Methods of Specifying ACT 380 1. Objective Recognize the language, proper preparation, and appropriate situation for the four methods of specifying. 2.

Slides:



Advertisements
Similar presentations
ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
Advertisements

Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
Session 8 Implementing PPPs
RFP vs. IFB A BASIC APPROACH TO THE BID PROCESS – WHEN RFPs or IFBs ARE USED 2010 AASBO Spring Pre-Conference Workshop Rosa Saenz, PGPC, Inc. Bill Munch,
Utah Procurement Code Training
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
Source Selection and Contract Award
Amendments to the Specifications Discussion of Changes to the Concrete Materials Specifications.
The Threshold Has Changed: Now What Should I do? Presented by Jan Giffin, CPPO, CPPB, VCO Procurement Management Account Executive, DGS/DPS.
ARCH 330 Contract Documents to Specifications. Contract Documents: Are defined as the legally enforceable requirements that become part of the contract.
Circular A-110 Everything You Didn’t Want to Know.
ESTIMATING By Laith Jacob.
PROCEDURES FOR SELECTING THE CONTRACTOR
COMMERCIAL “SOLE SOURCE” PROPOSAL ANALYSIS ROADMAP 1. Is information available within the Government? Step 1 – Information within the Government If Yes.
Construction Engineering 221 Drawings and Specifications.
Office of Business Development Training
Partnership Agreements Delegation of SBA’s Contract Execution Authority to other Federal Government Agencies.
1 CDBG Procurement Requirements For Local Officials.
Construction Contract Documents
Washington Metropolitan Area Transit Authority Pre-Proposal Conference Sourcing and Contracts Management System (CMS) Solution Request for Proposal FQ
Introductory to the “Basics” of Contract Types and Their Impact in the Management of Government Property Presented by: Fay K. Schulte, CPPM.
Office of Traffic, Safety and Technology Module 6 Specifications and Special Provisions Traffic Control Plan Development Course.
Construction Specifications
Module 10 Organizing Procurement Session 10.7 Procurement of Goods:
To teach specification preparation  the importance of well-prepared specifications in procurement  the different types of specifications  basic writing.
FAR Part 2 Definitions of Words and Terms. FAR Scope of part (a)This part – (1) Defines words and terms that are frequently used in the FAR; (2)
Chapter 42 Construction Specifications. 2 Links for Chapter 42 Introduction Construction Specifications Construction Documents.
Debby Shapero Propp CESO 2004 April 30, 2004 TREATMENT OF MEDICAL DEVICE LICENSING ISSUES IN PROCUREMENT DOCUMENTATION.
Methods of Specifying Review Questions. 1.The four methods of specifying are: a.Performance, descriptive, proprietary and alternate b.Descriptive, performance,
Multiple Award Contracts Training Presented by Jennifer Salts State of Utah - Division of Purchasing 1.
COMPETITION REQUIREMENTS
ZHRC/HTI Financial Management Training Session 9: Stores and Supplies Management.
CHAPTER#08 MANAGEMENT OF TECHNICAL PROPOSALS AND SPECIFICATIONS Lecture No. 08 Course: Engineering Management 19 april 2013 MED DEPARTMENT, U.E.T TAXILA.
Advanced Project Management Project Procurement/Contract Management Ghazala Amin.
Construction Documents ACT Objective To acquire a basic understanding of the contents and relationship between the documents which make up the.
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
Construction Materials and Workmanship. All workmanship, materials, equipment, and articles incorporated into the work are to be of the best available.
Conditions of the Contract ACT Objective To provide an overview of the Conditions of the Contract, their purpose, content, and relationship to.
1/33.  Performance based approach  Definitions and responsibilities  Standard requirements  Exposure classes  Fresh concrete requirements  Hardened.
CONTRACT PRICING ALTERNATIVES Presented by: Fahad H. Al-Anazi CEM 520 February 27,1999.
Additional Commercial Contract Types FAR Case Summary of Comments from October 19, 2004 Public Meeting Appropriate Use Terms and Conditions Payment.
Chapter 13 Section 1 Bobbie K and Juan R. What is a Sale? The Uniform Commercial Code (UCC) governs sales of goods, also governs contracts to sell goods.
Elevating the Quality of Life in the District Contracting and Procurement Division Information Session 2 Request for Proposal November 5, 2015.
Chapter 6: Writing the Front Matter and Executive Summary.
Allowances, Unit Prices, and Alternates ACT
Office of Procurement Services.  Vendor Application Website: 
Introduction to Procurement for Public Housing Authorities Procurement Planning: Choosing a Contracting Method Unit 2.
Construction Documents Drawings Specifications Bid documents Construction Sketches and other data.
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
Technical Specifications & Employer's Requirements
FAR Part 2 - Definitions of Words and Terms
Preparing a Patent Application
Particular Conditions of Contract & Appendix to Tender
Bidding Requirements Review Questions.
Methods of Specifying Review Questions.
International Open Procedure (1) – PRAG 4.3
Particular Conditions of Contract & Appendix to Tender
First Article Test (FAT) / Production Lot Test (PLT)
UTILITY VAULTS: THE PRECAST ADVANTAGE
Request for Proposal & Proposal
Navigating FDOT Specifications and Standards
Caltrans 2010 standard specifications
DEFINING REQUIREMENTS (REV. 05/22/2008)
2018 Revisions to NYCDOB Code
Presented By Melissa Lee Assistant Purchasing Agent Tarrant County
Document Development for Metro Project: Performance-based Procurement Asphalt Overlay for Programmed Maintenance 17/01/2019.
BIDDING DOCUMENTS AND MAIN FEATURES
Preparing a Patent Application
Fiber Reinforced Polymer Systems
Presentation transcript:

Methods of Specifying ACT 380 1

Objective Recognize the language, proper preparation, and appropriate situation for the four methods of specifying. 2

4 Methods of Specifying O Descriptive O Performance O Reference Standards O Proprietary *****See pages 5.58 through 5.7 3

Descriptive O Defines exact properties of materials and methods of installation without using proprietary names O Is prescriptive – the products and processes are specified – not the results O Once widely used – but as projects have become more complex and better reference standards are available – used less 4

Example Descriptive Method O A concrete mix of four-parts coarse aggregate, two-parts fine aggregate, and one-part cement with a 0.5 water-cement ratio is specified O It is implied that “ a performance strength of 3,000 psi after 28 days” will result in this mix – but is not specified O If concrete conforming to this mix were supplied- but failed - the contractor would not be held responsible 5

5 Steps to Preparing Descriptive Spec O Research available products O Research critical features needed O Determine which features are best specified and which are best shown on the drawings O Describe critical features (min. acceptable requirements) O Provide specific information about submittals, testing, and other procedures needed to ensure product meets needs. Be realistic in doing this. 6

Performance O Specifies the required results O The criteria by which the performance will be judged O The method by which all this can be verified O The contractor may choose the materials and methods as long as it complies with the performance criteria 7

Problem with Performance Spec O If incomplete…it can result in major loss of control over the quality of materials, equipment, and workmanship O Much more time consuming than other methods of specifying 8

Performance vs. Descriptive O In a simple project one is requiring the use of a “ceiling hanger”. Performance requirements in this case can easily be incorporated by: O Performance spec – “non-sag” AS OPPOSED TO: O Descriptive spec – “straightened No. 11 wire, tightly wrapped two times’ O See page 4.43; fig 4.8-A 9

Reference Standards O Requires a product or process be in accordance with an established standard O Typical standards encompass: O Basic material standards (ASTM C standard spec for concrete aggregates) O Product standards (ANSI/AAMA specs for aluminum windows) O Design standards (ACI 318 – building code requirements for reinforced concrete) 10

Reference Standards con’t O Workmanship standards (ASTM E 737 standard practice for installation of storm windows, replacement….) O Test method standard (ASTM E 34 chemical analysis of aluminum and aluminum alloys O Codes (ANSI/ASME A17.1 safety code for elevators and escalators 11

Reference Standards con’t O These are incorporated into the specification by referring to a number, title, or other designation O Realize that standards usually refer to minimum requirements 12

Guidelines for Using Reference Specs O Know the standard O Some reference standards may contain provisions. Theses provisions may be voided in a footnote or subsequent paragraph unless specifically stated in the specifications O Some standards include several categories. i.e., ASTM C standard spec for portland cement actually covers 8 types of cement. If not stated which one…the least expensive may be used…may not meet project requirements 13

Guidelines for Using Reference Specs O Incorporate the standard properly – O Because the reference standards sometimes refer to workmanship, this could cause conflicting or duplicate statements with Conditions of the Contract or Division 1. The solution: Include a clause in the Supplementary Conditions stating that the requirements of the Conditions of the Contract govern over the requirements of reference standards 14

Guidelines for Using Reference Specs O A complete designation includes: name of the issuing organization, number of the standard, title, and date of issue O Dates can be a concern because periodically standards are updated Solution: in Divsion1, Section – References include a statement which is similar to this, “the date of the standard is that in effect as of Bid date, or date of Owner-Contractor Agreement when there are no bids” O Enforce the requirements of the standard 15

Proprietary Spec O Specifies actual brand names, model numbers, and other proprietary information O Prescriptive (descriptive method is other one) O Federal and public projects forbid the use of this method except in a few special circumstances O 2 main types: closed and open 16

Closed Proprietary Spec O Only one product is named O Several products may be named as options O NO substitutions 17

Open Proprietary Spec O Prices are requested for specified alternatives O Substitutions and cost adjustments may be proposed by the bidders O Products are allowed as substitutions after approval by A/E 18

Advantages of Proprietary Spec O Close control of product selection O Preparation of more detailed and complete drawings based on precise information obtained from manufacturer’s data O Shorter specifications and reduced production time O Simplification of bidding by narrowing competition and removing product pricing as a major variable 19

Disadvantages of Proprietary Spec O Elimination of narrowing of competition O Requiring products with which the contractor has perhaps had little or bad experience (slow delivery, lack of proper technical services, difficult payment arrangements) O Favoring certain products and manufacturers over others 20

Simplified Example of Methods of Specifying— Class Exercise O For this very simple example we will use a common fruit --- an APPLE. O How would you specify an apple using the following methods? O Descriptive O Performance O Reference Standards O Proprietary 21

Descriptive /2 INCHES to 3 INCHES DIAMETER MEDIUM RED TO RUST COLOR CAPABLE OF MEETING TRADITIONAL COOKING OR EATING CLASSIFICATIONS

Performance 23 TASTES GREAT

Reference Standard 24 USA Brand, USDA GRADE # 1

Proprietary 25 JONATHAN