Javier A. Sevilla Interface & Configuration FAC Review October 12, 2006 1 Interface and Configuration Management Outline.

Slides:



Advertisements
Similar presentations
National Incident Management System (NIMS)
Advertisements

A SharePoint site is a Web site that provides a central storage and collaboration space for documents, information, and ideas. A SharePoint site is a tool.
SUBMITTALS PROCESSING Fall 2008 ARCH 330
1.040/1.401 Project Management Spring 2007 Lecture 7 Dr. SangHyun Lee Department of Civil and Environmental Engineering Massachusetts Institute.
CALIFORNIA DEPARTMENT OF EDUCATION Tom Torlakson, State Superintendent of Public Instruction Ramiro Nava and Stacy Savoca Federal Program Monitoring Office.
David Saenz FAC CF April 20, 06 Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities D. Saenz.
Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
Javier A. Sevilla Interface & Configuration FAC Review April 16, Interface and Configuration Management Outline CF.
Michael Scharfenstein FAC June 17, ES&H Status of Construction and Technical System Installations Michael Scharfenstein.
David Saenz Facility Advisory October 30, 2007 CONVENTIONAL FACILITES MANAGEMENT.
Jess Albino CF Breakout April 16, CONVENTIONAL FACILITIES Project Team CF Changes Electrical Engineer - done Mechanical.
Richard M. Boyce FAC April 16, LCLS Installation & Planning Integration process – IMT 2007 Installation Planning BTH.
Javier A. Sevilla MMF FAC Review October 27, Magnetic Measuring Facility (MMF) Outline Summary of Facility Requirements.
Michael Scharfenstein FAC October LCLS Environment, Safety & Health Michael Scharfenstein ES&H Coordinator.
Mark Reichanadter LCLS FAC April 20-21, 2006 Meeting of the LCLS Facilities Advisory Committee LCLS Project Management M.
Jess Albino FAC CF April 16, 2007 Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities Jess.
PRDs, ESDs, ICDs Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Undulator.
1 Jess Albino 1 Conventional Facilities Status FAC Review – Breakout Session CONVENTIONAL FACILITIES STATUS Jess Albino – Associate.
Jess Albino Facility Advisory October 29, 2007 FACILITY ADVISORY COMMITTEE PLENARY CONVENTIONAL FACILITIES UPDATE October.
David Saenz CF Oct 30, CF MEP Commissioning.
M. Reichanadter LCLS Project June 2008 FAC Meeting Report to the LCLS Facilities Advisory Committee Project Management.
Richard M. Boyce FAC October 29-31, Installation Planning Integration process – IMT update Installation Planning &
Jess Albino Facility Advisory October 30, 2007 FACILITY ADVISORY COMMITTEE BREAKOUT SESSION 5 TURNER CONTRACT OVERVIEW.
Michael Scharfenstein FAC April 7, 2005 LCLS ES&H Process and Documentation.
Jo Beth Folger FAC - CF Breakout – Sector April 8, Sector 20 Project Overview Sector 20 Site Plan Description Schedule.
Mike Scharfenstein FAC Review - November 11, 2008 SLAC National Accelerator Laboratory 1 Environment Safety & Health Status.
Michael Scharfenstein FAC April 16, 2007 LCLS CONSTRUCTION SAFETY Michael Scharfenstein.
Mike Scharfenstein CF Breakout - 12 November 2008 SLAC National Accelerator Laboratory 1 ES&H Status of Construction and Technical.
Jose Chan FAC Review- LTU-DUMP Installation Status & 11/11/08 1 LTU-Dump Installation Status & Schedule.
Javier A. Sevilla April 5, Magnetic Measuring Facility (MMF) Outline Organizational Chart Facility Design Criteria,
David McGiven FAC: Construction Management Procurement October 2006 Facility Advisory Committee (FAC) Construction Management.
M. Scharfenstein - ES&H Coordinator 8 June 2009
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
Construction Administration & Project Acceptance Welcome Scott Kirchner, Altus Architectural Studio Jon Hilton, Farris Engineering Jason Studt, JE Dunn.
TRACKING DSA PCO SUBMITTALS IN EXPEDITION by Wendy Kaszycki, PE Project Controls Director March 2, 2006.
 Importance of Material Coordinators  Spec Requirement  CMM Requirement  General Description of Training  Materials Coordinator Learning Objectives.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 Lori Plummer 1 LCLS Office Space FAC Review – Breakout Session CONVENTIONAL FACILITIES LCLS Office Space Lori Plummer, PMP,
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
DSA 101 July 2010 Plan Approval Process for the Career Technical Education Facilities Program (CTE)
ITPD PRODUCTION SUPPORT PROCESS OCTOBER 8, /23/2015 Guiding Principles 1.Resolve production issues in a timely and effective manner 2.Manage.
Contractor / Engineer Conference 2010 Dispute Resolution Process Dispute Resolution Process.
M. Reichanadter LCLS Project November 2008 FAC Meeting Slac National Accelerator Laboratory Report to the LCLS.
Mark Reichanadter LCLS FAC October 12-13, 2006 Report to the LCLS Facilities Advisory Committee LCLS Project Management.
David Saenz Readiness for Oct 12, 2006 # Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities.
1 Monitoring/Evaluation Program Overview December 3, 2008 Title III Director’s Meeting.
Office of State Fire Marshal Oregon State Police Creating Opportunities For Improvement In Preparedness And Response Community Capability Assessment.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
David Saenz EIR Review Oct 9-11, Conventional Facilities (CF) WBS 1.9 ETC and Methodology David Saenz CF Systems Manager.
1 David Schultz 1 SLAC Self-Assessment Programs meeting ASO Requirements David Schultz LCLS Program Division Director SLAC National.
September 10, FY 2003 Plans Bob Simmons. September 10, Introduction Overview of Project and Engineering Plans Project Plans Engineering Plans.
R. I. T Multidisciplinary Senior Design #1 rule of classroom science: Don’t eat the experiment!
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
MASON ITSM, WHERE ARE WE NOW?. GEORGE MASON UNIVERSITY AGENDA Background – 2013/2014 Organizational Changes ITSM Tool Process Mapping Tool ITIL Framework.
Responsibilities & Tasks Week 2
LUSI Coordination with LCLS
Team member1 Team member2 Team member3 Team member4 November 2018
Meeting of the LCLS Facilities Advisory Committee
LINAC OPS Budget Review
CONVENTIONAL FACILITIES STATUS
M. Scharfenstein - ES&H Coordinator 14 May 2009
DOE Review of the LCLS Project
Integrated Safety and Environmental Management
CONVENTIONAL FACILITIES
Installation Status & Operational Readiness Process
DOE Review of the LCLS Project October 2006
Department Of Energy Review Linac Coherent Light Source Project
AE Title III Status Introduction
CF Scope, Management & Organization
DOE Status Meeting of the LCLS Project
Presentation transcript:

Javier A. Sevilla Interface & Configuration FAC Review October 12, Interface and Configuration Management Outline Configuration Management Organization Engineering Group Engineering Group Roles and Responsibilities Member Integration Management Team (IMT) RFI’s and Submittals Process Path Forward Summary

Javier A. Sevilla Interface & Configuration FAC Review October 12, CF Configuration Management Interface Control Documents (ICD’s) Release of drawings and specifications (IFC, IFB, etc) Response to RFI’s Submittals and shop drawings review Integration Management Team (IMT) Process

Javier A. Sevilla Interface & Configuration FAC Review October 12, CF Configuration Management Documentation is available to ALL LCLS Collaborators Drawings and Specs in PDF

Javier A. Sevilla Interface & Configuration FAC Review October 12, Organization Engineering Group Engineer-TBD We also provide UTR support to Construction Group D. Saenz-CF System Manager D. McDonald-Deputy See J. Albino presentation for complete Chart J. Cranston M. Swiderski J. Albino-Associate Director Civil Construction A.Comelo J. Tubbs Project Engineer UTR Electrical Lori Shewchuk Structural Ken Yang Group Leader Javier A. Sevilla

Interface & Configuration FAC Review October 12, Roles and Responsibilities CF LCLS Engineering Group Coordination of design with A/E firms (JE, MTH,etc) Primary interface with Physics requirements for CF Interface with Jacobs Title III Support Interface with Turner Co. for RFI’s, Submittals, etc. Design of small engineering projects for Tech. Systems Coordination with Integration Management Team (IMT) members Interface and coordination of Engineering issues with SLAC Departments (Fire Marshal, CEF, ES&H, etc)

Javier A. Sevilla Interface & Configuration FAC Review October 12, Integration Management Team (IMT) PMD D.Saenz J.Turner H.Tompkins J.Sevilla R.M Boyce D.Marsh IMT is in place and working! R.Pope R. Fuller

Javier A. Sevilla Interface & Configuration FAC Review October 12, CF Integration Manager Responsibilities Primary contact Interface between technical systems and CF group Review of Design Change Request (changes, modifications, etc) from technical systems Weekly meetings to discuss new issues Expedite the identification and resolution of integration issues Coordination with area (Linac, Undulator and Photon) integration managers on resolving pending issues, changes, etc.

Javier A. Sevilla Interface & Configuration FAC Review October 12, SAMPLE

Javier A. Sevilla Interface & Configuration FAC Review October 12, SAMPLE

Javier A. Sevilla Interface & Configuration FAC Review October 12, RFI Process in Place

Javier A. Sevilla Interface & Configuration FAC Review October 12, RFI’s Process All documentation via Turner Talk (access CF LCLS, JE and Subcontractors) Daily Coordination with JE Title III on-site liaison and Project Engineers from Turner Weekly meetings (Turner, JE and LCLS) to review and set priorities on RFI’s Internal Coordination with CF LCLS and other SLAC Department to respond to RFI’s

Javier A. Sevilla Interface & Configuration FAC Review October 12, Weekly meeting to review status and priorities

Javier A. Sevilla Interface & Configuration FAC Review October 12, Submittal Process Submittal register prepared by TCCo (+ 900 items) and reviewed by CF LCLS and JE Electronic and hard copy format-see flow chart All documentation via Submittal log maintained by CF LCLS Daily Coordination with JE Title III on-site liaison and Project Engineers from Turner Weekly meetings (Turner, JE and LCLS) to review and set priorities on Submittals. Internal Coordination with CF LCLS

Javier A. Sevilla Interface & Configuration FAC Review October 12, Submittal Package

Javier A. Sevilla Interface & Configuration FAC Review October 12, Web Based Storage and Communication Tool Documentation from Turner LCLS%20Document%20Storage/01%20-%20LCLS%20Systems/ConvFac%20External/Turner/default.aspx RFI’s: B180 C 043

Javier A. Sevilla Interface & Configuration FAC Review October 12, Web Based Storage and Communication Tool Documentation from Jacobs LCLS%20Document%20Storage/01%20-%20LCLS%20Systems/ConvFac%20External/Jacobs/default.aspx

Javier A. Sevilla Interface & Configuration FAC Review October 12, Path Forward CF Team working collaboratively with LCLS, TCCO,SLAC and JE Configuration management process is in place! Very dynamic process (on-going construction) Continue interface and communication with ALL Technical Systems Continue to coordinate open issues, design changes with other LCLS systems Continue to provide engineering support to the construction activities

Javier A. Sevilla Interface & Configuration FAC Review October 12, Interface and Configuration Management SUMMARY Engineering TEAM is in place and providing support to Construction Activities Engineering Group in the primary interface between ALL technical systems, A/E consultants and construction work Working towards the SAFELY completion of the LCLS! Questions?

Javier A. Sevilla Interface & Configuration FAC Review October 12, END