Common Problems in Multi-Family Lead Assessments Multi-Family Pitfalls.

Slides:



Advertisements
Similar presentations
Lead Dust Sampling Technician June Chapter 1 Introduction.
Advertisements

Controlling Lead-Based Paint Hazards Chapter 5 Lead Abatement for Workers Course.
Toledo Collaboration for Lead Safe Housing 2014 Ohio Healthy Homes Summit Matthew Currie, Esq. Advocates for Basic Legal Equality.
Lead Dust Sampling Technician June Chapter 2 Visual Inspection.
Lead Dust Sampling Technician March Chapter 2 Visual Inspection.
January 26, 2015 CDBG Small Cities. What is Triggered under HUD Regulations? HUD Projects costing less than $25,000 When a contract specifies lead remediation.
Working with Local OHHLHC Grant Funded Agencies August 8, 2013 Barb Kimmel City of Lansing
Lead; Renovation, Repair and Painting Program: Final Rule - April 3, 2008 Lead-Based Paint Hazard Awareness Ark-Tex Council of Governments Texarkana College.
Interpretive Guidance Issues Jay Wagar Certification and Compliance Officer.
MOD VIII - REGULATORY OVERVIEW FOR WORKERS IN FEDERALLY-ASSISTED HOUSING  List the major Federal agencies responsible for regulating lead-based paint.
COURSE: JUST 3900 INTRODUCTORY STATISTICS FOR CRIMINAL JUSTICE Instructor: Dr. John J. Kerbs, Associate Professor Joint Ph.D. in Social Work and Sociology.
Case Studies Pat McGee. Why Research? ● To distinguish between rival plausible hypotheses. [Campbell 1994] ● To attack proposed scientific theories. [Popper.
Non-Experimental designs: Developmental designs & Small-N designs
Adjusting EPLC to your Project Colleen Robinson & Teresa Kinley Friday, February 6, 2009.
Risk management. Berliner Energieagentur GmbH Risks of EPC Equipment transfered into the property of building owner at the moment of installation and/or.
Critique of Research Outlines: 1. Research Problem. 2. Literature Review. 3. Theoretical Framework. 4. Variables. 5. Hypotheses. 6. Design. 7. Sample.
Best Practices for Environmental Cleaning Module 6 - Audit.
October Module 7: Recordkeeping Overview: In this section, you will learn about records required for each job. Records must be retained and made.
HUD’s Lead Safe Housing Rule (LSHR)
1 Identifying Lead-Based Paint Hazards Chapter 4 Lead Abatement for Workers Course.
ODOT Rail Division 1.Regulate all Highway/Railroad Crossings 2.What is a “Crossing Order”? 3.When is an Order required?
1 CHILDHOOD LEAD POISONING PREVENTIVE MAINTENANCE PROGRAM.
Lead Dust Sampling Technician March Chapter 1 Introduction.
1 CDBG Lead-Based Paint Requirements For Grant Administrators.
1 CDBG Lead-Based Paint Requirements For Local Officials.
Standard Error of the Mean
Codex Guidelines for the Application of HACCP
Healthy Homes Section -Interpretive Guidance- Update 2013.
Georgia Department of Community Affairs Housing R R & P Issues Lead-Based Paint & (Asbestos) Compliance Georgia Environmental Protection Division Lead-Based.
Innovative Program Design to Reach a Difficult Market PSE&G Multifamily Housing Program Innovative Program Design to Reach a Difficult Market Rachael P.
BUSINESS OPERATIONS Business Management. Today’s Objectives  Identify workplace safety & security measures.  Analyze components included in policies.
Lead Poisoning for Local Health Officers Identifying potential issues in homes you visit Tina Bernier, Environmental Coordinator Childhood Lead Poisoning.
October Module 2: Regulations U.S. Environmental Protection Agency (EPA): Established accredited training and certification programs for workers,
January 29, 2014 Community Development. Overview of the EPA Renovation, Repair and Painting Rule (RRP Rule) as it relates to the HUD Lead Safe Housing.
HUD 2530 Clearance HUD 2530 CLEARANCE Previous Participation Clearance 24 CFR CFR
ESA Program Lead and Asbestos Safety Practices Presentation to the Low Income Oversight Board February 26, 2014 San Francisco, CA.
Types of Housing. Single-Family designed to house one family. Multi-Family designed to house more than one family.
BUSINESS OPERATIONS Business Management. Today’s Objectives 1. We will identify workplace safety & security measures. 2. We will analyze components included.
Statistical Decision Theory
1 Implementing the Lead Safe Housing Rule in Department of Housing and Urban Development: Office of Public and Indian Housing, and Office of Healthy Homes.
Statistics and Data Analysis Process Section 1.3.
Lead Based Paint 101 September 2005 Liz Wilde X
LEAD Hazard Awareness Module II Protect Our Children.
MyLicense Website Access or
Statistical Decision Theory Bayes’ theorem: For discrete events For probability density functions.
Lead-Based Paint Hazard Control Madison County Community Development Alan Dunstan, Madison County Board Chairman Frank Miles, Administrator.
IX-1 MOD IX - ADDRESSING LEAD IN YOUR MAINTENANCE PROGRAM  Explain management’s role in a lead maintenance program  Outline the fundamental components.
Group Exercise: Assess the condition and criticality of the following assets Based on description of the asset, give your opinion on.
Mold Remediation & Remediation Contractors 2011 National Tribal Forum on Air Quality Institute for Tribal Environmental Professionals (ITEP) & National.
The Industry Side of Certification, Enforcement, and Clearances Monica Starks GS Group LLC dba Myleadtraining.com Green Solutions Environmental Services.
BUSINESS OPERATIONS Business Management. Today’s Objectives  Identify workplace safety & security measures.  Analyze components included in policies.
Copyright © 2007 Pearson Education Canada 9-1 Chapter 9: Internal Controls and Control Risk.
Construction Planning and Estimating Construction Technology I Module 2 part 2.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
South Central Economic Development District. Community Development Block Grants For Housing Housing grants support rehabilitation of owner- and renter-occupied.
LIHTC Pitfalls and Solutions Presenter: Harold R. Berk, Esquire
General Operations Limitation on Use of Funds Termination of Assistance Other Program Requirements.
Failure Modes and Effects Analysis (FMEA)
Introduction to New Product Development (Documentation)
Unit 4: Assessments The most difficult thing in life is to know yourself.—Thales.
1888PressRelease - Affordable Lead Based Paint Inspection Payment Plan for Detroit Rental Registration. PCI Environmental is here to help
HOME Underwriting and Subsidy Layering Training
Lead Hazard Control Program Presentation 2018 Director Tania Menesse
LEAP TH GRADE.
CDC Training Workshop May 2, 2018.
Standard Operating Procedures and Termination Procedures
Group Experimental Design
What regulations apply?
Introduction You will be shown 8 scenarios involving children.
Required Practical 7: Define the term ‘Reflex Action’:
Presentation transcript:

Common Problems in Multi-Family Lead Assessments Multi-Family Pitfalls

Grouping Units & Buildings HUD’s Criteria For Combining Multiple Units and/or Buildings into a Single Population Include: Construction Date & Style Paint History “Could tenants ever paint their own units prior to 1978?” Maintenance History Ownership History

Determining Tested Units Random (Inspections & Risk Assessments): Most common method, relies solely on probability/math Targeted (Risk Assessments only): Requires reliable data on every unit for 7 selection criteria Worst Case (Risk Assessments only): Requires physical access to every unit in the population Documentation of the Selection Process is Critical! (See Accompanying Charts for Examples) Having owners clean selected units before a Risk Assessment is not considered a ‘representative sample’!

Determining Hazards Dust Hazards Averaged by component per unit If one unit has a hazard they all do. Deteriorated Paint Hazards Very little interpretive guidance from HUD Presence of Lead-Based Paint is determined by percentage of the whole using HUD’s flow chart Logical to follow the same chart and percentages to determine Deteriorated Paint Hazards (i.e. >2.5%) Generally, all Common Areas should be tested, and the results of those tests stand alone. How are these hazards documented in our reports?

Clearance Testing Tested units must be randomly selected after work is complete HUD guidelines state that contractor can’t know what units will be tested Can’t simply use the same units that were tested in the Risk Assessment Must review all selected units based on the hazards described in the multi- family Risk Assessment Clearance testing relies on representative sampling for the entire property, so if one unit fails, all untested units fail with it After failed results, future clearance testing cannot use the same units HUD guidelines state that contractor can’t know what units will be tested Must use and document new random selection process If the property contains under 40 units, most cost effective method is to clear all units.