DØ Radmon status 26/08/99 Sijbrand de Jong/Bram Wijngaarden/Silke Duensing Contents:  What is to be monitored and what actions to take ?  Historical.

Slides:



Advertisements
Similar presentations
H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
Advertisements

Silicon Preshower for the CMS: BARC Participation
March, 11, 2006 LCWS06, Bangalore, India Very Forward Calorimeters readout and machine interface Wojciech Wierba Institute of Nuclear Physics Polish Academy.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
D. Peterson, “Status of the Cornell/Purdue Program” TPC R&D Mini Workshop, Orsay 12-January Status of the Cornell/Purdue Program: first events with.
CDF Silicon Workshop th May 2006 New BLM & BLM electronics Jose E. Garcia, Jennifer Gimmell, Ulrich Husemann.
Diamonds in CDF Peter Dong, UCLA Ricardo Eusebi, FNAL Anna Sfyrla, Geneva Rick Tesarek, FNAL Rainer Wallny, UCLA With much help from Jonathan Lewis (FNAL)
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
Gif++ CR tracker setup G. Aielli for the RPC collaboration.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
— Test board for CBM01B2 baby detectors — Anton Lymanets & Johann Heuser CBM collaboration meeting GSI, 27 February 2008 Microstrip detector testing at.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
Montpellier, November 12, 2003Vaclav Vrba, Institute of Physics, AS CR 1 Vaclav Vrba Institute of Physics, AS CR, Prague CALICE ECal Status Report.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
1 ATF2 Q BPM electronics Specification (Y. Honda, ) Design System –Hardware layout –Software –Calibration Testing Production schedule ATF2 electronics.
8 July 1999A. Peisert, N. Zamiatin1 Silicon Detectors Status Anna Peisert, Cern Nikolai Zamiatin, JINR Plan Design R&D results Specifications Status of.
NUMI Off Axis NUMI Off Axis Workshop Workshop Argonne Meeting Electronics for RPCs Gary Drake, Charlie Nelson Apr. 25, 2003 p. 1.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
R. Lipton Shifters Training 2/14/2003 D0SMT Radiation Monitoring Contents: Radiation effects in silicon and impact on RunIIb Dosimetry techniques The BLM.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
D. Still-FNAL/Tevatron HALO '03 Tevatron Collider II Halo Removal System Dean Still Fermilab Tevatron Department 5/21/2003 Motives for the Collider Run.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
LHC Beam Loss Monitors, B.Dehning 1/15 LHC Beam loss Monitors Loss monitor specifications Radiation tolerant Electronics Ionisation chamber development.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
S1: Radmon Sensor (F-disk x12; H-disk x12) ~100 mW/module C1: Hirose connector F1: Flex cable Through CF cylinder L1: Round cable Special 2-3m L2: Round.
A New Inner-Layer Silicon Micro- Strip Detector for D0 Alice Bean for the D0 Collaboration University of Kansas CIPANP Puerto Rico.
1 Single event upset test of the voltage limiter for the ATLAS Semiconductor tracker TSL Experiment Number: F151 distance between power supplies and modules.
05/12/2014 Gerrit Jan Focker, BE/BI/PM 1 PSB-Injection H - and H 0 Dump detectors and Stripping Foil current measurement.
CDMS II Shielding To Installation To Construction From Design.
November, 7, 2006 ECFA06, Valencia, Spain LumiCal & BeamCal readout and DAQ for the Very Forward Region Wojciech Wierba Institute of Nuclear Physics Polish.
1 FANGS for BEAST J. Dingfelder, A. Eyring, Laura Mari, C. Marinas, D. Pohl University of Bonn
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
Hybrid CMOS strip detectors J. Dopke for the ATLAS strip CMOS group UK community meeting on CMOS sensors for particle tracking , Cosenors House,
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
10/3/2003Andreas Jansson - Tevatron IPM review1 Tevatron IPM Proposed design.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
Beam abort in KEKB and Background measurement by SVD 8 Feb T. Tsuboyama (KEK)
Front End. Charge pre-amp and detector Voltage regulator. TOP side. Detector linear voltage regulator BOTTOM side. Charge pre-amp.
SVD FADC SVD-PXD Göttingen, 25 September 2012
Markus Friedl (HEPHY Vienna)
Calorimeter Mu2e Development electronics Front-end Review
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
BCTW calibration status and future
Design and fabrication of Endcap prototype sensors (petalet)
Front-end electronic system for large area photomultipliers readout
BESIII EMC electronics
Status of muon monitor R&D and construction
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Presentation transcript:

DØ Radmon status 26/08/99 Sijbrand de Jong/Bram Wijngaarden/Silke Duensing Contents:  What is to be monitored and what actions to take ?  Historical setting: CDF and OPAL  The solutions chosen  Status of preparation  Time table  Summary and Outlook

What is to be monitored:  Instantaneous radiation levels:   at millisecond time scales   at seconds time scale   at minutes time scale   at days/months/years time scale  Sensitivity:   rad/hour (long term)   rad/second (short term/bursts)

Action: Beam abort  High Instantaneous radiation levels:   at millisecond-seconds time scales   rad/second levels Integrate the radiation with a running few seconds integration time and fast rise time (allow abort as fast as in 1 millisecond if the times get rough) Absolute reliability: implement in hardware and failsafe, also reliable monitoring (to test reliability and to justify a posteriori)

History part I: CDF CDF already has a monitor and beam abort system:  Beam Loss Monitors (BLMs):   1 Atm. Ar filled glass/Al tubes Current  Radiation / low sensitivity   TLDs infrequent access at long intervals Used to gauge the BLMs a posteriori Will use same system in RUN II, but at larger z distance (and the distance was already large…)

History part I: CDF  DØ BLM proven to be reliable, Beams division trusts them … use them also for DØ Bulky: use at large z distance, 4 on each side of DØ I.P.

Drawbacks:   At large distance from point of interest (SMD)   Limited sensitivity: no low dose / long term integral But:   Can use for beam abort (only low sensitivity needed, trusted by beams division)  :  Gauge with a second sensitive system near SMD :

Status BLMs available/delivered from Beams division The mounting of the tubes in principle decided (the drawing has to be cleaned up, then production can start) HV and signal cables per (long) coax cables (5 cables per side: 1 HV (4 tubes daisy-chained) and 4 signal cables)

History part II: OPAL All 4 LEP experiments have good radiation monitoring and beam abort systems, the OPAL system is used as inspiration for DØ. Principle: ~1 cm 2 Si diode current  radiation Two gain ranges (a la OPAL) to accommodate high sensitivity fast measurement and lower sensitivity long term integral measurement Maintain fast signals to the external electronics

Location of the sensors in DØ: F-disk H-disk

The sensor modules

Sensor module description I Wedge-shaped modules of flex print laminated onto thin Beryllium support/cooling plates Mount on F- & H-disk support rings between wedges Flex print ends in flex cable that feeds through the CF support tube (F-disk) and connects to traditional cable bundle using a small PCB with an Hirose connector The unshielded cable part is to be kept as short as possible Be plates keep Si diodes significantly colder than the strip detectors

Sensor module description II Pre-amp electronics with two gains to be transmitted to the outside world Rad hard electronics Low power dissipation Fast signal, allowing to capture single beam crossings if desired (this is not really foreseen in the standard mode of operation, but can be quite useful to calibrate the system using single MIPs)

Choice of dynamic range The design allows to change the dynamic range, within reasonable limits, by changing one or two discrete (smd) components Current choice: Low gain 3 V  400 Rad/second High gain 3 V  225 Rad/hour (These are sustained voltages-rates) The rise- and shaping-time are fixed. The shaping-time is a few hundred ns, the rise- time much faster

More design choices A leakage current compensation can be set externally (remotely) The circuit is tested to 400 V bias voltage and is protected against a short over the Si diode(s)

Status Sensor module prototyped and final circuit decided Be plates dimensions fixed and ordered F-disk H-disk width at top 0.866”/22mm 0.866”/22mm width at bottom 0.394”/10mm 0.472”/12mm total length 4.082”/103.68mm 4.496”/114.2mm top part length 1.535”/39mm 1.535”/39mm Flex circuit order pending understanding of the length of the flex cable part (distance of connector from the circuit)

Si diodes sensor module prototype Correct dimensions for F-disk 2 layouts tested (one better than other: choice made) Design allows to cover with EM shielding foil

Si diodes Test structure from H-disk wafers 48 diodes with and 48 diodes without guard ring in hand setting up I-V, C-V (depletion voltage) and leakage current tests at University of Nijmegen  select the best for mounting on modules

Cabling  BLMs: coax cables all the way to receiver electronics. Need a break at the end of the muon shield.  Diodes: short flex cable, then “round” cable to patch panel between barrel and end cap CAL, then more robust round cables to receiver electronics. Signal as fine group shielded twisted pair and power cables bundled together with common electrical and mechanical shield.

Cabling: open questions  Lengths of flex cable ?  Length of conventional cable parts ?  Types of conventional cables that may be used (safety/”standard cable”/…) ?  Patch panels: available size/… ?  Location of receiver electronics ?

Readout  VME based (single crate system) using analog receiver, integrator boards, one or more ADC modules and a VME CPU/host  Use Beam division/CDF logarithmic receiver/amplifier for BLMs, use also their scheme to derive beam abort signal  Use linear differential receivers a la OPAL for Si diodes, use parallel streams with different integration time

Readout (continued)  Use cyclic buffer for fast readout (0.1-1ms) and read out on demand (beam abort/warning level/test/…)  Send integrated rates (Rad/sec or Rad/hour) with averages over several seconds-minute to display in control room, store these values once per minute in data base Keep this one VME crate on uninterruptable power or connect to Tevatron power Make sure this crates functions independently from DØ readout/slow controls and monitoring

Readout: open questions  ”Standard” DØ VME ADC module ?  ”Standard” DØ VME CPU module ?  ”Standard” DØ online data base ?  Connection to DØ slow control and monitoring system ?  Presentation in DØ control room ?  Interface to Tevatron (beam abort/monitoring info) ?

Tevatron startup At Tevatron startup (without DØ) provide fully functional system  Test the system  Feed-back information to Tevatron The Si diode sensor modules will be in addition to those installed on the SMD (made as normal PCB) Temporary mounting/support system for BLMs and Si diode sensor modules still to be designed

Schedule ( ) Mid-Sept: Final layout of Si diode sensor modules Final design of BLM support system End-Sept: Final design of temporary support End-Oct: Final design of receiver module electronics Order VME crate, ADC and CPU modules Final and temporary BLM support finished End-Nov: Si diode sensor modules finished (2 sets) End-Dec: Receiver electronics finished (+VME ADC/CPU) End-Jan: Fully functional system around beam line Si diode sensors ready for mounting on F- and H-disk support rings

Summary Two complementary radiation monitoring systems BLMs in hand, mounting design ~completed, manufacturing no problem (at Univ. of Nijmegen) Design of Si front end done and prototyped Design of readout electronics ongoing for both systems (but no particular difficulties foreseen) Work needed on: cabling, interface to DØ and Tevatron Separate system foreseen at Tevatron set-up