Status Report University of Bristol 3 rd GridPP Collaboration Meeting 14/15 February, 2002Marc Kelly University of Bristol 1 Marc Kelly University of Bristol.

Slides:



Advertisements
Similar presentations
Andrew McNab - Manchester HEP - 15 February 2002 Testbed Release in the UK EDG Testbed 1 GridPP sources of information GridPP VO GIIS and Resource Broker.
Advertisements

UK Testbed Report GridPP 9 Steve Traylen
S.L.LloydGrid Steering Committee 8 March 2002 Slide 1 Status of GridPP Overview Financial Summary Recruitment Status EU DataGrid UK Grid Status GridPP.
GridPP Meeting, Cambridge, 14 Feb 2002 Paul Mealor, UCL Networking Paul Mealor.
Tony Doyle - University of Glasgow GridPP EDG - UK Contributions Architecture Testbed-1 Network Monitoring Certificates & Security Storage Element R-GMA.
GridPP Meeting, Cambridge, 15 Feb 2002 Paul Mealor, UCL UCL Testbed 1 status report Paul Mealor.
Andrew McNab - Manchester HEP - 10 May 2002 UK Testbed Deployment Aim of this talk is to the answer the questions: –What are other sites doing? –What are.
Tony Doyle Executive Summary, PPARC, MRC London, 15 May 2003.
B A B AR and the GRID Roger Barlow for Fergus Wilson GridPP 13 5 th July 2005, Durham.
Stephen Burke - WP8 Status - 14/2/2002 Partner Logo WP8 Status Stephen Burke, PPARC/RAL.
Andrew McNab - Manchester HEP - 17 September 2002 Putting Existing Farms on the Testbed Manchester DZero/Atlas and BaBar farms are available via the Testbed.
ATLAS/LHCb GANGA DEVELOPMENT Introduction Requirements Architecture and design Interfacing to the Grid Ganga prototyping A. Soroko (Oxford), K. Harrison.
Partner Logo UK GridPP Testbed Rollout John Gordon GridPP 3rd Collaboration Meeting Cambridge 15th February 2002.
11th December 2002Tim Adye1 BaBar UK Grid Work Tim Adye Rutherford Appleton Laboratory BaBar Collaboration Meeting SLAC 11 th December 2002.
Andrew McNab - Manchester HEP - 22 April 2002 EU DataGrid Testbed EU DataGrid Software releases Testbed 1 Job Lifecycle Authorisation at your site More.
Bob Jones – Project Architecture - 1 March n° 1 Information & Monitoring Services Antony Wilson WP3, RAL
Presenter Name Facility Name EDG Testbed Status Moving to Testbed Two.
Andrew McNab - Manchester HEP - 2 May 2002 Testbed and Authorisation EU DataGrid Testbed 1 Job Lifecycle Software releases Authorisation at your site Grid/Web.
Andrew McNab - Manchester HEP - 22 April 2002 EU DataGrid Testbed EU DataGrid Software releases Testbed 1 Job Lifecycle Authorisation at your site More.
Tier1A Status Andrew Sansum GRIDPP 8 23 September 2003.
Martin Bly RAL Tier1/A RAL Tier1/A Site Report HEPiX-HEPNT Vancouver, October 2003.
INFN - Ferrara BaBarGrid Meeting SPGrid Efforts in Italy BaBar Collaboration Meeting - SLAC December 11, 2002 Enrica Antonioli - Paolo Veronesi.
Southgrid Status Pete Gronbech: 27th June 2006 GridPP 16 QMUL.
Andrew McNab - Manchester HEP - 6 November Old version of website was maintained from Unix command line => needed (gsi)ssh access.
BaBarGrid: Some UK developments Roger Barlow Imperial College 13th September 2002.
Andrew McNab - Manchester HEP - 22 April 2002 UK Rollout and Support Plan Aim of this talk is to the answer question “As a site admin, what are the steps.
EU funding for DataGrid under contract IST is gratefully acknowledged GridPP Tier-1A Centre CCLRC provides the GRIDPP collaboration (funded.
Southgrid Status Report Pete Gronbech: February 2005 GridPP 12 - Brunel.
CMS Report – GridPP Collaboration Meeting VI Peter Hobson, Brunel University30/1/2003 CMS Status and Plans Progress towards GridPP milestones Workload.
WP3 RGMA Deployment Laurence Field / RAL Steve Fisher / RAL.
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
HEP Experiment Integration within GriPhyN/PPDG/iVDGL Rick Cavanaugh University of Florida DataTAG/WP4 Meeting 23 May, 2002.
Andrew McNab - Manchester HEP - 5 July 2001 WP6/Testbed Status Status by partner –CNRS, Czech R., INFN, NIKHEF, NorduGrid, LIP, Russia, UK Security Integration.
3 Sept 2001F HARRIS CHEP, Beijing 1 Moving the LHCb Monte Carlo production system to the GRID D.Galli,U.Marconi,V.Vagnoni INFN Bologna N Brook Bristol.
Support for system administrators Feedback from site admins after Testbed1 experience 05/03/2002 4th EDG WS Paris G. Merino, IFAE.
QCDGrid Progress James Perry, Andrew Jackson, Stephen Booth, Lorna Smith EPCC, The University Of Edinburgh.
Cosener’s House – 30 th Jan’031 LHCb Progress & Plans Nick Brook University of Bristol News & User Plans Technical Progress Review of deliverables.
Nick Brook Current status Future Collaboration Plans Future UK plans.
Grid Status - PPDG / Magda / pacman Torre Wenaus BNL U.S. ATLAS Physics and Computing Advisory Panel Review Argonne National Laboratory Oct 30, 2001.
CMS Report – GridPP Collaboration Meeting V Peter Hobson, Brunel University16/9/2002 CMS Status and Plans Progress towards GridPP milestones Workload management.
ATLAS and GridPP GridPP Collaboration Meeting, Edinburgh, 5 th November 2001 RWL Jones, Lancaster University.
Steve Traylen Particle Physics Department EDG and LCG Status 9 th December 2003
SouthGrid SouthGrid SouthGrid is a distributed Tier 2 centre, one of four setup in the UK as part of the GridPP project. SouthGrid.
05/29/2002Flavia Donno, INFN-Pisa1 Packaging and distribution issues Flavia Donno, INFN-Pisa EDG/WP8 EDT/WP4 joint meeting, 29 May 2002.
RAL Site Report John Gordon IT Department, CLRC/RAL HEPiX Meeting, JLAB, October 2000.
Southgrid Technical Meeting Pete Gronbech: 26 th August 2005 Oxford.
First attempt for validating/testing Testbed 1 Globus and middleware services WP6 Meeting, December 2001 Flavia Donno, Marco Serra for IT and WPs.
DataGRID WPMM, Geneve, 17th June 2002 Testbed Software Test Group work status for 1.2 release Andrea Formica on behalf of Test Group.
The Experiments – progress and status Roger Barlow GridPP7 Oxford 2 nd July 2003.
Dave Newbold, University of Bristol8/3/2001 UK Testbed 0 Sites Sites that have committed to TB0: RAL (R) Birmingham (Q) Bristol (Q) Edinburgh (Q) Imperial.
…building the next IT revolution From Web to Grid…
Grid User Interface for ATLAS & LHCb A more recent UK mini production used input data stored on RAL’s tape server, the requirements in JDL and the IC Resource.
Production Manager’s Report PMB Jeremy Coles 13 rd September 2004.
University of Bristol 5th GridPP Collaboration Meeting 16/17 September, 2002Owen Maroney University of Bristol 1 Testbed Site –EDG 1.2 –LCFG GridPP Replica.
Tier1A Status Andrew Sansum 30 January Overview Systems Staff Projects.
Presenter Name Facility Name UK Testbed Status and EDG Testbed Two. Steve Traylen GridPP 7, Oxford.
2-Sep-02Steve Traylen, RAL WP6 Test Bed Report1 RAL and UK WP6 Test Bed Report Steve Traylen, WP6
Andrew McNab - Manchester HEP - 17 September 2002 UK Testbed Deployment Aim of this talk is to the answer the questions: –“How much of the Testbed has.
DataTAG Work Package 4 Meeting Bologna Simone Ludwig Brunel University 23rd and 24th of May 2002.
December 26, 2015 RHIC/USATLAS Grid Computing Facility Overview Dantong Yu Brookhaven National Lab.
Andrew McNabGrid in 2002, Manchester HEP, 7 Jan 2003Slide 1 Grid Work in 2002 Andrew McNab High Energy Physics University of Manchester.
SAM Sensors & Tests Judit Novak CERN IT/GD SAM Review I. 21. May 2007, CERN.
15-Feb-02Steve Traylen, RAL WP6 Test Bed Report1 RAL/UK WP6 Test Bed Report Steve Traylen, WP6 PPGRID/RAL, UK
Grid Status - PPDG / Magda / pacman Torre Wenaus BNL DOE/NSF Review of US LHC Software and Computing Fermilab Nov 29, 2001.
Gennaro Tortone, Sergio Fantinel – Bologna, LCG-EDT Monitoring Service DataTAG WP4 Monitoring Group DataTAG WP4 meeting Bologna –
LHCb Grid MeetingLiverpool, UK GRID Activities Glenn Patrick Not particularly knowledgeable-just based on attending 3 meetings.  UK-HEP.
Andrew McNab - Globus Distribution for Testbed 1 Status of the Globus Distribution for Testbed 1 Andrew McNab, University of Manchester
GridPP2 Data Management work area J Jensen / RAL GridPP2 Data Management Work Area – Part 2 Mass storage & local storage mgmt J Jensen
II EGEE conference Den Haag November, ROC-CIC status in Italy
UK Testbed Status Testbed 0 GridPP project Experiments’ tests started
Presentation transcript:

Status Report University of Bristol 3 rd GridPP Collaboration Meeting 14/15 February, 2002Marc Kelly University of Bristol 1 Marc Kelly University of Bristol 3 rd GridPP Collaboration Meeting. Cambridge 14/15 Feb `02

Status Report University of Bristol 3 rd GridPP Collaboration Meeting 14/15 February, 2002Marc Kelly University of Bristol 2 Status ~6 Staff involved in Grid related work. 2 full time (1 PostDoc, 1 PostGrad) Several Test Machines already in use. A mix of clean installations and upgrades to existing servers. 5 new machines awaiting delivery. To be used to form a Testbed 1 development cluster.

Status Report University of Bristol 3 rd GridPP Collaboration Meeting 14/15 February, 2002Marc Kelly University of Bristol 3 Status (Part 2) Plans to move to using LCFG for future installations to avoid manual rpm installs. Will only work on fresh machines. Existing servers will still need manual installs. Several problems have been uncovered and solutions found. E.g custom rpm lists generated from official ones. Currently testing installs of CE+SE, and CE+UI on machines from these custom lists.

Status Report University of Bristol 3 rd GridPP Collaboration Meeting 14/15 February, 2002Marc Kelly University of Bristol 4 GDMP Currently involved in testing version 2.0 between Bristol and RAL. A Replica Catalogue has been made and tested. Used in GDMP testing. Ongoing…

Status Report University of Bristol 3 rd GridPP Collaboration Meeting 14/15 February, 2002Marc Kelly University of Bristol 5 Other activities Hosting the BaBarGRID top level Information Server (GIIS). BaBarGRID Monitoring system. Pulls data from MDS and displays it using perl scripts on an Apache web server. Experience in adding non standard data to the Globus MDS. E.g. BaBar Monte-Carlo status.

Status Report University of Bristol 3 rd GridPP Collaboration Meeting 14/15 February, 2002Marc Kelly University of Bristol 6 Plans Install more systems and test the latest V1.0 release of EDG software. Extend and enhance monitoring software being used on BaBarGRID. Integrate grid tools into existing CMS/LHCb/BaBar production farms.

Status Report University of Bristol 3 rd GridPP Collaboration Meeting 14/15 February, 2002Marc Kelly University of Bristol 7

Status Report University of Bristol 3 rd GridPP Collaboration Meeting 14/15 February, 2002Marc Kelly University of Bristol 8