) Cerkno, b) Škofja Loka, c) Šentjur and d) Rače, calculated for pumping regime switch-on of pump- turbine plant Avče. UM FERI laboratorij za energetiko jože voršič črpalne hidroelektrarne