Background Info - The state of the campus telecommunications infrastructure in December 2001.

Slides:



Advertisements
Similar presentations
How to Set Up, Secure and Manage A Network
Advertisements

Chapter 1: Introduction to Scaling Networks
M A Wajid Tanveer Infrastructure M A Wajid Tanveer
Chapter 3: Planning a Network Upgrade
Antonio González Torres
What is E-rate? Program designed in 1996 to overcome the “digital divide” Designed to narrow Internet access gap between affluent and non-affluent school.
Unit 5 Terminology Study Assignment Review Computer Technology
Broadband and Wide Area Network Services Carrier Gigabit Ethernet Multi Protocol Label Switching Vs. IP VPNs T-1 & T-3 SIP Trunks Security Network Topology.
Relocation of the Operations Control Center Oil Movements May 4, 2007 For RCAC Board Meeting.
CIT 470: Advanced Network and System Administration
Module CSY3021 Network Planning and Programming RD-CSY /09 1.
Threaded Case Study - RE Miller (Nick Effler, Brian Ford, Cindy Coultas & Teresa Duchardt) April-May, 2000 b Project Goals Implement WAN Access to connect.
WAN Connectivity The VMO Wide Area Network will extend between all stores, offices, and Lyon, France We have designed a highly redundant network with.
Chapter 1: Computer Networks IB 300: Advanced Computer Sciences. Professor: Nabil Elmjati.
CCSE NETWORK STRUCTURE. CCSE NETWORK OUTLINE Mid-sized Building Network spanning over Building 22 and Building 23. Autonomous from ITC’s KFUPM Domain.
1 13-Jun-15 S Ward Abingdon and Witney College LAN design CCNA Exploration Semester 3 Chapter 1.
RIT Campus Data Network. General Network Statistics Over 23,000 wired outlets Over 14,500 active switched ethernet ports > 250 network closets > 1,000.
ROYAL PALM NETWORK PROJECT John Healy Tom Jamieson
1 CCNA 3 v3.1 Module 5. 2 CCNA 3 Module 5 Switches/LAN Design.
1 25\10\2010 Unit-V Connecting LANs Unit – 5 Connecting DevicesConnecting Devices Backbone NetworksBackbone Networks Virtual LANsVirtual LANs.
Campus Networking Best Practices Session 2: Layer 3 Dale Smith University of Oregon & NSRC
© 2007 Cisco Systems, Inc. All rights reserved.ICND1 v1.0—2-1 Module Summary  Ethernet cables and segments can span only a limited physical distance,
Mr. Mark Welton.  Good documentation is key in a network design  Well-written documentation saves both time and money  Makes troubleshooting issues.
ITGS Networks Based on the textbook “Information Technology in a Global Society for the IB Diploma” by Stuart Gray.
Chassis Architecture Brandon Wagner Office of Information Technology
Sarkis Mkoyan *Yerevan Physics Institute. 2 Alikhanyan Brothers St., YerPhI Network Overview.
Chapter 5 Networks Communicating and Sharing Resources
1 October 20-24, 2014 Georgian Technical University PhD Zaza Tsiramua Head of computer network management center of GTU South-Caucasus Grid.
SCHOOLS AND LIBRARIES PROGRAM OF THE UNIVERSAL SERVICE FUND E-Rate.
Networks Computer Technology. Network A computer network, or simply a network, is a collection of computers and other hardware components interconnected.
OSI Model CS363-Winter 1999 DePaul University. Group Project Info Teams formed and on the web Cases Working in Groups Last half of class tonight reserved.
DECS Community IT DIVISION OF ENGINEERING COMPUTING SERVICES Michigan State University College of Engineering.
ACM 511 Chapter 2. Communication Communicating the Messages The best approach is to divide the data into smaller, more manageable pieces to send over.
Computers Are Your Future Tenth Edition Chapter 8: Networks: Communicating & Sharing Resources Copyright © 2009 Pearson Education, Inc. Publishing as Prentice.
1. 1. Overview: Telecommunications Project  Planning and implementation (2007-today) 2. Discussion: Proposal to Improve Infrastructure  Upgrade horizontal.
Repeaters and Hubs Repeaters: simplest type of connectivity devices that regenerate a digital signal Operate in Physical layer Cannot improve or correct.
LAN Design of a Local High School Martin Kucek Chris C. Yu Sandy Ramirez Cisco TCS Project – Semester 3 © 2001 Martin Kucek / Chris C. Yu / Sandy Ramirez.
1 Second ATLAS-South Caucasus Software / Computing Workshop & Tutorial October 24, 2012 Georgian Technical University PhD Zaza Tsiramua Head of computer.
LAN Switching and Wireless – Chapter 1
1 LAN design- Chapter 1 CCNA Exploration Semester 3 Modified by Profs. Ward and Cappellino.
Threaded Case Study for Phoenix, AZ. School District Sunny Slope & Sunset Elementary present by Todd Thousand, Bill Siepel, and Jeff Moore.
Sysops Network Training by Brett Haffener. Introductions - Name - School - What are you most interested in learning about?
LAN Switching and Wireless – Chapter 1 Vilina Hutter, Instructor
Networking Components Daniel Rosser LTEC Network Hub It is very difficult to find Hubs anymore Hubs sends data from one computer to all other computers.
VolNet2 Bill White Network Services. September 20, 2004OIT Fall Staff Meeting Why Volnet2? Based on the Security Assessment findings Insecure protocols.
© 2008 Cisco Systems, Inc. All rights reserved.Cisco ConfidentialPresentation_ID 1 Chapter 1: Introduction to Scaling Networks Scaling Networks.
© 2008 Cisco Systems, Inc. All rights reserved.Cisco ConfidentialPresentation_ID 1 Chapter 1: Introduction to Scaling Networks Scaling Networks.
Washington School District Project. General Requirements: Functional =7-10 Years 100X Growth in LAN 2X Growth in WAN 10X Growth in Internet Connectivity.
Cisco 3 - Switch Perrine. J Page 111/6/2015 Chapter 5 At which layer of the 3-layer design component would users with common interests be grouped? 1.Access.
Reference :Understanding Computers
LAN Design Semester 3, Chapter 3. Home End Table of Contents Go There! Go There! Go There! Go There! Go There! Go There! Go There! Go There! Go There!
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.1 Planning a Network Upgrade Working at a Small-to-Medium Business or ISP – Chapter.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 Help Desk Working at a Small-to-Medium Business or ISP – Chapter 2.
Advanced Computer Networks Lecturer: E EE Eng. Ahmed Hemaid Office: I 114.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 Communicating over the Network Network Fundamentals – Chapter 2.
Discovery 2 Internetworking Module 3 JEOPARDY K. Martin.
The Technical Network in brief Jean-Michel Jouanigot & all IT/CS.
NETWORK DEVICES RONALD SHERGA OCTOBER 13, 2015 LTEC 4550.
Network Move & Upgrade 2008 Les Cottrell SLAC for SCCS core services group Presented at the OU Admin Group Meeting August 21,
Best way to compare Cisco 2960S with 3650 Switch
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 Planning a Network Upgrade Working at a Small-to-Medium Business or.
Exploration 3 Chapter 1. Access layer The access layer interfaces with end devices, such as PCs, printers, and IP phones, to provide access to the rest.
Chapter-1 LAN Design. Introduction Hierarchical network When building a LAN that satisfies the needs of a small- or medium-sized business, your plan.
Strategy for Complex Networking, IT, & Telecommunication Decisions
IS3120 Network Communications Infrastructure
Computer Technology Notes #4
Virtual Private Network
Lecture6 Network Replacement
Networking and Telecommunications
Department of Digital Service & Open Government
Presentation transcript:

Background Info - The state of the campus telecommunications infrastructure in December 2001

Status in December Slow speed 10MBS connection to the desktop in offices and labs No connectivity in most classrooms Telephone switch and campus network router in small room in underground tunnel Data communications rooms shared with other functions, such as electrical equipment

Problems No physical room to expand telephone switch or network router Lack of controlled access to data and telephone equipment in shared rooms No space in conduits to pull in more cable to add network and telephone connections Performance/speed issues on some network segments Out of network ports on hubs in many buildings

Luckily, a solution was on the horizon - - a CSU system wide project to upgrade the campus data and telephone infrastructure

Telecommunications Infrastructure Project Bringing a 21 st Century Network Infrastructure to CSUDH

Project Overview Two stage, multi-phase project – –Stage I – construction of Network Control Center, new data communications rooms, pathways, and cable system. –Stage II – installation of network management software, cable inventory system, and upgraded network electronics (switches).

Project Summary Duration: Feb. 18, June 17, 2003 –extended through December 2003 Buildings were upgraded in phases, starting with the Student Health Center. Division coordinators/building captains were main point of contact between building occupants and project team.

Project Scope New Cat5e phone & data cable to all offices. New CISCO switches for included buildings. Gigabit ethernet on the backbone, 100Mbps to the desktop and each classroom. All classrooms have at least 2 data connections and a phone jack, and some will be set up for future wireless access to the network. Note: all old cable will be removed!

Project Scope continued Improved, dedicated communications rooms (IDFs, BDFs). Campus telephone switch and network router relocated to new facility that provides extended UPS capabilities, fire suppression, and room for growth. Generator provides power for 24 hours in the event of a major outage.

Project Implementation Most inside work was done between 10pm and 6am, so as not to disrupt campus operations. Outside construction occurred during the day (trenching, conduits, etc.) New network equipment (Stage 2) installed after a building was completely re-cabled. Cutover by building (to new data & telephone cable system).

Included Buildings Student Health Center ERC 1st floor, Theatre, LCH Gym, Field House, Hughes Center NSM, CP, PP, SBS, SOE SCC buildings SCC buildings 1-5

What about the other buildings? Welch Hall – meets specs – recent construction.. ERC floors will be remodeled in the future (buying new switches as funding permits). SAC 1,2,3 - older CISCO switches will be re- located from buildings covered by this project. USU - covered by building addition project. EAC - meets specs - recent “construction”.

Network Electronics Campus core switch - CISCO 6509 (replaces CISCO 8540 router) Building switches - CISCO 6509 or CISCO Within building switches - most are 24 or 48 port CISCO 2950s

CISCO Catalyst 6509 Enterprise/building switch Scalable platform 9-slot modular chassis, 1 slot reserved for supervisor engine Switching backplane - up to 32 Gbps Gigabit ethernet interface to other switches Supports up to /100 ethernet ports Routing capability (Layer 3)

CISCO Catalyst 4006 “Branch office”/building switch 6-slot modular chassis, 1 slot reserved for supervisor engine Supports up to /100 ports Layer 3 routing capability

CISCO Catalyst or 48 port fixed-configuration, stackable switch, 2 GBIC uplink ports Note - we are not stacking them - all will have a GBIC uplink to building switch/backbone connection MTBF prediction - 159,026 hours (in other words, they are very reliable)

Network Design No change in topology (star). Completely new parallel network. Temporary “bridge” between Cisco 8540 router and new Cisco 6509 core switch to tie old and new networks together until the end of the project.

Network Design (continued) All IDF switches will have “home run” fiber connection to BDF switch (no “daisy chains”). All BDF switches will connect back to core campus switch in ERC via Gigabit ethernet over fiber. Capability for redundant connections will be in place - will be implemented as funds are available.

More Network Design Info IP only protocol on new network - no IPX, DECNET, LAT, Appletalk, etc. Implementing private IP numbers - all XXX.XXX numbers will change to XXX.XXX.XXX.XXX. Network address translation will be done at the campus border firewall ( we are purchasing a 2nd firewall).

CAMPUS FIREWALL INTERNET (DHVX20.CSUDH.EDU) XX.XX.XX.XX (DHVX20 INTERNAL #)

Benefits to CSUDH Ability to deliver video and multimedia applications to classrooms and offices. Ability to support next generation applications such as Voice over IP, wireless technologies, and PeopleSoft Student Record system. Ability to rapidly adapt to changing technologies over the next few years.

More benefits A more reliable, easier to manage campus network that is ten times faster (100 Mbps vs 10Mbps). Ability to detect and respond to network problems in a timely manner.

And more …. Safer, more secure data communications rooms that meet standards. Support for additional telephone and network installations in new Network Control Center as buildings are added and services expanded.

Questions? Send comments to: Project website: