Discussion Topic 2 Discussions TOPIC 2: Implementation costs.

Slides:



Advertisements
Similar presentations
POLAND Development Management System in Poland Brussels, 2 July 2010.
Advertisements

[Organisation’s Title] Environmental Management System
GReening business through the Enterprise Europe Network EN Giovanni FRANCO European Commission Enterprise and Industry EN
EU Wetland conservation policy. Communication on the Wise Use and Conservation of Wetlands (1995) => first European document dedicated exclusively.
Capacity Enhancement for Air Quality Management John E. Hay Senior Advisor UNEP ROAP & IETC.
TRP Chapter Chapter 4.2 Waste minimisation.
Simple, Effective, Transparent Regulation: Best Practices in OECD countries Cesar Cordova-Novion Deputy Head of Programme Regulatory Reform, OECD.
Seppo Silvonen Seppo Silvonen, Motiva Oy Finland Energy auditing as an essential part of the investment process Finnish national and EU energy.
Chapter 4 Conventional Solutions to Environmental Problems: The Command-and-Control Approach © 2004 Thomson Learning/South-Western.
Developing a Waste Water Discharge Fee Programme in Sri Lanka Kolitha Himal Muthukuda Arachchi Deputy Director General, Pollution Control Central Environmental.
1 Inspection of LCPs: System for Inspection. ECENA Training Workshop Bristol, March 2008.
Water.europa.eu Indepth assessment economic analysis progress report SCG meeting May 2008 Maria Brättemark, Unit D.2, DG Environment, European Commission.
Emissions Inventory and Air Quality Planning National Urban Air Quality Workshop Lahore, Pakistan December 13, 2004.
Technical Meeting on Evaluation Methodology for Nuclear Power Infrastructure Development December, 2008 Nuclear Safety in Infrastructure Building.
1 DG Enterprise & Industry European Commission Administrative Burden Reduction and Impact Assessment Presentation by Cavan O’Connor Close European Commission.
Energy Efficiency Opportunities (EEO) Program 2nd International Conference on the Global impact of Energy Management Systems: ‘Creating the right environment.
1 Module 4: Designing Performance Indicators for Environmental Compliance and Enforcement Programs.
Ozone Overview John Koswan July 11, OZONE SIP DEVELOPMENT: TASKS COMPLETED TO DATE.
© OECD/IEA – 2011 Key Insights from IEA Indicator Analysis ENERGY INDICATORS Efficient Power Generation 2011 Roundtable 4: Efficient use of energy in the.
DG Enterprise and Industry Philippe JEAN Sustainable Mobility & Automotive Industry Unit WP.29 Enforcement Working Group meeting 27 June update.
CP methodology adapted to UNFCCC Swedish International Development Agency S ESSION 9.A United Nations Environment Program Division of Technology Industry.
TRP Chapter Chapter 3.1 Regulatory approaches.
Review of practice of ELVs and other conditions setting in EU member states for non-Annex I installations Valts Vilnītis.
Animal Welfare EU Strategy Introduction Community Action Plan The Commission's commitment to EU citizens, stakeholders, the EP and.
Workshop on Interaction between Air-Quality Monitoring and Air-protection Strategies in EECCA Countries UN ECE WGEMA, June 11, 2007 Draft Strategy for.
UNEP Training Resource Manual Topic 11 Slide 1 Aims of EIA implementation and follow up are to: F carry out conditions of approval F ensure they work effectively.
Emission control in Bulgaria The involved institutions at national and local (sub-national) levels in Emissions inventory are Ministry of Environment.
1 European Union Regional Policy – Employment, Social Affairs and Inclusion The new architecture for cohesion policy post-2013 High-Level Meeting on the.
Quality assurance / Quality control system for the Greek GHG emissions inventory Yannis Sarafidis, Elena Georgopoulou UNFCCC Workshop on National Systems.
Low carbon scenarios for the UK Energy White Paper Peter G Taylor Presented at “Energy, greenhouse gas emissions and climate change scenarios” June.
Presentation to HAUC (UK) Wednesday 30 May 2012 RINA London.
Stationary and Area Source Committee Update OTC Committee Meeting September 13, 2012 Washington, D.C. Hall of the States 1.
National Academy of Sciences: Air Quality Management in the United States MWAQC Briefing March 24, 2004.
Approaches and Mainstreaming of Ecosystem-based Adaptation in Europe International workshop “Mainstreaming an ecosystem based approach to climate change.
LES – A National Perspective Martin Williams Atmospheric Quality and Industrial Pollution DEFRA 12 May 2009.
Discussion Topic 2 Discussions TOPIC 1: Air quality plans for complying with target values Action plans where risk of exceedence of alert threshold values.
1 Review of the Integrated Pollution Prevention and Control (IPPC) and National Emission Ceilings (NEC) Directives Marianne Wenning DG ENV, Head of Unit,
ISO MONITORING AND MEASUREMENT. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be.
Assessment of options to streamline legislation on industrial emissions IPPC Review Stakeholder Hearing 4 May 2007 Caspar Corden Entec UK Limited.
The Canadian Approach To Compiling Emission Projections Marc Deslauriers Environment Canada Pollution Data Division Science and Technology Branch Projections.
Background very brief summing up of the NSS conclusions Background very brief summing up of the NSS conclusions Dr. Elewa.
Recommendation of the European Parliament and of the Council of 4 April 2001 providing for Minimum Criteria for Environmental Inspections in the Member.
Changes in the context of evaluation and assessment: the impact of the European Lifelong Learning strategy Romuald Normand, Institute of Education Lyon,
HEALTH FINANCING MOH - HPG JAHR UPDATE ON POLICIES Eleventh Party Congress -Increase state investment while simultaneously mobilizing social mobilization.
Sustainable Cities through Environmental Compliance and Enforcement Kenneth Markowitz 19 October 2015.
Analysis of climate finance policy instruments. 2 Imprint Published by: Contact adelphi Caspar-Theyss-Strasse 14a Berlin / Germany T
UNDP Guidance for National Communication Project Proposals UNFCCC Workshop on the Preparation of National Communications from non-Annex I Parties Manila,
SUPPLEMENTAL ENVIRONMENTAL PROJECTS. KEY CHARACTERISTICS OF A SEP Projects must improve, protect or reduce risks to public health or environment. Projects.
Demonstrating and Promoting Best Techniques and Practices for Reducing Health Care Waste to Avoid Environmental Releases of Dioxins and Mercury Project.
 ROAD SAFETY: the European Union Policy European Commission, Directorate General for Mobility & Transport «Road Safety.
1 Workshop “Energy Efficiency management in chemical Industry sector" Thessaloniki, Greece Use of CARE +Tools in Bulgaria energy management.
Lithuanian Water Suppliers Association LEGAL REGULATION OF WASTEWATER DISPOSAL AND TREATMENT IN LITHUANIA.
State Regulation in the Natural Monopoly Sphere Agency of the Republic of Kazakhstan on Regulation of Natural Monopolies ALMATY – 2006.
Heat Network Demonstration SBRI: policy context & objectives for the competition Natalie Miles Heat Strategy and Policy (Heat Networks)
IPPC Permit Procedure in the UK Kiev, 26 January 2011 Alex Radway Senior Advisor Environment Agency for England & Wales, United Kingdom.
ASSESSING POSSIBLE INCENTIVES TO ENCOURAGE THE PRIVATE SECTOR TO INVEST IN ENVIRONMENTALLY SOUND MANAGEMENT Dr. Leila Devia, BCRC Argentina Ross Bartley,
Understanding the Integrated Resource Plan (IRP 2010 Rev 2)
IPPC A general overview Nigel Barraclough Policy Adviser Industrial Pollution Control Branch Air and Environment Quality Division. Taiwanese Environmental.
Topic 6 : Incentive Based Strategies
John Davis Mojave Desert and Mountain Recycling Authority.
Experiences with creation of sustainable mobility plans (LTPs) in UK David Blackledge Transport and Travel Research Czech – Slovak conference on Integrated.
Industrial Policy of India
Air Quality Management Components
Forum for Air quality Modelling FAIRMODE ew. eea
Indepth assessment economic analysis progress report SCG meeting May 2008 Maria Brättemark, Unit D.2, DG Environment, European Commission.
SSG on WFD and agriculture
Assessing Costs for Environmental Decision Making
ECONOMICS IN THE WFD PROCESS
Assessment of Member States‘ 2nd River Basin Management Plans
Industrial Emissions Directive Targeted stakeholder survey
Presentation transcript:

Discussion Topic 2 Discussions TOPIC 2: Implementation costs

Initial set-up costs Consultation with key actors and stakeholders (national and local government); Establishment of the competent authority (CA) (national government); Devising quality assurance systems and procedures (CA); Provision of training (CA); Preparing initial technical guidance documents (CA); Setting up a public information and warning system (CA). Initial set-up costs relatively LOW

Capital expenditure Purchase and siting of network of air quality monitoring stations and associated quality-assurance equipment for assessment and classification (CA, local authorities); Implementation of improvements to industrial sources (changing materials, processes and/or adding abatement technology) (costs by industry or other owners of the sources).

Ongoing running costs - 1 Updating technical guidance documents and setting up telephone helpline (CA); Assessment and classification (e.g. operating the network of air quality monitoring stations and associated quality-assurance equipment) Maintenance of monitoring station network (repairs, spares, consumables, rental of sites, electrical power) (CA, LAs); Analysis of samples (CA, LAs); Maintenance of quality-assurance facilities (CA and some LAs); Modelling of different emissions control scenarios and the subsequent development of plans costs for local modelling = capital costs of one multi-pollutant monitoring station

Ongoing running costs - 2 Compiling and checking of results from modelling and monitoring (CA, LAs); Preparation and updating of plans and programmes to achieve compliance with air quality limits (CA, LAs and possibly by major industrial sources); Fiscal incentives to use less-polluting materials/equipment (nat gov, LAs); Keeping and updating of inventories Maintenance of a public information system (CA, LAs); Production of reports for the Commission (CA). Evaluations of the technical and economic feasibility of achieving emission reductions to ensure cost-effectiveness.

Compliance costs The costs of achieving compliance by emitters of pollutants that cause exceedances of air quality limit values will probably be the major single cost of compliance. –To be borne by the polluters themselves (industry, householders, motorists etc). –This may require the polluter pays principle to be incorporated into national legislation. –Potential role for subsidies or other economic instruments to reallocate some of these costs to the taxpayer through the national government. –Plans should be made to maximise the mass of pollutant emission abated per euro invested, except where local pollution problems are of prime importance. The costs of reporting, providing information and consulting are likely to be comparatively low. –Mainly incurred by the competent authority and possibly also by local authorities, depending on exact arrangements for monitoring and assessment. –Potential cost savings by using efficient reporting methods Compliance costs can also involve: –Modifying fuels (e.g. cleaner fuels for transport, industrial plants) –Modifications to stationary sources (public sources and private sources including power plants, waste treatment facilities, production plants) Costs are relatively HIGH

Some costs related to Directive 2008/50 1.Increased costs: Quality assurance is more formalised and stricter enforcement needed, (examples of quality assurance related expences: reference laboratory, regulations and recommendations) Costs for implementing PM2.5 values – local, regional and national costs 2.Decreased costs: Increased focus on calculations/modelling of concentrations - partly off-set monitoring stations (reduce the number of monitoring stations)

Examples from Member States - UK 2007 Air Quality Strategy for England, Scotland, Wales and Northern Ireland Interdepartmental Group on Costs and Benefits (IGCB) responsible for the formal economic analysis of air quality policy Result: „Economic Analysis” detailing assessments of the additional policy measures set out in the strategy: –monetary cost benefit analysis; –quantified impacts on current air quality objectives and ecosystems; and –qualitative assessments such as the effect on noise levels, socio- economic outcomes and competition effects. One conclusion: the ex-post implementation costs have been less than the predicted costs ex-ante due: –uncertainities in assessing costs –regulation can spur innovation and that the ex-ante CBA may not adequately predict the impact of innovation on costs

Examples for MS – UK (2) 1.Assessment of benefits should be based on CBA –should also cover all impacts (e.g. exceedences of current limit values, ecosystem effects) 2.The benefits are then compared on a consistent basis with the costs associated with the implementation of each of the policy measures 3.There are good benefit to cost ratios for the air quality policies that have been implemented in at least two sectors (in this case electricty supply and transport)

Swedish estimated costs - adapting to new rules

Thank you for your attention! Miriam Markus-Johansson, Project Manager, REC Hungary