Bernd Heits AQ-Workshop Bucharest, 01.-02. July 2008 Planning of ambient air quality measurements General rules The guideline is an application aid to.

Slides:



Advertisements
Similar presentations
Technical skills and competences
Advertisements

Site Characterization Instructional Goal: Upon completion of this topic the participant will better understand the need to identify and evaluate various.
Directive 2008/50/EC of 21 May 2008 on ambient air quality and cleaner air for Europe These slides do not provide a complete description of the requirements.
Defensible IEPs Douglas County School District 1 Module V: Documentation and Timelines.
Internal Audit Documentation and Working Papers
Field experiment on the effects of a nearby asphalt road on temperature measurement Mariko Kumamoto 1, Michiko Otsuka 2, Takeshi Sakai 1 and Toshinori.
Causes of Haze Assessment Mark Green Desert Research Institute Marc Pitchford, Chair Ambient Monitoring & Reporting Forum.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Preparation of the guidelines for vehicle non-exhaust emission modelling of PM10 and PM2.5 in Latvia Aiga Kāla, Valts Vilnītis SIA Estonian, Latvian &
IS Audit Function Knowledge
Chapter 3 Preparing and Evaluating a Research Plan Gay and Airasian
Short Course on Introduction to Meteorological Instrumentation and Observations Techniques QA and QC Procedures Short Course on Introduction to Meteorological.
Quality Assurance/Quality Control Policy
ISO 9000 Certification ISO 9001 and ISO
Guidelines for Traffic Control at Surface Mines
Air Quality Management Initiatives for Kuala Lumpur: A study of stakeholder roles, emission sources, and vulnerable populations Dr. Scott Kennedy Energy.
Auditing & Assurance Services, 6e
Codex Guidelines for the Application of HACCP
Approaches for forest certification System versus performance ? Presentation prepared by Pierre Hauselmann for the WWF / WB Alliance Capacity building.
All information was sourced
RESEARCH A systematic quest for undiscovered truth A way of thinking
The ARTEMIS tools for estimating the transport pollutant emissions Artemis project - EC DG Tren COST346 - Heavy duty vehicles emissions M. André, INRETS,
ISO 14001:2004, Environmental Management System
Section 7.5 The Central Limit Theorem 7.5 / 1. Theorem 7.1 for a Normal Probability Distribution (a)The x distribution is a normal distribution. (b)The.
What Does a Tribal Air Program Look Like? James Payne Morongo Band of Mission Indians Environmental Department.
JOB ANALYSIS.
” Particulates „ Characterisation of Exhaust Particulate Emissions from Road Vehicles Key Action KA2:Sustainable Mobility and Intermodality Task 2.2:Infrastructures.
TBT 14: Permit Compliance HILLS’ ETHOS: IMPROVEMENT ENGAGEMENT PREVENTION ACCOUNTABILITY PROGRESSIVE FRONT FOOT ROLES AND RESPONSIBILITIES HWS – Toolbox.
CC&E Best Data Management Practices, April 19, 2015 Please take the Workshop Survey 1.
ISO / IEC : 2012 Conformity assessment – Requirements for the operation of various types of bodies performing inspection.
4.3 Document control 4.4 Review of requests, tenders and contracts
Causes of Haze Assessment Dave DuBois Desert Research Institute.
Programme Objectives Analyze the main components of a competency-based qualification system (e.g., Singapore Workforce Skills) Analyze the process and.
ES Model development Dr. Ahmed Elfaig The ES attempts to predict results from available information, data and knowledge The model should be able to infer.
Course AE2104 Environmental Measuring and Monitoring.
P. Otorepec, M. Gregorič IVZ RS Use of rutinely collected air pollution and health data on local level for simple evaluation of health impact.
| Folie 1 Assessment of Representativeness of Air Quality Monitoring Stations Geneva, Wolfgang Spangl.
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 6-1 Chapter 6 CHAPTER 6 INTERNAL CONTROL IN A FINANCIAL STATEMENT AUDIT.
ISO DOCUMENTATION. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Name.
Regional Modeling Joseph Cassmassi South Coast Air Quality Management District USA.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
Department of the Environment Near Road NO2 Monitoring Update MWAQC Technical Advisory Committee January 10, 2012.
What is a lesson? It is a type of organised social event that occurs in virtually all cultures. Lessons in different places may vary in topic, time, place,
Preparation Plan. Objectives Describe the role and importance of a preparation plan. Describe the key contents of a preparation plan. Identify and discuss.
November 16, Retrospective Analysis of Ambient and Emissions Data and Refinement of Study Hypotheses –Task 1: Review of Available Emissions Data.
Copyright © 2016 South-Western/Cengage Learning A FRAMEWORK FOR AUDIT EVIDENCE CHAPTER 6 Auditing A Risk-Based Approach To Conducting A Quality Audit 10.
1 Service Coordinator Orientation FN R. CollESH SectionX8518.
Road Safety Education Program (RSEP) A first Summary July 2011 Putting People First.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
Systems Analysis Lecture 5 Requirements Investigation and Analysis 1 BTEC HNC Systems Support Castle College 2007/8.
Evaluation of pollution levels in urban areas of selected EMEP countries Alexey Gusev, Victor Shatalov Meteorological Synthesizing Centre - East.
Enhancement of Radiological Safety Culture within Ignalina NPP and Contractors Viktor PLETNIOV Ignalina Nuclear Power Plant Lithuania Gintautas KLEVINSKAS.
7. Air Quality Modeling Laboratory: individual processes Field: system observations Numerical Models: Enable description of complex, interacting, often.
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
GOVERNMENT OF TAMIL NADU HIGHWAYS DEPARTMENT HIGHWAYS RESEARCH STATION Training program for newly recruited Assistant Engineers.
Air Quality Emission inventories
Make or Buy transport.
NIEP Evaluation PO&A “How-to” Guide and Issue Classification
ISO/IEC
NTNU’s quality system for education
Environmental Standards for Regulation of mining projects in Greenland Kim Gustavson - Senior scientist Janne Fritt-Rasmussen - Environmental.
Representative Measurements – AQ-Workshop Bucharest, July 2008
Monitoring Guidance Johannes Grath Rob Ward 12th October 2005.
Calibration and Validation
Section 12.2 Comparing Two Proportions
Kingdom of Saudi Arabia
IWG Worn tyres Tyre Industry work status July 17th 2019
IWG Worn tyres Tyre Industry work status July 17th 2019
Fiber Reinforced Polymer Systems
IWG Worn tyres Tyre Industry work status July 17th 2019
Presentation transcript:

Bernd Heits AQ-Workshop Bucharest, July 2008 Planning of ambient air quality measurements General rules The guideline is an application aid to everyone involved in the planning, performance or evaluation of ambient air quality measurements. The guideline can be used by clients and contractors alike as a reference, for example, for formulating requirement and performance specifications for the investigation of air quality.

Bernd Heits AQ-Workshop Bucharest, July 2008 Planning of ambient air quality measurements General rules When applying the guideline and carrying out the measurement-planning tasks, basic knowledge in the following fields is useful: -assessment of air pollution and its effects -chemistry of air -measurement techniques in the field of trace analysis -meteorology -statistics -quality assurance

Bernd Heits AQ-Workshop Bucharest, July 2008 Planning of ambient air quality measurements General rules Content of the task description A specific task description is required in order to plan the measurements. For the purposes of the guideline, the task is considered to be described with sufficient clarity if it allows stipulations to be made concerning the following points: -air pollutants to be investigated, -assessment standards to be applied, -measurement techniques, including sampling, -measurement area and density of measuring sites or measurement locations, -duration of an individual measurement, frequency and period of measurement, -quality assurance, -evaluation and report. If necessary, these points shall be discussed with the client to define further details.

Bernd Heits AQ-Workshop Bucharest, July 2008 Planning of ambient air quality measurements General rules Ambient air quality measurements in accordance with EU directives Investigation of the initial load Investigation of traffic-related air pollution in residential areas Investigations of air pollution to verify whether harmful effects on objects to be protected are anticipated Investigation of the temporal distribution of air quality characteristics at stipulated measurement locations Investigation of the spatial distribution of air quality characteristics in urban areas Investigation of the spatial distribution of air quality characteristics in areas remote from the source Investigation of air quality characteristics in cases of complaints Investigation of the proportions from a significant source in the spatial distribution of air quality characteristics within a given area

Bernd Heits AQ-Workshop Bucharest, July 2008 Planning of ambient air quality measurements General rules Problem analysis 1.1Content of the task description 1.2Analysis of background information 1.3Assessment of the results of the measurements 1.4Measurement parameters, measurement area and measurement period 1.5Requirements on the results

Bernd Heits AQ-Workshop Bucharest, July 2008 Planning of ambient air quality measurements General rules Organization 2.1Project management 2.2Personnel planning 2.3Scheduling 2.4Subcontracts

Bernd Heits AQ-Workshop Bucharest, July 2008 Planning of ambient air quality measurements General rules Measurement techniques 3.1Time resolution of the measurements 3.2Performance characteristics 3.3Standardization of the measuring procedure 3.4Infrastructure for using measurement techniques 3.5Data recording and documentation of the measurements

Bernd Heits AQ-Workshop Bucharest, July 2008 Planning of ambient air quality measurements General rules Measurement strategy 4.1Measurement locations 4.2Measurement times 4.3Sampling period 4.4Duration of the measurement program 4.5Supplementary measurements

Bernd Heits AQ-Workshop Bucharest, July 2008 Planning of ambient air quality measurements General rules Evaluation 5.1Producing measured values 5.2Evaluation algorithms 5.3Measurement uncertainty 5.4Uncertainty of the result Quality assurance Reports

Bernd Heits AQ-Workshop Bucharest, July 2008 Planning of ambient air quality measurements General rules The guideline is based on a catalogue of questions which have to be answered in the corresponding sections of measurement plans. The catalogue of questions can be used as a basis for the set up and structure of measurement plans.

Bernd Heits AQ-Workshop Bucharest, July 2008 Planning of ambient air quality measurements General rules Problem analysis What objective is to be achieved? What background knowledge of the problem is available? How are the results of the measurements to be assessed? Which measurands are to be considered in which measurement area and during which measurement period? What requirements are placed on the results?

Bernd Heits AQ-Workshop Bucharest, July 2008 Planning of ambient air quality measurements General rules Organization Who is the project leader and who is his/her deputy? What personnel (qualification) will be assigned to which tasks in the course of the project? What is the schedule for the project performance? What quality assurance measures are planned for subcontracts in the course of the project?

Bernd Heits AQ-Workshop Bucharest, July 2008 Planning of ambient air quality measurements General rules Measurement techniques Will the required temporal resolution be achieved with the measurement procedure? Are the performance characteristics met with regard to the task description? Is a standardized measurement procedure required for the measurement task? Can the infrastructure for the measurements be provided? How will the measurement data be recorded and documented?

Bernd Heits AQ-Workshop Bucharest, July 2008 Planning of ambient air quality measurements General rules Measurement strategy How will the measurement locations be spatially distributed? How will the measuring times be distributed? Which sampling periods will be applied to which air pollutants? What is the duration of the measurement program? Will supplementary measurements be required?

Bernd Heits AQ-Workshop Bucharest, July 2008 Planning of ambient air quality measurements General rules Evaluation  How will the measured values be determined?  What evaluation algorithms will be used?  How will measured values below the detection limit be treated?  How will measurement gaps be treated?  How will outliers be treated?  How will the measurement uncertainty be determined?  How will the uncertainty of the result be determined?

Bernd Heits AQ-Workshop Bucharest, July 2008 Planning of ambient air quality measurements General rules Quality assurance What QA measures will be carried out? Reports What measurement reports will be prepared and how will these be structured?

Bernd Heits AQ-Workshop Bucharest, July 2008 Planning of ambient air quality measurements Rules for planning traffic related air pollutants Necessary informations:  Road geometry  Height and density of building  Building use  Traffic frequency and composition  Prevailing wind direction  Background pollution

Bernd Heits AQ-Workshop Bucharest, July 2008 Planning of ambient air quality measurements Rules for planning traffic related air pollutants Characterization of the traffic sources Average daily traffic density (DTV) Daily and weekly traffic profile Average traffic velocity Jam content Fleet composition Destination/origin traffic, cold-start content

Bernd Heits AQ-Workshop Bucharest, July 2008 Planning of ambient air quality measurements Rules for planning traffic related air pollutants Characterization of the traffic sources Number of motorized two-wheel vehicles Number of buses (Diesel, Gas) Differentiation between heavy and light trucks Effect of traffic lights and pedestrian crossings

Bernd Heits AQ-Workshop Bucharest, July 2008 Planning of ambient air quality measurements Rules for planning traffic related air pollutants Characterization of local conditions  Road or road section, intersection and square  Width of the road, the individual carriageways, the central reservation and sidewalks  Gradient of the road or road section  Geometry of building development (e.g. height of buildings, closed or open building development, overhead development, gaps in buildings, etc.)  Crossroads, junctions

Bernd Heits AQ-Workshop Bucharest, July 2008 Planning of ambient air quality measurements Rules for planning traffic related air pollutants Meteorological conditions  Wind direction, wind velocity at neighbouring measurement stations (possible frequency distribution)  Wind direction, wind velocity over roof top (optional)  Orientation of the road to the prevailing wind direction; position of the measuring site in the crossing area (impinging flow in the case of prevailing wind direction)

Bernd Heits AQ-Workshop Bucharest, July 2008 Planning of ambient air quality measurements Rules for planning traffic related air pollutants Pollution situation Measurement results from neighbouring long-term measurement stations (with low traffic pollution)