EU DataGrid TestBed 2 Component Review Paul Millar (University of Glasgow) (slides based on a presentation by Erwin Laure)

Slides:



Advertisements
Similar presentations
DataGRID France – 12 Feb WP 7 High-Throughput Transfers with GridFTP EU Demo : GridFTP between CERN and NIKHEF New TCP stack implementation –High-Speed.
Advertisements

Giggle: A Framework for Constructing Scalable Replica Location Services Ann Chervenak, Ewa Deelman, Ian Foster, Leanne Guy, Wolfgang Hoschekk, Adriana.
The Replica Location Service In wide area computing systems, it is often desirable to create copies (replicas) of data objects. Replication can be used.
TeraGrid Deployment Test of Grid Software JP Navarro TeraGrid Software Integration University of Chicago OGF 21 October 19, 2007.
INFSO-RI Enabling Grids for E-sciencE EGEE and gLite Slides by: Erwin Laure EGEE Deputy Middleware Manager.
30-31 Jan 2003J G Jensen, RAL/WP5 Storage Elephant Grid Access to Mass Storage.
Globus DataGrid Overview Bill Allcock, ANL GridPP Meeting 30 June 2003.
1 WP2: Data Management Paul Millar eScience All Hands Meeting September
WP2: Data Management Gavin McCance University of Glasgow November 5, 2001.
WP2: Data Management Gavin McCance University of Glasgow.
GridPP Meeting, Cambridge, 14 Feb 2002 Paul Mealor, UCL Networking Paul Mealor.
WP2 and GridPP UK Simulation W. H. Bell University of Glasgow EDG – WP2.
Andrew McNab - Manchester HEP - 22 April 2002 EU DataGrid Testbed EU DataGrid Software releases Testbed 1 Job Lifecycle Authorisation at your site More.
Data Management Expert Panel - WP2. WP2 Overview.
Data Management Expert Panel. RLS Globus-EDG Replica Location Service u Joint Design in the form of the Giggle architecture u Reference Implementation.
Presenter Name Facility Name EDG Testbed Status Moving to Testbed Two.
Andrew McNab - Manchester HEP - 2 May 2002 Testbed and Authorisation EU DataGrid Testbed 1 Job Lifecycle Software releases Authorisation at your site Grid/Web.
EU 2nd Year Review – Jan – Title – n° 1 WP1 Speaker name (Speaker function and WP ) Presentation address e.g.
EGEE-II INFSO-RI Enabling Grids for E-sciencE The gLite middleware distribution OSG Consortium Meeting Seattle,
FP7-INFRA Enabling Grids for E-sciencE EGEE Induction Grid training for users, Institute of Physics Belgrade, Serbia Sep. 19, 2008.
DataGrid is a project funded by the European Commission under contract IST WP2 – R2.1 Overview of WP2 middleware as present in EDG 2.1 release.
EU 2nd Year Review – Feb – WP2/WP7 demonstration – n° 1 WP7 Report Status on Release 2.0 and plans CNRS/UREC.
Plateforme de Calcul pour les Sciences du Vivant SRB & gLite V. Breton.
Connect. Communicate. Collaborate Click to edit Master title style MODULE 1: perfSONAR TECHNICAL OVERVIEW.
Andrew McNab - EDG Access Control - 14 Jan 2003 EU DataGrid security with GSI and Globus Andrew McNab University of Manchester
E. Ronchieri – n° 1 EDG release 2 Elisabetta Ronchieri INFN CNAF - DataGrid WP1 – Workload Management System
GridPP meeting Feb 03 R. Hughes-Jones Manchester WP7 Networking Richard Hughes-Jones.
GGF Toronto Spitfire A Relational DB Service for the Grid Peter Z. Kunszt European DataGrid Data Management CERN Database Group.
Magda – Manager for grid-based data Wensheng Deng Physics Applications Software group Brookhaven National Laboratory.
LHC Experiment Dashboard Main areas covered by the Experiment Dashboard: Data processing monitoring (job monitoring) Data transfer monitoring Site/service.
QCDgrid Technology James Perry, George Beckett, Lorna Smith EPCC, The University Of Edinburgh.
GridPP9 – 5 February 2004 – Data Management DataGrid is a project funded by the European Union GridPP is funded by PPARC WP2+5: Data and Storage Management.
WP3 RGMA Deployment Laurence Field / RAL Steve Fisher / RAL.
Data Management Kelly Clynes Caitlin Minteer. Agenda Globus Toolkit Basic Data Management Systems Overview of Data Management Data Movement Grid FTP Reliable.
INFSO-RI Enabling Grids for E-sciencE gLite Data Management Services - Overview Mike Mineter National e-Science Centre, Edinburgh.
GT Components. Globus Toolkit A “toolkit” of services and packages for creating the basic grid computing infrastructure Higher level tools added to this.
1 School of Computer, National University of Defense Technology A Profile on the Grid Data Engine (GridDaEn) Xiao Nong
DataGrid is a project funded by the European Union CHEP 2003 – March 2003 – Next Generation Data Mgmt... – n° 1 James Casey CERN
QCDGrid Progress James Perry, Andrew Jackson, Stephen Booth, Lorna Smith EPCC, The University Of Edinburgh.
Partner Logo DataGRID WP4 - Fabric Management Status HEPiX 2002, Catania / IT, , Jan Iven Role and.
INFSO-RI Enabling Grids for E-sciencE Status and Plans of gLite Middleware Erwin Laure 4 th ARDA Workshop 7-8 March 2005.
CYBERINFRASTRUCTURE FOR THE GEOSCIENCES Data Replication Service Sandeep Chandra GEON Systems Group San Diego Supercomputer Center.
1 WP2: Data Management Gavin McCance RAL Middleware Workshop 24 February 2003.
Author - Title- Date - n° 1 Partner Logo EU DataGrid, Work Package 5 The Storage Element.
Author - Title- Date - n° 1 Partner Logo WP5 Summary Paris John Gordon WP5 6th March 2002.
The Replica Location Service The Globus Project™ And The DataGrid Project Copyright (c) 2002 University of Chicago and The University of Southern California.
NA-MIC National Alliance for Medical Image Computing UCSD: Engineering Core 2 Portal and Grid Infrastructure.
Replica Management Services in the European DataGrid Project Work Package 2 European DataGrid.
CLRC and the European DataGrid Middleware Information and Monitoring Services The current information service is built on the hierarchical database OpenLDAP.
Franck Bonnassieux- WP7- n° 1 WP7 Budapest Collaboration with Dante Monitoring & R-GMA GridFTP Logging Network Cost Function MapCenter & TopoGRID Future.
EGEE is a project funded by the European Union under contract IST R-GMA: Production Services for Information and Monitoring in the Grid John.
Grid User Interface for ATLAS & LHCb A more recent UK mini production used input data stored on RAL’s tape server, the requirements in JDL and the IC Resource.
Data Management GridPP and EDG Gavin McCance University of Glasgow May 9, 2002
6/23/2005 R. GARDNER OSG Baseline Services 1 OSG Baseline Services In my talk I’d like to discuss two questions:  What capabilities are we aiming for.
Jens G Jensen RAL, EDG WP5 Storage Element Overview DataGrid Project Conference Heidelberg, 26 Sep-01 Oct 2003.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE Site Architecture Resource Center Deployment Considerations MIMOS EGEE Tutorial.
10 May 2001WP6 Testbed Meeting1 WP5 - Mass Storage Management Jean-Philippe Baud PDP/IT/CERN.
Gennaro Tortone, Sergio Fantinel – Bologna, LCG-EDT Monitoring Service DataTAG WP4 Monitoring Group DataTAG WP4 meeting Bologna –
Grid Activities in CMS Asad Samar (Caltech) PPDG meeting, Argonne July 13-14, 2000.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Mario Reale – GARR NetJobs: Network Monitoring Using Grid Jobs.
Bob Jones – Project Architecture - 1 March n° 1 Project Architecture, Middleware and Delivery Schedule Bob Jones Technical Coordinator, WP12, CERN.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI Services for Distributed e-Infrastructure Access Tiziana Ferrari on behalf.
The EPIKH Project (Exchange Programme to advance e-Infrastructure Know-How) gLite Grid Introduction Salma Saber Electronic.
WP2: Data Management Gavin McCance University of Glasgow.
J Jensen / WP5 /RAL UCL 4/5 March 2004 GridPP / DataGrid wrap-up Mass Storage Management J Jensen
StoRM: a SRM solution for disk based storage systems
Sergio Fantinel, INFN LNL/PD
WP7 objectives, achievements and plans
Report on GLUE activities 5th EU-DataGRID Conference
Grid Coordination by Using the Grid Coordination Protocol
Presentation transcript:

EU DataGrid TestBed 2 Component Review Paul Millar (University of Glasgow) (slides based on a presentation by Erwin Laure)

GridPP 6 th Collaboration Meeting – Jan – n° 1 Outline Middleware developments for TB 2.0 WP1-Workload Management System WP2 & 7-Architecture, Visulisation tools, Data Management and Replica Management Components WP5-The Storage Element WP3-R-GMA WP4-LCFGng Release plan on application testbed Summary

GridPP 6 th Collaboration Meeting – Jan – n° 1 Workload Management System WMS architecture reviewed To apply the lessons learned and addressing the problems with the first release of the software e.g. delegate some functionalities to pluggable modules, etc. To make easier the interoperability with other Grid frameworks To increase the reliability of the system To support new functionalities: User APIs (including a Java GUI) Job checkpointing Job partitioning Interactive jobs Dependencies of jobs Parallel jobs WP 1

GridPP 6 th Collaboration Meeting – Jan – n° 1 Network Monitoring Architecture PCP WEBRTPL Distributed Data Collector Raw Iperf UDPmon GridFTP PingEr Measure Collect And Storage Visualization MapCenter Replica Managers & resources brokers Network Managers Forecaster Processing Archive Info Services (R-GMA) NetworkCost WP 7

GridPP 6 th Collaboration Meeting – Jan – n° 1 Network Monitoring Architecture PCP (Probe Coordination Protocol, dev. by WP7) schedules all active network measurements and avoids conflicts. Standard and ad-hoc developed tools to measure network metrics PingEr, IperfEr, UDPmon, rTPL, SNMP proxy agent … Dedicated R-GMA infrastructure stores all network metrics and GridFTP logging. Producers for main network metrics are available. R-GMA Archiver will to keep historical network metrics values. WP 7

GridPP 6 th Collaboration Meeting – Jan – n° 1 Visualization Tools MapCenter TopoGrid RTPL WP 7

GridPP 6 th Collaboration Meeting – Jan – n° 1 GetNetworkCost Suite getNetworkCost functions assist replica managers and resource brokering Based on various back-ends for flexibility: CGI,and Globus MDS back-ends in release 1 R-GMA back-end in release 2 Web Services back-end also under development Based on regular TCP throughput measurement. (release 1) Parameters to be added for enhanced precision: GridFTP logging information : the more the grid is used, the more precise are the results. historical data stored in R-GMA Archiver other network metrics (RTT, Jitter…) forecasting methods will be also tested. WP 7

GridPP 6 th Collaboration Meeting – Jan – n° 1 Data Management Moving to the Web Service paradigm: GSI-enabled Web Services Secure SOAP communication Components: Security : GSI-enabling Web Services fitting the EDG security framework RLS : Replica Location Service RMS : Replica Management Services RMC: Replica Metadata Catalogue Spitfire 2 : Customizable Grid RDBMS access WP 2

GridPP 6 th Collaboration Meeting – Jan – n° 1 Replica Management Services Optimisation Replica Metadata Client Replica Location File Transfer EDG-ReplicaManager RepMetatdataCatalogue RepOptimisationService GridFTP RepLocationService WP 2

GridPP 6 th Collaboration Meeting – Jan – n° 1 Replica Manager components ERM: EDG Replica Manager client interface and API Entry point for all clients ROS: Replication Optimization Service Replica selection based on network metrics (WP7) RLS: Replica Location Service Local Replica Catalog services LRC: Logical to Physical file mappings Replica Location Index services RLI: index on Logical names RMC: Replication Metadata Catalogue An instance of Spitfire with RDBMS backend and specialized schema WP 2

GridPP 6 th Collaboration Meeting – Jan – n° 1 Replica Selection WP7 providing the network information that serves as the basis for the replica selection Monitoring of network traffic between the 5 main TB sites Calculation of expected transfer time for files between given sites. Optimisation component of Reptor Services (WP2) Implemented as a stand alone web service Selection of best replicas based on network latencies Assist the resource broker in selecting the best CE for job scheduling based on access costs of replicas WP 2 & 7

GridPP 6 th Collaboration Meeting – Jan – n° 1 Replica Location Service RLS: A Framework for Constructing Scalable Replica Location Services Joint collaboration between WP2 and Globus LRCs Independent local state maintained in Local Replica Catalogues : LRCs RLIs Unreliable collective state maintained in Replica Location Indices : RLIs Soft state maintenance of RLI state relaxed consistency in the RLI, full state information in LRC Membership and partitioning information maintenance RLS components change over time : failure, new components added Service discovery and system policies WP 2

GridPP 6 th Collaboration Meeting – Jan – n° 1 The StorageElement TB2.0 will see the first production release of the SE control system For this first release the three interfaces to the outside world are: Data, gridftp will be used to transfer files over the WAN and the files will optionally be available to local nodes by NFS. Information, Existing MDS information providers will be extended to provide the extra information in the GLUE storage schema. Control, functions such as reservation, pinning, deletion, and transfer time estimation. The SE control interface to a generic MSS has already been tailored for CERN and RAL and tested there. Work is under way with IN2P3, WP10, and WP9 to adapt it to their MSS. WP 5

GridPP 6 th Collaboration Meeting – Jan – n° 1 R-GMA: Information & Monitoring A relational implementation of GMA Relational model is better able to describe real world systems than the hierarchical Applied to both information and monitoring Creates impression that you have one RDBMS per VO Not a general distributed RDBMS system, but a way to use the relational model in a distributed environment where global consistency is not important. Supports streaming Producer Consumer Registry Store location Lookup location Execute or stream Producers Announce:SQL "CREATE" Producers Publish:SQL "INSERT" Consumers Collect:SQL "SELECT" WP 3

GridPP 6 th Collaboration Meeting – Jan – n° 1 Installation & Configuration LCFGng tailored to EDG (EDG LCFGng): Component guidelines for EDG middleware developers Produced new system management and Grid middleware components Ported new client configuration access library to LCFGng Non-intrusive version of the package installation subsystem (updaterpms) Central Config DB XMLHLDL Pan compiler Client node cache Access API admins Applications Configuration Architecture WP 4

GridPP 6 th Collaboration Meeting – Jan – n° 1 User VOMSserviceauthzmap pre-proc authzLCASLCMAPS pre-proc LCAS Coarse-grained e.g. Spitfire service dn dn + attrs Fine-grained e.g. RepMeC Coarse-grained e.g. Gatekeeper Fine-grained e.g. SE Java C authenticate acl Authorisation via VOMS SCG

GridPP 6 th Collaboration Meeting – Jan – n° 1 Release Plan on Application Testbed Port to RH 7.3 & LCFGngFebruary Upgrade to Globus end of February R-GMA RLS Storage Element NetworkCost Suite ERM March & April New Resource Broker + GLUE schema GridFTP access to CASTOR VOMS Testbed 2.0: May 2003

GridPP 6 th Collaboration Meeting – Jan – n° 1 Summary Major new developments in all middleware areas Addressing the key shortcomings identified: WMS stability and scalability Replica catalogue stability and scalability Data management usability Information system stability and scalability Unified access to MSS Providing new functionality Upgrade underlying software