SITES SOFTWARE APPLICATION SEMINAR __________________________ SITES 2005.1.4 INTEGRATED DEVELOPMENT ENVIRONMENT for WATER RESOURCE SITE ANALYSIS 5 Point.

Slides:



Advertisements
Similar presentations
Hydrology Rainfall Analysis (1)
Advertisements

Hydrology Rainfall - Runoff Modeling (I)
Hyetograph Models Professor Ke-Sheng Cheng
Unit Hydrographs Ch-7 (Streamflow Estimation)
Generating Flow Frequencies – Updating NOAA Atlas Precipitation Frequency for California by: John High, Hydrologist Sacramento District Sacramento District.
Using HEC-1 for Subdivision Runoff Detention Pond Design Stacie Kato April 26, 2004.
Reading: Applied Hydrology Sections 14-5, 14-6
CHARACTERISTICS OF RUNOFF
Alberta Rainfall-Runoff Analysis September, 2002.
Unit Hydrograph The Unit Hydrograph Unit Hydrograph Derivation
Forest Hydrology: Lect. 18
Hyetographs & Hydrographs
Agricultural Pond Private Engineering Resources & Costs Agricultural Water Resource Development Workshops Presented by: Cavanaugh & Associates P.A. 530.
Reading: Applied Hydrology Sec 14.1 – 14.4
Upper Brushy Creek Flood Study – Flood mapping and management Rainfall depths were derived using USGS SIR , Atlas of Depth Duration Frequency.
Start Audio Lecture! FOR462: Watershed Science & Management 1 Streamflow Analysis Module 8.7.
Synthetic Unit Hydrographs
WinTR-20 Project Formulation Hydrology Computer Program
CE 3372 – Lecture 10. Outline  Hydrology Review  Rational Method  Regression Equations  Hydrographs.
Hydrologic Design and Design Storms
Hydrology & Water Resources Engineering
Estimating Qmax Using the Rational Method
History and Evolution of the PMP/PMF
WinTR-20 Project Formulation Hydrology Computer Program Basic Input and Output Presented by: WinTR-20 Development Team.
WinTR-20 Project Formulation Hydrology Computer Program Basic Input and Output Presented by: WinTR-20 Development Team.
RAINFALL AND RUNOFF IN RELATION TO EROSION Introduction Rainfall & runoff relationships relevant for design of: terraces water harvesting interception.
El Vado Dam Hydrologic Evaluation Joseph Wright, P.E. Bureau of Reclamation Technical Services Center Flood Hydrology and Meteorology Group.
TR-55 Urban Hydrology for Small Watersheds
WinTR-20 SensitivityMarch WinTR-20 Sensitivity to Input Parameters.
Precipitation Types Important for Real Time Input and Forecasting
__________________________ SITES INTEGRATED DEVELOPMENT ENVIRONMENT for WATER RESOURCE SITE ANALYSIS COMPLEX WATERSHEDS SITES IN SERIES.
Higher Geography Hydrosphere
Otter Creek Watershed Meeting January 19, 2008 Mike Dreischmeier Agricultural Engineer Natural Resources Conservation Service.
Finding the S vs. Q relationship By: Cody Hudson.
WinTR-20 PS, SD, FB HydrographsJune WinTR-20 Principal Spillway, Stability Design, and Freeboard Hydrographs Presented by: WinTR-20 Development Team.
1 VIRGINIAWORKSHOP Feb. 28 – Mar. 3, 2006 INTRODUCTION to SITES for WATER RESOURCE SITE ANALYSIS.
WinTR-20 SensitivityFebruary WinTR-20 Sensitivity to Input Parameters.
Engineering Hydrology Discussion Ch. #6 Hydrographs
Martin Rule Curve Study Ashley McVicar, APC Maurice James, Water Resources Consulting LLC.
CE 3354 Engineering Hydrology
Basic Hydrology: Rainfall-Runoff – I
SITES SOFTWARE APPLICATION SEMINAR INTRODUCTION to SITES __________________________ SITES 2005 INTEGRATED DEVELOPMENT ENVIRONMENT for WATER RESOURCE SITE.
Some issues in flood hydrology in the climate context
1 TR-55 Urban Hydrology for Small Watersheds. 2 Simplified methods for estimating runoff and peak discharge for small urban/urbanizing watersheds Ch 1.
USDA – Natural Resources Conservation Service An Equal Opportunity Provider and Employer USDA - NRCS Implementation of NOAA Atlas 14 Annette Humpal, P.E.
Rainfall-Runoff modeling Forecasting and predictingForecasting and predicting –Flood peaks –Runoff volumes Due to Large rain and snowmelt events ***especially.
HYDROGRAPH is a graph showing the rate of flow (discharge) versus time past a specific point in a river, or other channel or conduit carrying flow. It.
-1 DR. S & S. S GHANDHY GOVT. ENGINEERING COLLEGE, SURAT. SUB : HYDROLOGY & WATER RESOURCES ENGINEERING ( ) TOPIC : HYETOGRAPH & HYDROGRAPH ANALYSIS.
Glenn E. Moglen Department of Civil & Environmental Engineering Virginia Tech Introduction to NRCS/SCS Methods (continued) CEE 5734 – Urban Hydrology and.
Hydrology & Water Resources Engineering ( )
Sanitary Engineering Lecture 4
UNIT – III FLOODS Types of floods Following are the various types of floods: 1.Probable Maximum Flood (PMF):This is the flood resulting from the most sever.
HYDROLOGY Lecture 10 Unit Hydrograph
Rainfall-Runoff modeling
Routing surface runoff to a basin outlet
Liberty Lake Watershed Analysis
Hydrologic Analysis (Bedient chapter 2)
TR-55 Urban Hydrology for Small Watersheds
Design Rainfall Distributions Based on NRCC Data
Basic Hydrology: Rainfall-runoff based methods – II
المنحنى الزمني للتدفق في المجاري الطبيعية Stream Flow Hydrograph
Highway Drainage: Determining Flow Rates
Brian McInerney Hydrologist National Weather Service
Hyetographs & Hydrographs
Floods and Flood Routing
Preciptation.
WRE-1 BY MOHD ABDUL AQUIL CIVIL ENGINEERING.
Preciptation.
Preciptation.
WinTR-20 Project Formulation Hydrology Using WinTR-20 for Small Watersheds What is Small ?? Some individuals are using WinTR-20 for subdivision planning.
Presentation transcript:

SITES SOFTWARE APPLICATION SEMINAR __________________________ SITES INTEGRATED DEVELOPMENT ENVIRONMENT for WATER RESOURCE SITE ANALYSIS 5 Point Distribution

TRAINING OBJECTIVES Know how distribute a 24 hr. PMP rainfall. Given 6hr. PMP – 29.7” 12hr. PMP – 35.5” 24hr. PMP – 39.8”

History Over 50 years of experience with small NRCS dams indicated that the routed top of dam, or height of dam, has provided a design with satisfactory performance. Most of these routings have been done with a 6 hour design storm. Records of NRCS dams with auxiliary spillway (AS) damage indicate that much of this damage is caused by long duration storms with very large volumes of runoff (sometimes spread over days). For auxiliary spillway design a longer duration storm and a different distribution for checking spillway integrity needs to be considered.

Concern Concern has been and still is that setting the top of dam based on a 24 hour PMP storm will significantly increase the height of the dam when compared to the 6 hour PMP storm. This assumes that the 24 hour PMP storm contains a critically nested 6 hour PMP storm.

Distribution Storms have been nested such that the design storm produced a maximum theoretical peak discharge for watersheds regardless of the time of concentration. This distribution delivers the maximum amount of runoff to the site in the shortest period of time thereby giving the highest possible top of dam elevation. This type of maximized PMP storm distribution for durations of 6 to 72 hours will cause the top of dam to be higher with each increase in storm duration. This is because the 6-hour PMP storm (both magnitude and distribution) is included in the longer duration storm. Runoff volume arriving at the site before this intense 6-hour storm will occupy flood storage, thus raising the starting water level.

Distribution - Goal To provide a large volume of runoff, which will cause a long duration of flow through the AS and not raise the top of dam. A distribution based on 6 hour increments with no durations less than 6 hours that are nested, for a 24 hour storm results in 5 points were tested. The HMRs recommend putting the most intense 6-hour period near the center of the storm and alternatively placing the next most intense 6-hour period before or after the most intense period. In this way a “maximized” or conservative storm is developed. The least intense 6-hour periods are placed at the beginning and end of the storm. The 5 point storm distribution was based on an ordering of the 6-hour periods where rainfall would be considered at a uniform rate within each 6-hour period will still provide a large volume of runoff, which will cause a long duration of flow through the AS.

TEST To test different storm distributions on actual dam sites (representing the United States with most of the sites East of the 105 th meridian) a data set for 105 dams was developed. We ran 5 different distributions through the sites program and compared the Hp (flow depth in the spillway) to the Hp for the current 6-hour storm. Each distribution was site specific based on the rainfall obtained at each location.

Distribution A critically stacked distribution is developed using PMP data for a 6, 12, and 24 PMP storms. The 6 hour PMP is applied uniformly in the second increment of the stacked distribution. Each of the remaining incremental rainfalls are applied uniformly in adjoining 6 hour increments.

How to distribute a 24hr PMP storm We will assume that the 24 hr storm will be distributed in 4 6hr blocks. The 6, 12, and 18 hr PMP rainfall will be included in the 24 hr PMP. The 6 hr PMP will be contained in the 24 hr storm and distributed in the second 6 hr block.

This is a table from the new Chapter 21 showing how to distribute the 24 hour storm for a 5 point.

Example How distribute a 24 hr. PMP rainfall. Given 6hr. PMP – 29.7” 12hr. PMP – 35.5” 24hr. PMP – 39.8”

Example 6 to 12 hrs hr. PMP – 29.7” = 5.8” 12 to 18 hrs ” 39.8” -35.5” = 4.3” 4.3”/2 = 2.15” 0 to 6 hrs ” 18 to 24 hrs ”

How to distribute a 24hr PMP storm 1 st ” 2 nd ” 3 rd ” 4 th ” Make this into a unit mass curve.

How to distribute a 24hr PMP storm 2.15”/39.8” = ”/39.8” = ”/39.8” = ”/39.8” = 0.054

How to distribute a 24hr PMP storm Time Rainfall

QUESTIONS- ??????

The End