EGEE is a project funded by the European Union under contract IST-2003-508833 R-GMA status and plans Abdeslem DJAOUI / RAL GRIDPP10 meeting at CERN, 3.

Slides:



Advertisements
Similar presentations
13 September 2012 SDMX Technical Working Group1 Report of the SDMX Technical Standards Working Group SDMX Expert Group Meeting, Paris, September 2012.
Advertisements

Tom Sugden EPCC OGSA-DAI Future Directions OGSA-DAI User's Forum GridWorld 2006, Washington DC 14 September 2006.
Presented to: By: Date: Federal Aviation Administration Registry/Repository in a SOA Environment SOA Brown Bag #5 SWIM Team March 9, 2011.
An open source approach for grids Bob Jones CERN EU DataGrid Project Deputy Project Leader EU EGEE Designated Technical Director
21 Sep 2005LCG's R-GMA Applications R-GMA and LCG Steve Fisher & Antony Wilson.
IEEE NSS 2003 Performance of the Relational Grid Monitoring Architecture (R-GMA) CMS data challenges. The nature of the problem. What is GMA ? And what.
INFSO-RI Enabling Grids for E-sciencE Information and Monitoring Status and Plans GridPP18, Glasgow, Mar 2007.
INFSO-RI Enabling Grids for E-sciencE Building a robust distributed system: some lessons from R-GMA CHEP-07, Victoria,
INFSO-RI Enabling Grids for E-sciencE Information and Monitoring Status and Plans GridPP16, QMUL, 29 Jun 2006 Steve.
EGEE is a project funded by the European Union under contract IST R-GMA: Status and Plans Antony Wilson / RAL GridPP 12 - Brunel
Tony Doyle GridPP2 Proposal, BT Meeting, Imperial, 23 July 2003.
The National Grid Service Mike Mineter.
Current status of grids: the need for standards Mike Mineter TOE-NeSC, Edinburgh.
OMII-UK Steven Newhouse, Director. © 2 OMII-UK aims to provide software and support to enable a sustained future for the UK e-Science community and its.
Andrew McNab - Manchester HEP - 22 April 2002 EU DataGrid Testbed EU DataGrid Software releases Testbed 1 Job Lifecycle Authorisation at your site More.
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Torsten Antoni – LCG Operations Workshop, CERN 02-04/11/04 Global Grid User Support - GGUS -
Deployment Board Introduction David Kelsey 29 Oct 2004
EC Review – 01/03/2002 – G. Zaquine – Quality Assurance – WP12 – CS-SI – n° 1 DataGrid Quality Assurance Gabriel Zaquine Quality Engineer - WP12 – CS-SI.
EGEE is a project funded by the European Union under contract IST NA2 Dissemination John DYER Activity Leader All Activity Meeting, CERN 18.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
Page 1 MODEL TEST in the small GENERALIZE PROGRAM PROCESS allocated maintenance changes management documents initial requirement project infrastructure.
GRACE Project IST EGAAP meeting – Den Haag, 25/11/2004 Giuseppe Sisto – Telecom Italia Lab.
CMS Report – GridPP Collaboration Meeting VI Peter Hobson, Brunel University30/1/2003 CMS Status and Plans Progress towards GridPP milestones Workload.
EGEE is a project funded by the European Union under contract IST JRA1 Testing Activity: Status and Plans Leanne Guy EGEE Middleware Testing.
EGEE is a project funded by the European Union under contract IST The way ahead Alistair Mills Grid Deployment Group
DataGrid is a project funded by the European Commission under contract IST GridPP-2 Middleware 4 th -5 th Mar 2004 Information and Monitoring.
EMI INFSO-RI SA2 - Quality Assurance Alberto Aimar (CERN) SA2 Leader EMI First EC Review 22 June 2011, Brussels.
INFSO-RI Enabling Grids for E-sciencE SA1: Cookbook (DSA1.7) Ian Bird CERN 18 January 2006.
EGEE is a project funded by the European Union under contract IST Testing processes Leanne Guy Testing activity manager JRA1 All hands meeting,
Security Area in GridPP2 4 Mar 2004 Security Area in GridPP2 “Proforma-2 posts” overview Deliverables – Local Access – Local Usage.
Grid Workload Management Massimo Sgaravatto INFN Padova.
Responsibilities of ROC and CIC in EGEE infrastructure A.Kryukov, SINP MSU, CIC Manager Yu.Lazin, IHEP, ROC Manager
WP3 Information and Monitoring Steve Fisher / RAL 23/9/2003.
JRA Execution Plan 13 January JRA1 Execution Plan Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as a project funded by the European.
LCG EGEE is a project funded by the European Union under contract IST LCG PEB, 7 th June 2004 Prototype Middleware Status Update Frédéric Hemmer.
EGEE is a project funded by the European Union under contract IST R-GMA: Production Services for Information and Monitoring in the Grid John.
EGEE is a project funded by the European Union under contract IST Tools survey status, first experiences with the prototype Diana Bosio EGEE.
INFSO-RI Enabling Grids for E-sciencE Information and Monitoring Status and Plans Plzeň, 10 July 2006 Steve Fisher/RAL.
Grid Security Vulnerability Group Linda Cornwall, GDB, CERN 7 th September 2005
EGEE MiddlewareLCG Internal review18 November EGEE Middleware Activities Overview Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as.
WP3 RGMA Deployment Laurence Field / RAL Steve Fisher / RAL.
Status Organization Overview of Program of Work Education, Training It’s the People who make it happen & make it Work.
LCG workshop on Operational Issues CERN November, EGEE CIC activities (SA1) Accounting: current status
WP3 Information and Monitoring Rob Byrom / WP3
The impact of R-GMA (upon WP1 and WP4). EDG (Paris) 6 Mar James MagowanImpact of R-GMA Grid Monitoring Architecture (GMA) We use it not only for.
EGEE is a project funded by the European Union under contract IST Roles & Responsibilities Ian Bird SA1 Manager Cork Meeting, April 2004.
EGEE is a project funded by the European Union under contract IST Information and Monitoring Services within a Grid R-GMA (Relational Grid.
INFSO-RI SA2 ETICS2 first Review Valerio Venturi INFN Bruxelles, 3 April 2009 Infrastructure Support.
VOX Project Status T. Levshina. 5/7/2003LCG SEC meetings2 Goals, team and collaborators Purpose: To facilitate the remote participation of US based physicists.
WP3 EGEE Steve Fisher / RAL 14/1/2004. WP3 Steve Fisher/RAL - 14/1/2004EGEE2 Credits My slides have been stolen from many sources including: –Fabrizio.
Javier Orellana JRA4 Coordinator All-Activity Meeting CERN 14 January 2004 EGEE is proposed as a project funded by the European Union under contract IST
JRA1 Meeting – 09/02/ Software Configuration Management and Integration EGEE is proposed as a project funded by the European Union under contract.
EGEE is a project funded by the European Union under contract IST The UK Cluster Steve Fisher / RAL JRA1 meeting at Cork, 19/ April
EGEE is a project funded by the European Union under contract IST Service Activity 1 M.Cristina Vistoli ROC Coordinator All activity meeting,
EMI INFSO-RI SA2: Quality Assurance Status Report Alberto Aimar(SA2) SA2 Leader EMI First EC Review 22 June 2011, Brussels.
Grid Deployment Technical Working Groups: Middleware selection AAA,security Resource scheduling Operations User Support GDB Grid Deployment Resource planning,
JRA1 Middleware re-engineering
Bob Jones EGEE Technical Director
Grid Event Management Using R-GMA Monitoring Framework
Regional Operations Centres Core infrastructure Centres
EGEE Middleware Activities Overview
DataGrid Quality Assurance
JRA3 Introduction Åke Edlund EGEE Security Head
EO Applications Parallel Session
Ian Bird GDB Meeting CERN 9 September 2003
Documentation Guidelines
R-GMA Security Stephen Hicks UK Cluster Security
JRA1 (Middleware) Overview
Leigh Grundhoefer Indiana University
gLite The EGEE Middleware Distribution
Presentation transcript:

EGEE is a project funded by the European Union under contract IST R-GMA status and plans Abdeslem DJAOUI / RAL GRIDPP10 meeting at CERN, 3 June

GRIDPP10 Meeting at CERN, 3 June Contents Who we are Reminder of what is R-GMA What we have done so far What we plan for the first release of the EGEE middleware

GRIDPP10 Meeting at CERN, 3 June JRA1-UK in EGEE

GRIDPP10 Meeting at CERN, 3 June Role of JRA1-UK in EGEE To meet all information and monitoring needs Expect to base much of our re-engineering work on R-GMA R-GMA used in two modes: as standalone Inter-work with other information systems and displays JRA1-UK are not responsible for the contents of the (Events) schema but will coordinate as necessary

GRIDPP10 Meeting at CERN, 3 June Team Organization Mostly based in PPD at RAL Developers have mostly computer science/Maths/Physics background We have at least one weekly group meeting Using dotProject Allows individual to record their own progress Allows all members to see the big picture Collects the information for the EGEE time sheets We can be ed at: Web page at:

GRIDPP10 Meeting at CERN, 3 June People and Roles Based at RAL Robin Middleton (0.5) Cluster Manager Steve Fisher Technical Manager, Documentation and Quality Abdeslem Djaoui Architect, deputy technical manager and developer Antony Wilson Deputy technical manager and developer Linda Cornwall (0.5) Documentation and Quality Rob Byrom Developer Martin Craig Developer Steve Hicks Developer John Walk Developer A.N.Other Integrator, sysadmin and developer Based at QMUL Roney Cordenonsi Developer New (and started) Short listing

GRIDPP10 Meeting at CERN, 3 June Unified approach to information and monitoring Provides information on both: The Grid itself (resources and services) Mainly for the other middleware packages The user may query it to monitor the status of the Grid Grid applications For users Applied to both information and monitoring All tuples have time stamp Basis for other capabilities in the Grid Problem determination Resource usage Logging of information Application monitoring

GRIDPP10 Meeting at CERN, 3 June Mediator service Registry service R-GMA A Relational implementation of GMA (Grid Monitoring Architecture from GGF) Powerful data model and query language All data modelled as tables SQL can express most queries in one expression Creates impression that you have one RDBMS per VO Information Producer Information Consumer Producer service Schema service Consumer service R-GMA services

GRIDPP10 Meeting at CERN, 3 June R-GMA Relational Data Model Producers announce:SQL CREATE TABLE publish:SQL INSERT Consumers collect:SQL SELECT Some Producers (and the Registry and Schema) make use of RDBMS as appropriate – but what is central is the relational model. Some producers make use of an in-memory data structure (for performance) Not a general distributed RDBMS system, but a way to use the relational model in a distributed environment where global consistency is not important

GRIDPP10 Meeting at CERN, 3 June LCG Installation of R-GMA Initially R-GMA will be added to LCG-2 to allow job accounting and job monitoring as requested by some experiments, it will *not* be used as an information system Following successful deployment at a number of sites in the UK and elsewhere, we have produced RPMs and instructions for adding R-GMA to LCG-2 Current status in LCG-2 RPMs delivered 21 May. These include fixes requested by LCG Testing by Piera Bettini (LCG) resumes 1 June. R-GMA is expected to be approved as an LCG-2 add-on by 15 June

GRIDPP10 Meeting at CERN, 3 June JRA1: Milestones and Deliverables for the first year Month Deliverables & Milestones ItemLead Partner M03MJRA1.1Tools for middleware engineering and integration deployedCERN M03DJRA1.1(Document) Architecture and Planning (Release 1)CERN M03MJRA1.2Software cluster development and testing infrastructure availableCERN M05MJRA1.3Integration and testing infrastructure in place including test plans (Release 1) CERN M05DJRA1.2(Document) Design of grid services (Release 1)CERN M09MJRA1.4 Software for the Release Candidate 1 CERN M10MJRA1.5Integrated Release Candidate 1 enters testing and validation period (Release 1) CERN M12DJRA1.3(Software) Software and associated documentation (Release 1)CERN

GRIDPP10 Meeting at CERN, 3 June The challenge We need to re-engineer existing code, and introduce new functionality while at the same time providing continuously improved frequent releases and all without breaking backwards compatibility.

GRIDPP10 Meeting at CERN, 3 June Achievements so far New API implemented (partially) as wrapper round the old one for the EGEE MW prototype We value feedback on the new API Registry replication completed and tested on our (UK) cluster testbed The new API includes authorisation Not complete yet No implementation yet Web service prototypes written for all components Extensive UML diagrams for new design Once design agreed we will refactor code towards it Many potential simplifications have been identified Outline plan agreed for Schema replication

GRIDPP10 Meeting at CERN, 3 June Deliverables up to end of August May 31 Detailed draft specification of our software On time (John Walk) June 30 code will be moved to the new repository, suitably restructured for the new SCM and build system. July 31 Finalise Java wrapper API Complete design of new services August 31 The C,C++ and Python APIs will finalised

GRIDPP10 Meeting at CERN, 3 June Up to the end of December Sept 30 A Web services implementation release will be produced Oct 31 Multi VO support will be released Nov 30 The web services themselves will be ported to Windows We will make it very easy to build and distribute the system in source form such that it can be readily built and installed on new platforms. Replication of the schema and registry will be complete Dec 20 A complete XP port will be ready Some more improvements to the mediator and to the SQL parser

GRIDPP10 Meeting at CERN, 3 June Over the year During the year: Authorization code will be developed but it is not yet clear how much of it will be ready for RC1. We will also start to look at interfacing to displays and other information and monitoring systems by working with other clusters as appropriate understand requirements for the R-GMA role in Accounting, Job provenance and Logging & bookkeeping.

GRIDPP10 Meeting at CERN, 3 June And finally Note that after August 31st there will be no external changes to the software so we will not be under pressure to release code before it is ready (improved quality). Delivering a working system is our top priority, so we may release less improvements than planned by Dec 20th.