Graham Beck, LBL September 2012 1 Stave Core (“Plank”) Thermal QA - UK Motivation for Thermal QA: Building 24 modules to populate a plank costs a lot of.

Slides:



Advertisements
Similar presentations
FEA Course Lecture V – Outline
Advertisements

Measurement of Radiation - Solar radiation - Long wave radiation - Net radiation - Exposure of radiation sensors.
Conduction, Convection, & Radiation
1 Thermography of Buildings Stacey Ward - BSRIA Instrument Solutions - - Sales Manager -
HEAT ENERGY (and the three ways it moves) Tahoma Jr. High 8 th Grade Science Maple Valley, WA.
Thermal Analysis of short bake out jacket version 1 12-Nov-2013.
M. Yoda, S. I. Abdel-Khalik, D. L. Sadowski and M. D. Hageman Woodruff School of Mechanical Engineering Extrapolating Experimental Results for Model Divertor.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
Module mounting Ian Wilmut (RAL). Martin Gibson Martin has been developing the module mounting system at RAL for the last two years – everything we have.
IBL temperature analyses Bart Verlaat 22 April
CO2 cooling pressure drop measurements R. Bates, R. French, G. Viehhauser, S. McMahon.
Coolant Performance (re thermal tests) Graham Beck WP4 25 Sept R.Bennett: Water + 40% Glycol at -20C, 1 litre/min, 1/8” pipe: htc = 658 W/m.
? ? ? ? ? ?.  3 POINT BENDING TEST :  Varying loads and spans  Variables measured in the gravity center:  Deflections with vision machine  Strains.
S Temple CLRC1 End-cap Mechanics FDR Cooling Structures Steve Temple, RAL 1 November 2001.
1 Calorimeter Thermal Analysis with Increased Heat Loads September 28, 2009.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Material calculation of petal core variants Sergio Díez Cornell with input from many people CERN AUW, 3 rd Nov 2014.
Raw Material & Sub-Assembly QA (Tim) 25/09/14 25/09/2014Material & Sub-assembly QA1.
Calorimeter Analysis Tasks, July 2014 Revision B January 22, 2015.
1 VI Single-wall Beam Pipe tests M.OlceseJ.Thadome (with the help of beam pipe group and Michel Bosteels’ cooling group) TMB July 18th 2002.
1 THERMAL CONDUCTIVITY OF SILICATE BONDED SAMPLES Status of measurements with the thermal conductivity facility in Firenze June, 7 th 2007.
Graham Beck 6 Feb Thermal QC Options for the Bare Stave/Petal Core This is about thermal QC, i.e. during production. Aims Primary: Verify that the.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
ATLAS Calorimeter Argon Gap Convection Test Bed Brian Cuerden 24 Apr
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
06-November-2013 Thermo-Mechanical Tests BE-RF-PM Review of the CLIC Two-Beam Module Program Thermo-Mechanical Tests L. Kortelainen, I. Kossyvakis, R.
1 ISAT Module III: Building Energy Efficiency Topic 7: Transient Heating and Air Conditioning Loads  Thermal Admittance  Intermittent Heating 
Zeb Menle Norberto Ríos Alexander Santiago 6/2/2016MECN 3974.
Low mass carbon based support structures for the HL-LHC ATLAS pixel forward disks R. Bates* a, C. Buttar a, I. Bonad a, F. McEwan a, L. Cunningham a, S.
MICE CC Test Status Ruben Carcagno 11/06/13 1. Cooldown Coil Temperature (calculated average in each of 8 coil segments) SC Transition (voltages across.
VG1 i T i March 9, 2006 W. O. Miller ATLAS Silicon Tracker Upgrade Upgrade Stave Study Topics Current Analysis Tasks –Stave Stiffness, ability to resist.
One-Dimensional Steady-State Conduction
Thermo-mechanical activities at Valencia V. Castillo, C. Lacasta, A. Oyanguren, P. Ruiz 8 th International Workshop on DEPFET Detectors and applications.
ATLAS Calorimeter Argon Gap Convection Test Bed April 25,
Module mounting. Status Stave 250 received… damaged – Repair now complete (see extras) Friday at 8:30 it will be collected by RAL driver and transported.
A thermo-mechanical petal Sergio Díez Cornell Petal discussion, 24 Oct 2014.
Summary of Winding Pack Thermal Results K. Freudenberg
Introduction to Thermal Radiation and Radiation Heat Transfer.
Hybrid panel heated plate study Currently the curing of the ASIC glue for the hybrid panels are done at room temperature. This is a study to determine.
1 VI Single-wall Beam Pipe Option: status and plans M.Olcese TMB June 6th 2002.
1 Monophase Measurements on Prototype Pixel Structures D. Bintinger, M. Gilchriese, J. Taylor and J. Wirth and contributions from D. Cragg, E. Perrin and.
QA: BNL Measurements D. Lynn (BNL), LBNL Mechanical Meeting, Sep
Graham Beck 23 Jan Thermal QA Options for the Bare Stave (or Petal) Core ! This is about the production phase. ! Test Systems should be ~ identical.
Green House Effect and Global Warming. Do you believe that the planet is warming? 1.Yes 2.No.
Stave production.
Report on testing Snake2 u-channel. P. Jalocha & J. Buytaert. 8 June 2015.
A hollow stave Ian Wilmut – August LBL stave At the March UG week LBL showed a prototype asymmetric stave. This prompted consideration of the strip.
WP4 Liverpool 21 June 2012 Graham Beck 1 Summary/Update of Steady State FEA: Perfect Plank and Plank with a small fault. New: Simulation of Transient behaviour.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
Thermo-mechanical petals Volker Prahl, Sergio Díez, on behalf of the petal community CERN AUW, 3 rd Nov 2014.
STEADY HEAT CONDUCTION IN PLANE WALLS, Ch.3
A two-stage system for the future cooling system.
1 Disk Sectors Integrated support and cooling for disk modules. Each sector has 6 modules Number of sectors is 2x9+4x8=50. Fabrication of all sectors in.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
TS Cool Down Studies TSu Unit Coils (24-25) N. Dhanaraj and E. Voirin Tuesday, 10 March 2015 Reference: Docdb No:
Damian Luna Yetziel Sandoval – Alberto Gonzales – 80546
Use of Air Showers to Reduce Soaking Time for High Precision Dimensional Measurements Ted Doiron, Donna McLaughlin, Ann Schneider Engineering Metrology.
Task 5: Test / Shipping Status Report. Overview  Where are we  Chamber  Stavelet holder frame  Module mounting frame  What next QMUL Sept 10.
Graham Beck (QMUL) LBNL Sept Berlin, March 2013: FEA of Side-Mounted Card + Straight Cooling Pipe (not wiggled through SMC region): For adequate.
Liverpool March 09 Irradiation Meeting. Graham Beck (QMUL) 1 Dissipated Power: Sensor (at -10C, 200V bias, after protons/cm 2 ) ~ 1W (×3 for.
Anti project. F. Raffaelli. INFN CERN, April 05 th, Thermal Analysis of the Anti transportation. -Calculation of the manhole loads due to the valve.
What is Stave Carrier Frame Required to Do?
THERMAL LOADING OF BUILDINGS
Are there better ways to build a stave?
Equipment for Assembly – UK Experiences
The Stave Thermo-Conductivity QC Procedure Idea
Earth’s Energy Budget.
Overview of Temperature Measurement ME 115
Tests on a dummy facet of PIX upgrade using CO2 cooling
Presentation transcript:

Graham Beck, LBL September Stave Core (“Plank”) Thermal QA - UK Motivation for Thermal QA: Building 24 modules to populate a plank costs a lot of effort and money (1 stave ≡ 40 transatlantic return flights*) => We should test the plank thoroughly (within reason). If it looks good and behaves well mechanically, it will probably be ok thermally. (?) But of course you can’t see inside it. Maybe you want to do some of: - Thermal QA of every plank (had better be fast: ~ 2h per plank?)….. the first few …. a selected sample - Check out thermally: irradiated / thermally cycled / otherwise stressed …planks Infrared Thermography (of the surface) is worth ~ 10 5 individual contact measurements. Is it feasible? (have had useful discussion with Dave L). * “only 3 if you travel First Class” (Adrian Bevan)

Graham Beck, LBL September IR Thermography At low T: -30C black body radiation intensity is still appreciable: ~ 40% room temperature level. The peak is well within the LWIR window, commonly used by the cheaper IR cameras * (e.g. QMUL, Liverpool)! Energy Balance + Kirchoff says that: emissivity + reflectivity + transmissivity = 1. =>Thermography works best on high emissivity surfaces: - Bigger signal - Lower reflected ambient radiation (inc. camera!) * Nowadays you can buy a radiometric IR camera for ~ 4 transatlantic flights (10% of a stave). The (default) plank surface is 25  m Kapton over (refective) Aluminium shield (if present). Kapton is somewhat transmissive. For bus tape  I measure ~ 90% (above room temperature); DaveL measures ~83% at low T (-25C?).  Expect plank thermography can work.  Sensitivity to faults will depend on the “noise” due to surface quality – uniformity, flatness etc.  Even if the bus gets buried (?) there should be an electrically insulating (so high  ) surface.

Graham Beck, LBL September How would you make a measurement? Flow coolant through the pipe, at ~ -30C. Actively heat the plank? It turns out that natural convection and radiation from ambient supplies about the right thermal load. Rough estimates: Convection: Assume htc = 5W/m 2 K (consistent w. R.Bennett calculations and Geneva experiments). (ignore dependence on plank orientation here). Radiation: W/A = .  * (T 4 – Ta 4 ) A=Area, Stefan’s constant  = 5.67E-8,  =emissivity: assume = 1 ≈ 4 .T mean 3 *  T ; (  T << T) i.e. (linear approx). Radiative htc ≈ 4 .T mean 3 e.g. +20C (ambient) => -25C (T mean ≈ 270K) => 4.5 W/m 2 K - very comparable to convection! Ambient load per module length of plank: ≈ 125 mm × 98mm × ~ 10 W/m 2 K × 45C => 5.5W ≈ Hybrid Power.

Graham Beck, LBL September FEA Thermal Model of a section of plank Quick & Dirty: Stave130 Module FEA with sensors+hybrids stripped away. Fast and informative … not particularly accurate ! Same htc top & bottom (clearly inaccurate) Cable Bus top and bottom 2mm id Ti pipe. Material Specific Heats assigned (used in transient case) - but Facing Glue Cv omitted. - Corresponds rather roughly to Tim’s planklet measurement : +20C, 10 W/m 2 K Surface Film Load

Graham Beck, LBL September PERFECT PLANK in STEADY STATE: comparison with Tim’s IR plot. After a couple of iterations to tie down CO2 temperature (approx C) (FEA Ambient Thermal Load now ~ 6.5W). ABAQUS FEA Tim’s IR (Stavelet3+masking tape) & Fit -32 ° C -25°C - °C Scale: Abaqus  T looks ~ 14% low. => Some confidence in FEA feasibility studies …

Graham Beck, LBL September Now introduce a FAULT into the FEA model: GLUE missing between the foam and pipe Effect on STAVE (module) performance: Mean T C Headroom Sensor T (degrees) Baseline, No faults C21.6 Missing from one pipe, top half,  Z 10mm " " "  Z 30mm " FULL circumference, 30mm  Choose as a benchmark test: glue missing over 30mm length, half the pipe circumference.  Has only a small effect on STAVE thermal performance (heat spreads around the fault)  Maybe you would want to know about it anyway. It might deteriorate with thermal cycling, etc.

Graham Beck, LBL September PLANK FEA: GLUE FAULT (STEADY STATE) Plotted bands: -32C=> -36C 0.2C intervals (~ camera resolution) Height of bump is 0.7C (top surface - also 0.4C bump on bottom surface) Would this be visible in practice? - depends on “noise”: bus surface flatness, uniformity, convective fluctuations etc.

Graham Beck, LBL September Tim, re Thermal Shock: “What is the typical dT/dt seen during Stavelet Testing with CO2?” Now look at Transient behaviour … Stavelet 3: IR temperature history of two points on the surface, above the pipes, after turning on CO2 (later turning off / back on again) At SP02 (above inlet pipe) T falls ~ 7C/s after turning on CO2… CO2 flows around U-bend, and reaches SP01 after ~43s => speed ~ 12mm/s. -meanwhile, outlet (SP01) is cooled, slowly, by conduction across the plank. (Interesting? ~simultaneous warming when flow stopped). Try to reproduce this in FEA - then assess potential for fault finding...

Graham Beck, LBL September Transient FEA… Sledgehammer approach: -Divide pipe surface (crudely!) into 8 x 12.25mm lengths along Z -Transient FEA 1s increments: -Change film conditions for successive sections ( ≡ 12.25mm/s) from +20C, 10W/m 2 K => -38.5C, 8000W/m 2 K. -Apply this to inlet pipe. -After 43s, apply (in reverse sense) to outlet pipe -Allow to settle (a further 43s). (See Perfect Plank Transient.wmv: !Range is +20C to -40C) Propagate change from Ambient to CO2 conditions in 1s steps => Plot history of surface T above centre of each pipe (as Tim)

Graham Beck, LBL September PERFECT PLANK: Surface Temperature transient. FEA doesn’t reproduce all features of IR, and peak dT/dt is 70% higher But worth pursuing … IR: Rate [C/s] vs time T vs time FEA:

Graham Beck, LBL September FEA TRANSIENT – with and without GLUE FAULT PERFECT Rate [C/s] vs time FAULTY (see Faulty Plank Transient.wmv Range: 0C to -40C) Peak Rate is unchanged on inlet side (~11C/s), but ~25% lower over centre of fault. T vs time

Graham Beck, LBL September A Trivial QA Algorithm: Define lines L1,L2 on the surface above the pipes. Record T on L1, L2 for duration of test (this would be ~ 5 mins for a full stave) For each Z, evaluate dT/dt(t). Plot Peak dT/dt vs Z. Look for anomalies (bumps) The plots are derived in this way from the FEA Temperatures at 2x20 nodes along the bus tape. [Fluctuations due to jerky FEA! Ignore Z extremes – wrong BCs!] => Inlet behaviour is fairly level... => Outlet shows expected bump due to fault. So there is an appreciable signal !!...BUT there will be background conduction from ± Z...and what is the noise like in practice??? Many Questions: Best answered by experiment!

Graham Beck, LBL September Vaporiser (Heater) Alternative (avoiding thermal feedback) - FLOW routed through independent chiller bath - RETURN from stave routed directly to Vaporiser Dial + DAQ. (Re-locate upstream of vaporiser) T1T2 T3 T4 T5 Tn located as per Nikhef Manual. T4 redundant if HEX omitted. T5 could be un-monitored/low precision. T1,T2,T3: 4-wire PT100? (expensive but accurate). OR Pico 8-chan. Thermocouples (incs. Labview) (Poss.re-locate second valve). CYLINDER STAVE QMUL will build a CO2 blow-off cooling system to evaluate these QA ideas (so far have a list of parts to purchase – but need a decision on temperature monitoring)...and I believe Oxford are building an intentionally “faulty” stave.

Graham Beck, LBL September BACKUP: Measurement of IR Emissivity of Bus Tape Bus sample + thermal grease on (warmed) block of copper. Black tape added (v. small correction to T, estimated by adding more layers). Spot radiometer measures T of tape and bus: Bus  estimated assuming 94% for black tape.  seems high – as hoped. Note: Kapton thickness is 25  m, cf radiometer sensitive in 8-13  m window. At low temperature (-25C?), Dave Lynn finds ~ 83%. coverlayer bus tape