IAEA International Atomic Energy Agency ESTABLISHING THE SAFETY INFRASTRUCTURE FOR A NUCLEAR POWER PROGRAMME IAEA WORKSHOP ON LEADERSHIP AND MANAGEMENT.

Slides:



Advertisements
Similar presentations
EMS Checklist (ISO model)
Advertisements

Environmental Management System (EMS)
Richard Hibbert RSRL Quality, Assessment and Management Systems Manager Process management Requirements in IAEA Standards and Guides.
ISO 9001 : 2000.
IAEA International Atomic Energy Agency. IAEA Outline Learning objectives Introduction Functions of Regulatory Body (RB) on EPR Appraisal guidance: Part.
IAEA International Atomic Energy Agency Responsibility for Radiation Safety Day 8 – Lecture 4.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
IS Audit Function Knowledge
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.7 Commissioning Geoff Vaughan University of Central.
Regulatory Body MODIFIED Day 8 – Lecture 3.
1 Regulatory Challenges During and Following a Major Safety or Security Event Muhammad Iqbal Pakistan Nuclear Regulatory Authority Presentation at General.
Protection Against Occupational Exposure
Ship Recycling Facility Management System IMO Guideline A.962
Postgraduate Educational Course in radiation protection and the Safety of Radiation sources PGEC Part IV The International System of Radiation Protection.
Occupational Health and Safety
IAEA International Atomic Energy Agency Overview of legal framework Regional Workshop - School for Drafting Regulations 3-14 November 2014 Abdelmadjid.
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
IAEA International Atomic Energy Agency ESTABLISHING THE SAFETY INFRASTRUCTURE FOR A NUCLEAR POWER PROGRAMME IAEA WORKSHOP ON LEADERSHIP AND MANAGEMENT.
IAEA - Department of Nuclear Safety & Security
IAEA International Atomic Energy Agency LICENSING OF RADIOACTIVE WASTE MANAGEMENT FACILITIES Luc Baekelandt Safety of radioactive.
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
School for Drafting Regulations on Radiation Safety Vienna, November 2012 Rules and responsibilities of the regulatory body Jiří Veselý, SONS, Czech republic.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
IAEA International Atomic Energy Agency. IAEA Outline Learning objectives Introduction Authorization Inspection Enforcement 2 Basic IRRS Training - Reviewing.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Regulatory Authority.
IAEA International Atomic Energy Agency School of Drafting Regulations – November 2014 Government and Regulatory Body Functions and Responsibilities IAEA.
Staffing and training. Objectives To understand approaches to the development of strategies and policies for staffing of a Regulatory Authority including.
LEGAL and REGULATORY FRAMEWORK for NUCLEAR and RADIATION SAFETY in BULGARIA General overview Dr. M. Mateeva – Chief Inspector R. Markova-Mihaylova – Chief.
IAEA International Atomic Energy Agency International Standards, Codes and Guidance for Radiation Safety Regulatory Infrastructure IAEA Advanced Regional.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
1 The Future Role of the Food and Veterinary Office M.C. Gaynor, Director, FVO EUROPEAN COMMISSION HEALTH & CONSUMER PROTECTION DIRECTORATE-GENERAL Directorate.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
IAEA International Atomic Energy Agency. IAEA Photo: V. Friedrich Outline Learning Objectives General Safety Requirements Part 1 Other General Safety.
IAEA International Atomic Energy Agency Governmental, Legal and Regulatory Framework for Safety and Regulatory Functions William Kennedy Research Reactor.
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
IAEA - Department of Nuclear Safety & Security
International Atomic Energy Agency School for Drafting Regulations on Radiation Safety RER/9/096 Vienna, 3 May, 2010 Adriana Nicic, Regulatory Activities.
IAEA International Atomic Energy Agency ESTABLISHING THE SAFETY INFRASTRUCTURE FOR A NUCLEAR POWER PROGRAMME IAEA WORKSHOP ON LEADERSHIP AND MANAGEMENT.
RER/9/111: Establishing a Sustainable National Regulatory Infrastructure for Nuclear and Radiation Safety TCEU School of Drafting Regulations November.
Milestones for Nuclear Power Infrastructure Development Establishment of A Regulatory Framework Gustavo Caruso, Section Head, Regulatory Activities Section.
IAEA International Atomic Energy Agency Technical Meeting on Regulatory Oversight of Human and Organizational Factors Vienna, Austria | December.
IAEA International Atomic Energy Agency. IAEA Outline Learning objectives Introduction Authorization Inspection Enforcement 2 Basic IRRS Training - Reviewing.
IAEA International Atomic Energy Agency. IAEA Outline Responsibilities and functions of the regulatory body Objectives of regulatory functions Organizational.
IAEA International Atomic Energy Agency Development of the Basis Document for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
ISO 9001:2015 Subject: Quality Management System Clause 8 - Operation
(3.6) General requirements on resources for the establishment of IMS
(5.1)Development of IMS to fit the organization (step wise)
Regulatory Control Training Workshop Regulatory Cooperation Forum
GS-R-3 vs. ISO 9001:2008 Requirements - 4
Development of safety regulations and guides for nuclear power plants
Nuclear and Treaty Law Section Office of Legal Affairs
Abdulla Al Yammahi Specialist, Radiation Safety Inspection
Nuclear and Treaty Law Section Office of Legal Affairs
Training Course on Integrated Management System for Regulatory Body
Establishing the Infrastructure for Radiation Safety Preparatory Actions and Initial Regulatory Activities.
Regulatory Control Training Workshop Regulatory Cooperation Forum
Communication and Consultation with Interested Parties by the RB
Leadership and Management for Safety
Regulatory Cooperation Forum (RCF) - Plenary 2018
Regulatory Oversight of HOF in Finland
USNRC IRRS TRAINING Lecture18
Development of safety regulations and guides for nuclear power plants
Reviewing Governmental and Regulatory Responsibilities
Development of safety regulations and guides for nuclear power plants
Presentation transcript:

IAEA International Atomic Energy Agency ESTABLISHING THE SAFETY INFRASTRUCTURE FOR A NUCLEAR POWER PROGRAMME IAEA WORKSHOP ON LEADERSHIP AND MANAGEMENT SYSTEM FOR REGULATORY BODY (WS-8) CORE SET – Topic 3.2 Processes

IAEA Learning objectives The aim of this lecture is about the regulatory body’s process implementation in an integrated manner This presentation provides information to assist implementation of SSG-16 Actions 75 (2) and 79 (3) January 2014WS8 - Core Set2

IAEA Content 1. Introduction 2. Process implementation 3. Core processes of the regulatory body 4. Support processes of the regulatory body 2014Integrated Management System3

IAEA 1. Introduction Developing processes The processes of the IMS that are needed to achieve the goals, provide the means to meet all requirements and deliver the “products” of the regulatory body shall be identified, and their development shall be planned, implemented, assessed and continually improved The sequence and interactions of the processes shall be determined [From GS-R-3 |5.1, 5.2, 5.3, 5.4, 5.5; GS-G-3.1 |5.1, 5.9] 2014Integrated Management System4

IAEA 1. Introduction The need for processes The operational framework within a RB is made up of processes. Processes should be identified, their development planned, implemented, assessed and continually improved. No single ‘process catalogue’ can apply to every organisation Organizations have found beneficial to structure processes as follows : Core processes, for the actual execution of the core regulatory functions Supporting processes, to provide the infrastructure necessary for the core processes Management processes, to ensure the operation of the entire management system Processes have interfaces across the organisation: their sequence and interactions should be determined 2014Integrated Management System5

IAEA 1. Introduction No single ‘process catalogue’ can apply to every organization Processes need to be developed to conduct the key regulatory functions in a stable, systematic, and consistent manner. The management system should maintain and improve the performance of the regulatory body by means of the planning, control and supervision of its safety related activities Each RB should determine which processes are to be documented, on the basis of its requirements, and the nature of its activities and overall strategy [From GSR Part 1| Req. 19, 22] 2014Integrated Management System6

IAEA 1. Introduction The development of processes necessary for the management system needs to consider: Planning Grading of the application of management system requirements Process management and interactions between them The approach to decision making The expectations of interested parties Management of organizational change and resolution of conflicts Communication Knowledge management, Human resources Infrastructure and the working environment Control of products, Purchasing Control of records and documentation of the management system Measurement, assessment and improvement 2014Integrated Management System7

IAEA 2. Process implementation For each process, the following activities should be performed Selecting a process team: the team leader, normally the process owner, representatives from the relevant departments, and a facilitator Identifying the major inputs and outputs and the interested parties Determining the risks and hazards, together with any necessary control measures and mitigatory actions Identifying interactions with interfacing processes Establishing process measurement criteria Identifying additional expectations from the process so as to be able to control performance 2014Integrated Management System8

IAEA 2. Process implementation Developing a process description that identifies: Governing documents, definitions and key requirements, e.g., applicable regulatory, statutory, legal, safety, health, environmental, security, quality and economic requirements Key process responsibilities and descriptions of activities Supporting documentation and requirements for records How the process is or has been validated where necessary Procedures for the approval and distribution of the process documents 2014Integrated Management System9

IAEA 2. Process implementation For each process, a flow chart may be use for description purpose 2014Integrated Management System10

IAEA 2. Process implementation Processes Management For each process a designated individual is given the authority and responsibility for: developing and maintaining the necessary supporting documentation ensuring effective interaction between interfacing processes ensuring that the records required exist monitoring and reporting on the performance of the process ensuring periodic reviewing and promoting improvement in the process The process owner has the authority to assess, monitor and propose changes to the process Process ownership is not regarded as a status issue. Process owners is not selected on the basis of their position in the management structure. [From GS-R 3|5.6, 5.9, 5.10; GS-G 3.1|5.14, 5.15, 5.16] 2014Integrated Management System11

IAEA 3. Core processes of the regulatory body Drafting, adopting, reviewing and revising Regulations and Guides The RB issues regulations and guides upon which its judgments, decisions and actions are based, specifying the documentation and procedures necessary in the various steps of the bidding process, site evaluation, licensing process and inspections A general procedure includes the details of general format and style of language to be used in developing the regulations and guides The periodic review of regulations and guides is established to keep these up to date Too frequent changes need to be avoided as they can affect the stability of the regulatory system, induce detrimental effects on the industry and investors, and reduce public confidence [From SSG-16|Action 30, 31, 161, 174] 2014Integrated Management System12

IAEA 3. Core processes of the regulatory body The procedure, to be adapted to Member States’ legal systems and practices, may include the following steps Determination of the need Setting the priorities Determination of the scope of the proposed regulations Determination of the resources to be employed Collection of information Drafting of the proposed regulations Review of the proposed regulations Establishing and issuing the regulations 2014Integrated Management System13

IAEA 3. Core processes of the regulatory body Review and Assessment The RB carries out comprehensive reviews and independent verifications of reports, such as site evaluation report, safety analysis report, submitted by the operating organization in order to verify compliance with the regulatory requirements Before granting an authorization or a licence for the construction of a nuclear installation, the RB reviews, assesses and inspects inter alia: the management system of the applicant documentation relating to demonstration of compliance with requirements of the selected design organizational and financial arrangements [From SSG-16|Action 120, 164] 2014Integrated Management System14

IAEA 3. Core processes of the regulatory body Licensing The RB specifies practical arrangements including what documents are required for a licence application, as well as the depth of review for each document submitted in support of a licence application in such a way that applicants are aware of the requirements Separate hold points are specified for certain steps in design, manufacturing, construction and commissioning, for the purpose of verifying the results of work and the preparedness to proceed The involvement of the public and interested parties, including public hearings, and resolution of the issues expressed in those hearings, is part of the licensing process [From SSG-16|2.68, 2.90] 2014Integrated Management System15

IAEA 3. Core processes of the regulatory body Inspection and Enforcement Regulatory inspections should cover all areas of responsibility of the RB RB should have the authority to carry out independent inspections The manner, extent and frequency of inspections shall be in accordance with a graded approach Regulatory enforcement actions may include recorded verbal notification, written notification, and imposition of additional regulatory requirements and conditions, written warnings, penalties and, ultimately, revocation of the authorization Regulatory enforcement may also entail prosecution. [From GS-R Part 1|4.52, 4.55] 2014Integrated Management System16

IAEA 4. Support processes of the regulatory body Control of documents A document control process needs to be established to provide for their preparation, review, approval, issuing, distribution, revision and validation (where appropriate) The types of document to be controlled includes: documents that define the management system; safety requirements; work instructions; assessment reports; drawings; data files; specifications; computer codes; purchase orders and related documents; supplier documents The documentation of the IMS should accommodate the feedback of experience from implementation and from internal and external lessons learned. [From GS-G 3.1|5.24, 5.26, 5.28; GS-G 3.1|2.46, 2.52] 2014Integrated Management System17

IAEA 4. Support processes of the regulatory body Control of products For Regulatory Body activity, “product” includes items, services or deliverables such as regulatory documents, licences, inspection reports, information provided to stakeholders… Specifications and requirements for products, including any subsequent changes, shall be in accordance with established standards and shall incorporate applicable requirements Administrative controls and performance indicators should be developed for each process [From GS-R 3|5.14, 5.16 ; GS-G 3.1|5.31, 5.32] 2014Integrated Management System18

IAEA 4. Support processes of the regulatory body Control of records The RB shall make provision for establishing, maintaining and retrieving adequate records relating to the safety of facilities and activities Storage facilities for records should be maintained to prevent damage from causes such as fire, water, air, rodents, insects, earthquakes and the actions of visitors without admission rights From GS-R.1 |Req. 35; GS-G 3.1|5.40, 5.46] 2014Integrated Management System19

IAEA 4. Support processes of the regulatory body Purchasing Purchasing requirements shall be developed and specified in procurement documents Evidence that products meet these requirements shall be available to the RB before the product is used [From GS-R 3|5.24] 2014Integrated Management System20

IAEA 4. Support processes of the regulatory body Communication and consultation with interested parties The RB is responsible to: promote the establishment of appropriate means of discussion that involve professional and constructive interactions with relevant parties inform and consult interested parties and the public about the possible radiation risks associated with facilities and activities, and about the processes and its decisions make arrangements to identify lessons learned from operating experience and regulatory experience, including in other States begin establishing a suitable working relationship with the operating organization and with international organizations [ From GS-R Part 1|Req. 36, 4.66, 4.67; GS-R Part 2 - Draft (2011)| 2.36; GS-R Part 1|Req. 14, 15 ; SSG16|Action 32] 2014Integrated Management System21

IAEA 4. Support processes of the regulatory body Managing organizational change Organizational changes should be evaluated and classified according to their importance to safety and each change be justified The implementation of such changes shall be planned, controlled, communicated, monitored, tracked and recorded to ensure that safety is not compromised [From GS-R 3 |5.28, 5.29] 2014Integrated Management System22

IAEA 4. Support processes of the regulatory body Interfaces with other issues such as environment protection, emergency and security The RB and relevant parties should ensure that programmes for environmental monitoring, for emergency preparedness and response are made available All the relevant organizations should coordinate safety and security aspects from the early stages of development. There should be mechanisms to communicate to the public appropriate information regarding safety and nuclear security Where the responsibilities of the regulatory body and other organizations interact or have an interface, formal agreements should be established [From GSR Part 3 Interim | Req. 32, 43; GS-R.1 Req. 8; SSG16|Action 138; SSG16|Action 194, 195, 196; GS-G-1.1|3.36, 3.38] 2014Integrated Management System23

IAEA 4. Support processes of the regulatory body SSG-16 Action 76: The regulatory body (and the operating organization) need to develop competences in managing the growth of and change in the organization Careful consideration of the interactions between different changes The process for managing change to identify and evaluate the risks to the objectives of the organization, including safety, health, environmental, security, quality and economic risks, and ensure that there is no degradation in the safety culture of the regulatory body Careful consideration of the total workload imposed on the organization to implement the changes in parallel with continued operational activities [From GS-G 3.1|5.61, 5.62, 5.66, 5.67, 5.59] 2014Integrated Management System24

IAEA THANK YOU 2014LMSRB | Safety Culture25