Engineering a sustainable future 1 ERCOT Voltage Ride-Through Study Workshop June 26 th, 2009.

Slides:



Advertisements
Similar presentations
New Energy Horizons Opportunities and Challenges Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25,
Advertisements

Allan Wick, CFE, CPP, PSP, PCI, CBCP Chief Security Officer WECC Joint Meeting October 8, 2014.
GPA Renewable Energy Resource for Guam Power Authority
Updated 1/28/2011. Technical Requirements & Regulatory Issues In Interconnection Agreements March 9, 2011 Jay Caspary ·
Why TADS Is Needed No systematic transmission outage data collection effort exists for all of North America Energy Information Administration data (Schedule.
ERCOT VRT Study, Phase I ERCOT ROS Meeting December 10, 2009.
Carol Chessmore Oncor 2013 DWG Vice Chair 2014 DWG Chair - Pending ROS Approval January 9, 2014 ERCOT ROS Meeting Austin, TX.
System Strength Discussion
Technical Advisory Committee December 6, 2010 Summary of the CREZ Reactive Study Warren Lasher Manager, Long-Term Planning and Policy.
1 New Resource Qualification Testing Sandip Sharma Supervisor, Operations Analysis New Generation Information Forum ERCOT Public November 4, 2014.
Generation Interconnection Overview
Resource Asset Registration Form Version 5.0 / 5.1 Changes for WGRs QMWG Presentation - July 9, 2012.
Audit & Compliance Tips Jagan Mandavilli Senior Compliance Engineer.
Woody Rickerson ROS/WMS Update June 2013 RARF Data Completion Project.
Determine Facility Ratings, SOLs and Transfer Capabilities Paul Johnson Chair of the Determine Facility Ratings Standard Drafting Team An Overview of the.
Server Virtualization: Navy Network Operations Centers
Houston Area Dynamic Reactive Project March 11,
Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment Srijib Mukherjee, Ph.D., P.E. UC Synergetic.
1 TSP Nodal Engagement Market Participant Call ERCOT August 04, 2010.
PROJECT NO PUCT STAFF WORKSHOP 11/19/14 Julia Harvey Kristi Denney Kevin Mathis Jasmin Thevaril.
RTWG Report to TAC August 5, 2010 Howard Daniels.
1 GENMAP Registration Workshop Jan 14, 2010.
November 10, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements.
April 23 rd OWG UFLS Survey & Power Factor Review.
QSE/RE Transmission Facilities Outage Coordination Workshop.
Lead from the front Texas Nodal 1 Resource Entity Owned Transmission Asset Data Collection Feb 27, 2009 Kick Off Meeting.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
RARF Frequently Asked Questions from Resource Entities Ed Geer RARF Workshop III 8/29/2013.
RPG Meeting Five Year Plan Extension Brad Schwarz.
Status Report for Critical Infrastructure Protection Advisory Group
Lead from the front Texas Nodal 1 Registration Market Call Apr 10, 2009.
Lead from the front Texas Nodal 1 Registration Market Call Mar 13, 2009.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
Art Deller ROS/WMS Update October 2013 RARF Data Completion Project.
VRT Study Update José Conto ERCOT System Planning.
Bill Lewis, Compliance Team Lead NERC Reliability Working Group May 16, 2013 Texas RE Update Talk with Texas RE April 25, 2013.
NPRR425 - Creation of a WGR Group for GREDP and Base Point Deviation Evaluation and Mixing Turbine Types Within a WGR Art Deller, P.E. RARF Workshop 8/29/13.
Resource Asset Registration Form Version 5.1 Update July 12, 2012.
POWER SYSTEM PLANNING CHARTER AND PROCESSES UPDATES Presentation to TAC Sept 9, 2004 Transmission Services Ken Donohoo, Manager of System Planning
Woody Rickerson ROS/WMS Update August 2013 RARF Data Completion Project.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
Nodal ATF 1 Nodal Advisory Task Force Update for TAC September 2 nd, 2010.
Lead from the front Texas Nodal 1 Texas Nodal Registration Kick-off Meeting Matt Mereness June 6 th, 2007.
Overview Art Deller, P.E. Supervisor, Model Administration New Resource Workshop May 28, 2014.
Lead from the front Texas Nodal 1 Registration Market Call Mar 27, 2009.
1 Submitting a RARF Art Deller, P.E. Supervisor, Model Administration New Generation Workshop November 4, 2014.
Art Deller ROS/WMS Update November 2013 RARF Data Completion Project.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
Steady-State Working Group: Resource Modeling Discussion Wes Woitt September 27 th, 2011.
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
ERCOT PUBLIC November RPG Meeting RTP – Study Scope November 20, 2015.
Resource Registration Update Dana Showalter Patrick Coon March 4, 2008.
Texas Nodal 1 Nodal Operations Model Posting NATF Sep 29, 2009 Matt Mereness, ERCOT.
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
Transmission Services Report: North and West RPG Projects Bill Bojorquez TAC July 7, 2005.
Lead from the front Texas Nodal 1 Registration Market Call June Data Collection Window June 05, 2009.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
Voltage Control Brad Calhoun Consultant, Sr. Trainer Spring 2016.
Impact of not including proposed generators lacking RARF data in the planning models Planning Guide Section 6.9 Issues February 17, 2016.
October 15, 2012 PV & Storage Workshop ERCOT’s Interconnection Process John Adams Principal Engineer.
1 NPCC – A-2 Dr. Mayer Sasson Transmission Planning Consolidated Edison of New York June 1, 2006 Presented to the NYSRC-RRS.
August 11, 2008 TPTF Early Delivery Systems Status Daryl Cote.
RELIABILITY AND OPERATIONS SUBCOMMITTEE Report to TAC Austin, TX December 1, 2011 Kenneth A. Donohoo, P.E. Chairperson Oncor Electric Delivery Company.
Renewable Technology Working Group (RTWG) Report to TAC February 4, 2010 Henry Durrwachter.
PLWG Review 6.9 and the Interconnection process
Workshop Session 1: Overview
Workshop Session 1: Overview
National Institute of Wind Energy(NIWE)
Presentation transcript:

Engineering a sustainable future 1 ERCOT Voltage Ride-Through Study Workshop June 26 th, 2009

Engineering a sustainable future 2 Agenda  PB Introduction  VRT Study Scope  Data Requirement from Wind generator Owners  Data Requirement Schedule  Q&A

Engineering a sustainable future 3 Agenda  PB Introduction  VRT Study Scope  Data Requirement from Wind generator Owners  Data Requirement Schedule  Q&A

Engineering a sustainable future 4 PB – working with clients worldwide and meeting their needs for over 100 years Comprehensive project management services and technical excellence - helping clients deliver sustainable solutions

PB Power Worldwide Capabilities Boston San Francisco Kuwait / UAE Singapore Newcastle Major Power Technical Centers Dallas / Houston Wellington/Auckland Manchester / Godalming New York Brisbane Global expertise - local understanding

Engineering a sustainable future 6 VRT Study Team Mandhir Sahni, PhD Yunzhi Cheng Project Manager Sunil Talati, P.E. Phase I Mandhir Sahni, PhD Yunzhi Cheng Phase III Lloyd Pasley Phase II ERCOT Project Managers John Schmall, P.E. José Conto QA/QC Jeyant Tamby, PhD-Sungard Principal-In-Charge Eric C. Swensen, P.E. Other Support Staff

Engineering a sustainable future 7 ERCOT WGRs PB Communication Protocols For Data Collection Only

Engineering a sustainable future 8 NDAs ERCOT WGRs PB Equipment Manufactures PB will share data with ERCOT PB’s Standard NDA

Engineering a sustainable future 9 Agenda  PB Introduction  VRT Study Scope  Data Requirement from Wind generator Owners  Data Requirement Schedule  Q&A

Engineering a sustainable future 10 VRT Study Overview Determine if there are any system reliability risks associated with existing wind plants (with an IA signed prior to November 1, 2008) that do not comply with ERCOT VRT requirements

Engineering a sustainable future 11 VRT Study Overview  Phase I  Dynamic simulations utilizing existing ERCOT model data set  High wind – High load  High wind – Low load  Phase II  Verify wind plant modeling and develop model improvements as necessary  Phase III  Dynamic simulations utilizing updated models based on model verification  Test sensitivities and mitigation as necessary

Engineering a sustainable future 12 Project Schedule  Phase I  Completion by September 2009  Phase II  Completion by December 2009  Phase III  Completion by April 2010 VRT Study Overview

Engineering a sustainable future 13 Phase I Study Cases  System Topology  SSWG 2009 DSA Fall Cases  ~9400 MW Wind Capacity  High Wind – High Load Scenario  ~58000 MW ERCOT System Load  ~4800 MW Wind Output (West Texas)  N-1 Security Constrained Generation Dispatch  High Wind – Low Load Scenario  ~36000 MW ERCOT System Load  ~4300 MW Wind Output (West Texas)  N-1 Security Constrained Generation Dispatch

Engineering a sustainable future 14 Contingency Selection It is necessary to select a limited set of contingencies for dynamic simulation  Single Line/Double Circuit Contingencies  Three-Phase Faults with Normal Clearing  Single-Phase Faults with Delayed Clearing (Breaker Failure)

Engineering a sustainable future 15 Contingency Selection  Contingency Selection Process  Fault Analysis  Identify fault locations that cause the greatest voltage drop at wind plant POIs  AC Contingency Analysis  Identify contingencies that result in the lowest post-contingency voltages  Identify contingencies that result in the greatest decrease in voltage  PV Analysis  Identify contingencies that are most critical with respect to voltage stability  West Texas export transfer scenarios

Engineering a sustainable future 16 Wind Plant Model Verification Network Additions Collector System Equivalent Pad-Mounted Transformer Equivalent Shunt Devices & Control Schemes

Engineering a sustainable future 17 Phase II Process PB Will Collect Modeling Data Directly From Wind Plant Owners  Model Development for ALL Wind Plants  Wind Plant Model Will Require Some Form of Owner “Approval”

Engineering a sustainable future 18 Phase III Process Perform Dynamic Simulations Utilizing Enhanced Wind Plant Models  Evaluate Up To Six Additional Scenarios  Variation in generation dispatch (conventional and/or wind)?  VRT capability added to wind plants?  Addition of reactive resources?  Variation in the load model?  Scenario Selection Dependent on Initial Simulation Results

Engineering a sustainable future 19 Agenda  PB Introduction  VRT Study Scope  Data Requirement from WGRs  Data Requirement Schedule  Q&A

Engineering a sustainable future 20 Phase II Steps  Step 1 – Build Consensus  Data Request Forms (DRF) approval from ERCOT and TSPs  Sign confidentiality agreements with equipment vendors and WGRs  Step 2 – Conduct Workshop  Conduct Workshop with WGRs  Step 3 - Collect and Validate data submitted by WGRs  Existing WGR models for operating units  WGR models for planned units  Step 4 – Prepare Equivalent Circuit for individual WGR units

Engineering a sustainable future 21 Phase II Scope  Limited to ALL WGRs with an IA signed prior to Nov 1, 2008 Limited to ALL WGRs with an IA signed prior to Nov 1, 2008  Accurate and complete data submittal is essential  Source of information:  ERCOT Wind Data Forms and Models – information submitted during the interconnection study phase  Resource Asset Registration Forms (RARF)  LVRT Status Survey  Design / Construction documents

Engineering a sustainable future 22 General Information  Submittal Information  Date format shall be MM/DD/YYYY  Resource Entity name must match ERCOT’s record  Resource Entity Authorized Representative  As registered with ERCOT  Responsible for submission of RARF to ERCOT  Primary Contact / Technical Contact  Site or facility contact for Generation Resources  May be Authorized Representative Provide your contact information by Monday, June 29 th, 2009.

Engineering a sustainable future 23 Facility One Line Diagram TSP Substation Data Transmission Line Data Relaying and Protection Scheme Transformer Data Collector System Substation Data Collector System Data

Engineering a sustainable future 24 Collection System Diagram UG Cable Layout & Size Turbine Location, Type and Size

Engineering a sustainable future 25 Collection System Data

Engineering a sustainable future 26 Collection System Data

Engineering a sustainable future 27 Updated Data Forms Provide comments on the attached data forms by Thursday, July 2 nd, 2009.

Engineering a sustainable future 28 Agenda  PB Introduction  VRT Study Scope and Challenges  Data Requirement from WGRs  Data Requirement Schedule  Q&A

Engineering a sustainable future 29 Data Requirement Schedule  WGRs to provide completed General Information form by Monday June 29 th,  WGRs to provide comments on VRT Data Request Forms by COB Thursday, July 2 nd,  PB will submit updated VRT Data Request Forms to WGRs by COB Friday, July 10 th,  WGRs to submit completed VRT Data Request Forms by COB Friday July 31 st, 2009.

Engineering a sustainable future 30 PB Contact Information Sunil Talati PB Power 2777 Stemmons Freeway Suite 1520 Dallas, TX Ph Cell

PB Team