David Britton, 18/2/04 Imperial, College GridPP1 Status David Britton, 18/2/2004 Imperial College
David Britton, 18/2/04 Imperial, College Project Overview
David Britton, 18/2/04 Imperial, College Missed Targets LCG have now re-numbered this and it is due 31-Mar-04
David Britton, 18/2/04 Imperial, College Changes to ProjectMap
David Britton, 18/2/04 Imperial, College Risk Register
David Britton, 18/2/04 Imperial, College Achievements - LCG
David Britton, 18/2/04 Imperial, College Achievements - EDG All EDG deliverables submitted.
David Britton, 18/2/04 Imperial, College Achievements - Applications
David Britton, 18/2/04 Imperial, College Achievements - LHCb
David Britton, 18/2/04 Imperial, College Achievements - Infrastructure
David Britton, 18/2/04 Imperial, College InfrastructureInteroperabilityDissemination
David Britton, 18/2/04 Imperial, College
David Britton, 18/2/04 Imperial, College Resources
David Britton, 18/2/04 Imperial, College Summary 76% of the 190 GridPP1 tasks have been successfully completed. 2 tasks are overdue. The LCG-2 release is imminent and will be used in the next DCs. The EDG project is currently undergoing a final review. The applications are making good progress on many fronts. The UK Grid infrastructure is being developed.