Kennedy Krieger Institute Outpatient Medical Center Baltimore, Marylan d Katie Sennett Construction Management Dr. Messner Spring 2008.

Slides:



Advertisements
Similar presentations
Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004.
Advertisements

STEM Center Delaware County Community College – Media, PA Thesis Final Presentation Dan Saxton Mechanical Option.
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
Coppin State University Physical Education Complex Kaylee Damico – Mechanical Option April 12 th, 2011 Presentation Outline Project Team Project Overview.
Integration of Mechanical System Redesign Geothermal Heat Pump Redesign Wesley S. Lawson Architectural Engineering Mechanical Option Pennsylvania State.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Bowie State University Fine and Performing Arts Center Zachary Lippert Faculty Advisor: Dr. Stephen Treado.
Charles F. Hurley Building Case Study B.J. Mohammadipour Bureau of State Office Buildings.
Crocker West Building State College, Pa Eric M. FosterStructural OptionSpring 2009.
The Edward St. John Student Center Zachary Haupt Faculty Advisor: Dr. William Bahnfleth 11 April 2011.
The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
Daniel Suter Construction Management AE Senior Thesis Presentation The Pennsylvania State University Unknown Data Center Somewhere, USA
LOCKWOOD PLACE BALTIMORE, MARYLAND Monica Steckroth- Structural Option.
North Pocono High School
Presentation Outline Introduction System Optimization Analysis Acoustical Breadth Conclusion Acknowledgements Questions Thesis Final Presentation Army.
National Institutes of Health Building 37 Modernization Katie L. McGimpsey Mechanical Option The Pennsylvania State University Department of Architectural.
Kenneth G. Langone Athletic and Recreation Center Kyle Oberdorf Structural Option Thesis April 2007.
Senior Thesis Structural Option Ryan Friis Spring Morgan St. Chicago, IL 111 Morgan St. Chicago, IL Ryan Friis Structural Option.
Introduction Connected to existing Benton Hall via skywalk Size: 103,154 SF above grade on 4 levels 82,661 SF below grade parking on 3 levels Cost: $23,651,159.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
Council Rock High School South Seth Glinski Construction Management Spring 2003 Thesis.
University Medical Center of Princeton David Bodnar Construction Management 2010 Senior Thesis.
Charles Miller Construction Option Spring Dr. Riley WestEnd25.
Structural System Redesign Existing Conditions Proposal Gravity Design Lateral Design Cost Comparison Schedule Impact Conclusions.
Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.
Paul Roberts Senior Thesis 2010 Construction Management.
The Health Care Center Dauphin County, PA Ken Lorenz Penn State University Architectural Engineering Construction Management April 17, 2007.
Helios Plaza Houston, TX Advisor - Dr. Hanagan Kevin Zinsmeister Structural Option.
Greg Blatt Penn State Architectural Engineering Construction Management April 12, 2004.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
VIMS Seawater Research Laboratory Dan DiCriscio AE Senior Thesis Mechanical Option 2007.
Bronx School for Law Government & Justice Yulien Wong Mechanical Option 2006 Senior Thesis Bronx, New York.
Tri-Valley Jr./Sr. High School Hegins, PA Senior Thesis, Spring 2004 Studying The Feasibility of a Dedicated Outdoor Air System.
Robert M. Arnold Building Fred Hutchinson Cancer Research Center
Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
Rensselaer, NY Meral Kanik Structural Option Advisor: A.M. Memari April 14, 2008.
 Building Statistics  State-of-the-Art Lab  Chief Medical Examiner  121,000 square feet  5 stories  $45 million project.
APPELL LIFE SCIENCES York College of Pennsylvania Joshua Martz | Dr. Srebric | April 11, 2011 Image Courtesy of RLPS, Ltd.
Andrew Diehl The Pennsylvania State University Architectural Engineering Department Structural Option 5 th Year Senior Thesis Project “The Comparison of.
University of Maryland’s Gossett Field House College Park, MD Jason Borowski Architectural Engineering Mechanical Option Pennsylvania State University.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
University of Delaware Center for the Arts Newark, DE Karen Schulte Mechanical Option Spring 2006.
Greenbriar East Elementary School Fairfax, Virginia Michelle L. Siano Mechanical Option Spring 2005 Senior Thesis.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
200 Minuteman Drive New Design for Additional Floors and Vibration Sensitive Equipment Brent Ellmann Structural Option Dr. Linda Hanagan - Consultant.
Malory J. Faust ∙ Mechanical Option ∙ Senior Thesis 2007.
Hamot Women’s Hospital Erie, PA Michael Galleher Mechanical Option l AE-Senior Thesis l April 12, 2011 l Advisor Dr. Jelena Srebric.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
William W. Wilkins Professional Building Columbus, Ohio Michelle Benoit Senior Thesis Presentation Spring 2007 Structural Option.
CBD Chemical Production Building Virginia, USA Christina DiPaolo │ Structural Option.
Manoa Elementary School Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010.
Andrew Diehl, EIT The Pennsylvania State University Architectural Engineering Department Structural Option 5 th Year Senior Thesis Project.
Pearl Condominiums Philadelphia, PA
David Anderson Mechanical Option
Redifer Commons Addition & Renovation Project
Grunenwald Science and Technology Building
Introduction James W. & Frances G. McGlothlin Medical Education Center
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
Biobehavioral Health Building, University Park, PA
Justin Pennycoff AE Senior Thesis 2008 Construction Management
Architectural Engineering, The Pennsylvania State University
Coppin State University
Project: 250 West Street, Columbus, Ohio
Presentation transcript:

Kennedy Krieger Institute Outpatient Medical Center Baltimore, Marylan d Katie Sennett Construction Management Dr. Messner Spring 2008

Project Overview Analysis 1: Structural System Analysis 2: Mechanical System Analysis 3: 3D Design Coordination Acknowledgements Questions/Comments Improving Cost, Constructability, & Quality

Project Overview Analysis 1: Structural System Analysis 2: Mechanical System Analysis 3: 3D Design Coordination Acknowledgements Questions/Comments Project Overview Location : Baltimore Maryland Occupancy and Function : Outpatient Medical Center for the Developmental Disabilities of Children Size: 115,000 Square Feet Schedule: 24 Months – Starting Jan & Ending Jan Total Project Cost: $3.5 Million Project Delivery Method : Risk

Project Overview Project Team Owner: Kennedy Krieger Institute CM: Whiting- Turner Contracting Company Architect: Stanley, Beaman, and Sears Structural & MEP Engineer: RFM Engineering Civil Engineer: RK +K Improving Cost, Constructability, & Quality Project Overview Analysis 1: Structural System Analysis 2: Mechanical System Analysis 3: 3D Design Coordination Acknowledgements Questions/Comments Location : Baltimore Maryland Occupancy and Function : Outpatient Medical Center for the Developmental Disabilities of Children Size: 115,000 Square Feet Schedule: 24 Months – Starting Jan & Ending Jan Total Project Cost: $3.5 Million Project Delivery Method : Risk

Improving Cost, Constructability, & Quality Project Overview Analysis 1: Structural System Analysis 2: Mechanical System Analysis 3: 3D Design Coordination Acknowledgements Questions/Comments Existing Site Condition: A parking lot KKI Parking Garage Foundation : Mat Slab Foundation System Project Overview

Improving Cost, Constructability, & Quality Project Overview Analysis 1: Structural System Analysis 2: Mechanical System Analysis 3: 3D Design Coordination Acknowledgements Questions/Comments Project Overview Existing Site Condition: A parking lot Structure: Cast In Place Concrete KKI Parking Garage Foundation : Mat Slab Foundation System Building Envelope: Precast Architectural Panels

Analysis 1 Improving Cost, Constructability, & Quality Project Overview Analysis 1: Structural System Analysis 2: Mechanical System Analysis 3: 3D Design Coordination Acknowledgements Questions/Comments Changing Structural System Problem : Structural System was timely and required employees to work weekends for 2 months. It was also had a high price. Objective: To change structural system from Cast –In-Place Concrete to Structural Steel to reduce construction schedule and project cost.

Analysis 1 Improving Cost, Constructability, & Quality Project Overview Analysis 1: Structural System Analysis 2: Mechanical System Analysis 3: 3D Design Coordination Acknowledgements Questions/Comments Procedure Redesign structural system Determine NEW construction schedule Create Sequence schedule Cost comparison to original system Changing Structural System Problem : Structural System was timely and required employees to work weekends for 2 months. It was also had a high price. Objective: To change structural system from Cast –In-Place Concrete to Structural Steel to reduce construction schedule and project cost.

Analysis 1 Initial Building: Typical Bay Size 29’ x 29’ Pan and Joist Flooring System (Orientation North-South) Columns Size: 30” diameter Improving Cost, Constructability, & Quality Project Overview Analysis 1: Structural System Analysis 2: Mechanical System Analysis 3: 3D Design Coordination Acknowledgements Questions/Comments Changing Structural System Problem : Structural System was timely and required employees to work weekends for 2 months. It was also had a high price. Objective: To change structural system from Cast –In-Place Concrete to Structural Steel to reduce construction schedule and project cost. Procedure Redesign structural system Determine NEW construction schedule Create Sequence schedule Cost comparison to original system

Analysis 1 Typical Bay size: 29’ x 29’ Total Building Live Load: kips Total Building Dead Load: kips Beam Size: 16 x 26 Girder Size: 21 x 68 Column Size: 14 x 90 (Orientation of beams East-West) Improving Cost, Constructability, & Quality Project Overview Analysis 1: Structural System Analysis 2: Mechanical System Analysis 3: 3D Design Coordination Acknowledgements Questions/Comments Changing Structural System Problem : Structural System was timely and required employees to work weekends for 2 months. It was also had a high price. Objective: To change structural system from Cast –In-Place Concrete to Structural Steel to reduce construction schedule and project cost. Procedure Redesign structural system Determine NEW construction schedule Create Sequence schedule Cost comparison to original system

NEW Schedule Analysis 1 Improving Cost, Constructability, & Quality Project Overview Analysis 1: Structural System Analysis 2: Mechanical System Analysis 3: 3D Design Coordination Acknowledgements Questions/Comments Changing Structural System Problem : Structural System was timely and required employees to work weekends for 2 months. It was also had a high price. Objective: To change structural system from Cast –In-Place Concrete to Structural Steel to reduce construction schedule and project cost. Procedure Redesign structural system Determine NEW construction schedule Create Sequence schedule Cost comparison to original system Original Schedule = 86 days New Schedule = 43 days Reducing Schedule by = 43 Days

Construction Sequence Schedule: Showing only the 1 st floor up to the 2 nd floor. Analysis 1 Improving Cost, Constructability, & Quality Project Overview Analysis 1: Structural System Analysis 2: Mechanical System Analysis 3: 3D Design Coordination Acknowledgements Questions/Comments Changing Structural System Problem : Structural System was timely and required employees to work weekends for 2 months. It was also had a high price. Objective: To change structural system from Cast –In-Place Concrete to Structural Steel to reduce construction schedule and project cost. Procedure Redesign structural system Determine NEW construction schedule Create Sequence schedule Cost comparison to original system Section Schedule 25-Jun26-Jun27-Jun28-Jun29-Jun2-Jul3-Jul4-Jul 5-Jul Section 1-1 Steel erectionMetal DeckConcrete Section 1-2 Steel erectionMetal DeckConcrete Section 1-3 Steel erectionMetal DeckConcrete Section 1-4 Steel erectionMetal DeckConcrete Section 1-5 Steel erectionMetal DeckConcrete Section 1-6 Steel erectionMetal DeckConcrete Section 2-1 Steel erection Metal Deck Concrete Start Here End Here N

Analysis 1 Improving Cost, Constructability, & Quality Project Overview Analysis 1: Structural System Analysis 2: Mechanical System Analysis 3: 3D Design Coordination Acknowledgements Questions/Comments Changing Structural System Problem : Structural System was timely and required employees to work weekends for 2 months. It was also had a high price. Objective: To change structural system from Cast –In-Place Concrete to Structural Steel to reduce construction schedule and project cost. Procedure Redesign structural system Determine NEW construction schedule Create Sequence schedule Cost comparison to original system

Cost Comparison Cast in Place Concrete = $4,181,700 Redesigned Structural System = $3,517, 972 A TOTAL SAVINGS OF = $663,738 Analysis 1 Improving Cost, Constructability, & Quality Project Overview Analysis 1: Structural System Analysis 2: Mechanical System Analysis 3: 3D Design Coordination Acknowledgements Questions/Comments Changing Structural System Problem : Structural System was timely and required employees to work weekends for 2 months. It was also had a high price. Objective: To change structural system from Cast –In-Place Concrete to Structural Steel to reduce construction schedule and project cost. Procedure Redesign structural system Determine NEW construction schedule Create Sequence schedule Cost comparison to original system

Recommendations Benefit s the Owner by using a steel structural system by: Reduces the project schedule and gets the owner into the building two months sooner which allows them to start making a revenue sooner. Reduces overall project cost which allows owner to purchase more specialized equipment for the children. Analysis 1 Improving Cost, Constructability, & Quality Project Overview Analysis 1: Structural System Analysis 2: Mechanical System Analysis 3: 3D Design Coordination Acknowledgements Questions/Comments Changing Structural System Problem : Structural System was timely and required employees to work weekends for 2 months. It was also had a high price. Objective: To change structural system from Cast –In-Place Concrete to Structural Steel to reduce construction schedule and project cost. Procedure Redesign structural system Determine NEW construction schedule Create Sequence schedule Cost comparison to original system

Analysis 2 Improving Cost, Constructability, & Quality Project Overview Analysis 1: Structural System Analysis 2: Mechanical System Analysis 3: 3D Design Coordination Acknowledgements Questions/Comments Heat Recovery System Problem : Since the building is a medical center, it requires 100% exhaust air. This increases energy costs to heat/cool supply air. Objective: To decrease energy costs by installing enthalpy wheels into the 3 AHU and maintain indoor air quality. Initial Mechanical System Includes 3 Air Handling Units with a 40,000cfm Capacity Cooling Capacity : Tons : 2,962.2 Mbh Heating Capacity : -2,270.4 Mbh Energy Consumption

Analysis 2 Improving Cost, Constructability, & Quality Project Overview Analysis 1: Structural System Analysis 2: Mechanical System Analysis 3: 3D Design Coordination Acknowledgements Questions/Comments Heat Recovery System Problem : Since the building is a medical center, it requires 100% exhaust air. This increases energy costs to heat/cool supply air. Objective: To decrease energy costs by installing enthalpy wheels into the 3 AHU and maintain indoor air quality. Procedure Evaluate Mechanical system with a heat recovery system Re-design air handling unit Cost of system Cost comparison to original system

Analysis 2 Improving Cost, Constructability, & Quality Project Overview Analysis 1: Structural System Analysis 2: Mechanical System Analysis 3: 3D Design Coordination Acknowledgements Questions/Comments Heat Recovery System Problem : Since the building is a medical center, it requires 100% exhaust air. This increases energy costs to heat/cool supply air. Objective: To decrease energy costs by installing enthalpy wheels into the 3 AHU and maintain indoor air quality. Procedure Evaluate Mechanical system with a heat recovery system Re-design air handling unit Cost of system Cost comparison to original system The best heat recovery system for this building is the enthalpy wheel. It preconditions the air before final heating/cooling the supply air. Enthalpy Wheel: Captures the hot/cold element from the exhaust air to pre condition the supply air. It prevent contaminates by expelling contaminates out through exhaust air duct.

Analysis 2 Improving Cost, Constructability, & Quality Project Overview Analysis 1: Structural System Analysis 2: Mechanical System Analysis 3: 3D Design Coordination Acknowledgements Questions/Comments Heat Recovery System Problem : Since the building is a medical center, it requires 100% exhaust air. This increases energy costs to heat/cool supply air. Objective: To decrease energy costs by installing enthalpy wheels into the 3 AHU and maintain indoor air quality. Procedure Evaluate Mechanical system with a heat recovery system Re-design air handling unit Cost of system Cost comparison to original system Mechanical System with Enthalpy Wheels Includes 3 Air Handling Units with a 40,000cfm Capacity Cooling Capacity :216.6Tons : 2,559.9 Mbh Heating Capacity : -1,974.7 Mbh Energy Consumption

Analysis 2 Improving Cost, Constructability, & Quality Project Overview Analysis 1: Structural System Analysis 2: Mechanical System Analysis 3: 3D Design Coordination Acknowledgements Questions/Comments Heat Recovery System Problem : Since the building is a medical center, it requires 100% exhaust air. This increases energy costs to heat/cool supply air. Objective: To decrease energy costs by installing enthalpy wheels into the 3 AHU and maintain indoor air quality. Procedure Evaluate Mechanical system with a heat recovery system Re-design air handling unit Cost of system Cost comparison to original system Mechanical System with Enthalpy Wheels Cooling Capacity Difference = 30 Tons =400 Mbh Heating Capacity Difference = 300 Mbh Energy Consumption Building Energy Consumption = 1,955 Btu/ft^2-year

Analysis 2 Improving Cost, Constructability, & Quality Project Overview Analysis 1: Structural System Analysis 2: Mechanical System Analysis 3: 3D Design Coordination Acknowledgements Questions/Comments Heat Recovery System Problem : Since the building is a medical center, it requires 100% exhaust air. This increases energy costs to heat/cool supply air. Objective: To decrease energy costs by installing enthalpy wheels into the 3 AHU and maintain indoor air quality. Procedure Evaluate Mechanical system with a heat recovery system Re-design air handling unit Cost of system Cost comparison to original system Enthalpy Wheel

Analysis 2 Improving Cost, Constructability, & Quality Project Overview Analysis 1: Structural System Analysis 2: Mechanical System Analysis 3: 3D Design Coordination Acknowledgements Questions/Comments Heat Recovery System Problem : Since the building is a medical center, it requires 100% exhaust air. This increases energy costs to heat/cool supply air. Objective: To decrease energy costs by installing enthalpy wheels into the 3 AHU and maintain indoor air quality. Procedure Evaluate Mechanical system with a heat recovery system Re-design air handling unit Cost of system Cost comparison to original system Cost of System Each Enthalpy wheel costs = $39,550 The new system needs 3 (one for each AHU) Total = $118,650

Analysis 2 Improving Cost, Constructability, & Quality Project Overview Analysis 1: Structural System Analysis 2: Mechanical System Analysis 3: 3D Design Coordination Acknowledgements Questions/Comments Heat Recovery System Problem : Since the building is a medical center, it requires 100% exhaust air. This increases energy costs to heat/cool supply air. Objective: To decrease energy costs by installing enthalpy wheels into the 3 AHU and maintain indoor air quality. Procedure Evaluate Mechanical system with a heat recovery system Re-design air handling unit Cost of system Cost comparison to original system Cost Comparison to Original System

Analysis 2 Improving Cost, Constructability, & Quality Project Overview Analysis 1: Structural System Analysis 2: Mechanical System Analysis 3: 3D Design Coordination Acknowledgements Questions/Comments Heat Recovery System Problem : Since the building is a medical center, it requires 100% exhaust air. This increases energy costs to heat/cool supply air. Objective: To decrease energy costs by installing enthalpy wheels into the 3 AHU and maintain indoor air quality. Procedure Evaluate Mechanical system with a heat recovery system Re-design air handling unit Cost of system Cost comparison to original system Recommendations The Enthalpy wheel was found to save about $3,000 per year on energy costs. However, the total cost of the wheels is $118,650 and it would take 41 years to pay off the wheels before saving money on energy consumption. The wheels are also very large and need a long lead time prior to installation. The buildings roof is also not designed to be remove to maintain and replace the systems which are located in the penthouse. Saving energy is good but in this case it is just to costly for the owner.

Analysis 3 - Critical Industry Research Improving Cost, Constructability, & Quality Project Overview Analysis 1: Structural System Analysis 2: Mechanical System Analysis 3: 3D Design Coordination Acknowledgements Questions/Comments 3D Design Coordination Problem : This project did not use 3D design coordination for the MEP system. This created many unproductive meetings and many changes orders. Objective: To research the use of 3D design coordination for MEP systems with clash detection and to figure out companies think about it.

Improving Cost, Constructability, & Quality Project Overview Analysis 1: Structural System Analysis 2: Mechanical System Analysis 3: 3D Design Coordination Acknowledgements Questions/Comments Procedure Figure out the cost of the program Survey results Conclusion 3D Design Coordination Problem : This project did not use 3D design coordination for the MEP system. This created many unproductive meetings and many changes orders. Objective: To research the use of 3D design coordination for MEP systems with clash detection and to figure out companies think about it. Analysis 3 - Critical Industry Research

Improving Cost, Constructability, & Quality Project Overview Analysis 1: Structural System Analysis 2: Mechanical System Analysis 3: 3D Design Coordination Acknowledgements Questions/Comments The cost of the system 3D design coordination requires computer software and training. Autodesk SoftwarePrice Corporate Classroom Training AutoCAD$3,9703-Day (27hrs) = $2,350 Revit MEP$2,5365-Day (45hrs) = $3,950 Revit Structural$3,103Corporate On-Site Training NavisWorks $8,0003-Day (27hrs) = $1,950 5-Day (45hrs) = $3,250 Analysis 3 - Critical Industry Research 3D Design Coordination Problem: Many u nproductive MEP coordination meetings which resulted in many changes orders. Objective : To research the use of 3D design coordination for MEP systems with clash detection and to survey the contractors and designs on the project about their thoughts on the program Procedure Figure out the cost of the system Survey results Conclusion

Improving Cost, Constructability, & Quality Project Overview Analysis 1: Structural System Analysis 2: Mechanical System Analysis 3: 3D Design Coordination Acknowledgements Questions/Comments 3D Design Coordination Problem: Many u nproductive MEP coordination meetings which resulted in many changes orders. Objective : To research the use of 3D design coordination for MEP systems with clash detection and to survey the contractors and designs on the project about their thoughts on the program Procedure Figure out the cost of the system Survey results Conclusion Analysis 3 - Critical Industry Research Survey Results Companies lack the resources and the funds Coordinating project team is very difficult Most larger companies are subcontracting the 3D design work out to specialists

Improving Cost, Constructability, & Quality Project Overview Analysis 1: Structural System Analysis 2: Mechanical System Analysis 3: 3D Design Coordination Acknowledgements Questions/Comments Analysis 3 - Critical Industry Research 3D Design Coordination Problem: Many u nproductive MEP coordination meetings which resulted in many changes orders. Objective : To research the use of 3D design coordination for MEP systems with clash detection and to survey the contractors and designs on the project about their thoughts on the program Procedure Figure out the cost of the system Survey results Conclusion Companies are aware the price to implement the program Companies know the process to utilize Companies feel that once technology increases more and the demand to use 3D design coordination increases, companies will then start implementing and utilizing 3D design coordination on construction projects.

Acknowledgements Improving Cost, Constructability, & Quality Project Overview Analysis 1: Structural System Analysis 2: Mechanical System Analysis 3: 3D Design Coordination Acknowledgements Questions/Comments I would like to thank: Kennedy Krieger Institute Project Whiting-Turner Contracting AE Faculty and Staff Family and Friends Thank You

Questions / Comments Improving Cost, Constructability, & Quality Project Overview Analysis 1: Structural System Analysis 2: Mechanical System Analysis 3: 3D Design Coordination Acknowledgements Questions/Comments ?

Site Plan & Penetration Improving Cost, Constructability, & Quality Project Overview Analysis 1: Structural System Analysis 2: Mechanical System Analysis 3: 3D Design Coordination Acknowledgements Questions/Comments

Mechanical Improving Cost, Constructability, & Quality Project Overview Analysis 1: Structural System Analysis 2: Mechanical System Analysis 3: 3D Design Coordination Acknowledgements Questions/Comments

Improving Cost, Constructability, & Quality Project Overview Analysis 1: Structural System Analysis 2: Mechanical System Analysis 3: 3D Design Coordination Acknowledgements Questions/Comments Interview Sources NameCompanyRole Fred NashEnterprise ElectricCAD Operator Louis WestermeyerWindsor Electirc Co.Project Manager Thomas FidlerBrown & Heim Electric ContractorsVice President Graham ErbeSouthern MechanicalEstimator/Project Manager N/AMechanical Engineering & Construction CorporationProject Manager Interview Sources