Atlas L1Calo CMX Card CMX is upgrade of CMM with higher capacity 1)Inputs from JEM or CPM modules – 40 → 160Mbps (400 signals) 2)Crate CMX to System CMX.

Slides:



Advertisements
Similar presentations
TileCal Optical Multiplexer Board 9U VME Prototype Cristobal Cuenca Almenar IFIC (Universitat de Valencia-CSIC)
Advertisements

Uli Schäfer JEM Status and Test Results Hardware status JEM0 Hardware status JEM1 RAL test results.
1 FTK Rear Transition Module Mircea Bogdan The University of Chicago November 11, 2014 Board Review.
C. Fernández Bedoya, A. Navarro, I. Redondo. C. Fernández Bedoya November 29th, Goal: Replace SC crate with simple CuOF electronics and place TSC.
Uli Schäfer JEM Status and plans Hardware status JEM0 Hardware status JEM1 Plans.
GOLD Generic Opto Link Demonstrator Uli Schäfer 1.
Programmable logic devices / tools Programmable logic devices are digital logic devices, providing combinatorial logic (gates, look-up tables) and flip-flops.
ATLAS L1 Calorimeter Trigger Upgrade - Uli Schäfer, MZ -
GOLD Status and Phase-1 Plans Andi E. & Uli S. Uli Schäfer 1.
Phase-0 topological processor Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
Level-1 Topology Processor for Phase 0/1 - Hardware Studies and Plans - Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
JEM upgrades and optical data transmission to FEX for Phase 1 Andi E. & Uli S. Uli Schäfer 1.
Uli Schäfer 1 (Not just) Backplane transmission options Upgrade will always be in 5 years time.
Uli Schäfer 1 Mainz L1Calo upgrade activities news – BLT hardware/firmware status.
Uli Schäfer JEM Plans Status (summary) Further standalone tests Sub-slice test programme JEM re-design Slice test.
Uli Schäfer JEM0 Status (summary) 3 JEM0s up and running: JEM0.0 used for standalone tests only (Mainz) JEM0.1 fully qualified module0 JEM0.2 (like JEM0.1.
Uli Schäfer 1 (Not just) Backplane transmission options.
S. Silverstein For ATLAS TDAQ Level-1 Trigger updates for Phase 1.
Uli Schäfer 1 (Not just) Backplane transmission options Uli, Sam, Yuri.
Uli Schäfer 1 CP/JEP backplane test module What’s the maximum data rate into the S-CMM for phase-1 upgrade ?
Uli Schäfer JEM hardware / test JEM0 test programme Mainz standalone RAL sub-slice test JEM re-design Heidelberg slice test.
S. Silverstein For ATLAS TDAQ Level-1 Trigger upgrade for Phase 1.
Uli Schäfer 1 JEM1: Status and plans power Jet Sum R S T U VME CC RM ACE CAN Flash TTC JEM1.0 status JEM1.1 Plans.
Uli Schäfer 1 (Not just) Backplane transmission options.
1 Design of the Front End Readout Board for TORCH Detector 10, June 2010.
Status and planning of the CMX Philippe Laurens for the MSU group Level-1 Calorimeter Trigger General Meeting, CERN May 24, 2012.
Lessons Learned The Hard Way: FPGA  PCB Integration Challenges Dave Brady & Bruce Riggins.
CMX (Common Merger eXtension module) Y. Ermoline for CMX collaboration Preliminary Design Review, Stockholm, 29 June 2011.
Topology System Uli Schäfer 1 B.Bauß, V.Büscher, W.Ji, U.Schäfer, A.Reiß, E.Simioni, S.Tapprogge, V.Wenzel.
L1Topo Status & Plans Uli Schäfer 1 B.Bauß, V.Büscher, W.Ji, S.Krause, S.Moritz, U.Schäfer, A.Reiß, E.Simioni, S.Tapprogge, V.Wenzel.
Evaluation of the Optical Link Card for the Phase II Upgrade of TileCal Detector F. Carrió 1, V. Castillo 2, A. Ferrer 2, V. González 1, E. Higón 2, C.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
Wilco Vink 1 Outline Optical station Vertex processor board Output board Latency.
CMX status Yuri Ermoline for the MSU group Mini-TDAQ week, CERN, 9-11 July 2012,
VME test card for VME/ACE/TTC interface for CMX Yuri Ermoline Level-1 Calorimeter Trigger General Meeting, CERN December 15, 2011.
Upgrade of the CSC Endcap Muon Port Card Mikhail Matveev Rice University 1 November 2011.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
DAQMB Production Status S. Durkin The Ohio State University Florida EMU Meeting 2004.
CMX Hardware Status Chip Brock, Dan Edmunds, Philippe Yuri Ermoline, Duc Bao Wojciech UBC Michigan State University 25-Oct-2013.
CMX Hardware Overview Chip Brock, Dan Edmunds, Philippe Yuri Wojciech Michigan State University 12-May-2014.
Ideas about Tests and Sequencing C.N.P.Gee Rutherford Appleton Laboratory 3rd March 2001.
ATLAS Trigger / current L1Calo Uli Schäfer 1 Jet/Energy module calo µ CTP L1.
Algorithms and TP Y. Ermoline et al. Level-1 Calorimeter Trigger Joint Meeting, Heidelberg, January 11-13, 2010.
CMX Hardware Overview Chip Brock, Dan Edmunds, Philippe Yuri Wojciech Michigan State University 19-May-2014.
Samuel Silverstein Stockholm University CMM++ firmware development Backplane formats (update) CMM++ firmware.
Hardware status GOLD Generic Opto Link Demonstrator Uli Schäfer 1.
CMX Collection file for current diagrams 30-Apr-2014.
17 December, 2010 ATLAS L1Calo upgrade meeting Meeting overview Recent hardware developments, ideas.
16 February 2011Ian Brawn1 The High Speed Demonstrator and Slice Demonstrator Programme The Proposed High-Speed Demonstrator –Overview –Design Methodology.
ATLAS SCT/Pixel TIM FDR/PRR28 June 2004 TIM Requirements - John Lane1 ATLAS SCT/Pixel TIM FDR/PRR 28 June 2004 Physics & Astronomy HEP Electronics John.
GOLD TESTS (Virtex-6) ● Jitter analysis on cleaned TTC clock ( σ = 2.9 ps) ● Signal integrity: sampled in several positions along the chain ● MGT and o/e.
Samuel Silverstein, SYSF ATLAS calorimeter trigger upgrade work Overview Upgrade to PreProcessor MCM Topological trigger.
CMX: Update on status and planning Yuri Ermoline, Wojciech Dan Edmunds, Philippe Laurens, Chip Michigan State University 7-Mar-2012.
Uli Schäfer 1 Mainz R&D activities. Uli Schäfer 2 MZ R&D BLT has been built and tested (backplane transmission only). A few minor issues were found. Possible.
Samuel Silverstein, Stockholm University For the ATLAS TDAQ collaboration The Digital Algorithm Processors for the ATLAS Level-1 Calorimeter Trigger.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
T. Gorski, et al., U. Wisconsin, April 28, 2010 SHLC RCT MicroTCA Development - 1 SLHC Cal Trigger Upgrade SLHC Regional Calorimeter Trigger MicroTCA Development.
HCAL DAQ Path Upgrades Current DCC Status New DCC Hardware Software
ATLAS calorimeter and topological trigger upgrades for Phase 1
L1Calo Phase-1 architechure
L1Calo upgrade discussion
Update on CSC Endcap Muon Port Card
A New Clock Distribution/Topology Processor Module for KOTO (CDT)
ECAL OD Electronic Workshop 7-8/04/2005
Run-2  Phase-1  Phase-2 Uli / Mainz
CMX Status and News - post PRR -
CMX scope and functionalities
(Not just) Backplane transmission options
CSC Muon Sorter Status Tests Plans M.Matveev August 21, 2003.
Presentation transcript:

Atlas L1Calo CMX Card CMX is upgrade of CMM with higher capacity 1)Inputs from JEM or CPM modules – 40 → 160Mbps (400 signals) 2)Crate CMX to System CMX Cable IO – 40 → 160Mbps (81 signals) 3)Output to CTP – 40 → 80Mbps (66 signals) 4)Bigger FPGA (Xilinx Virtex 6 VLX550T) – e.g. for additional thresholds Functionality new to CMX 1)Cluster information sent by each CMX to Topological Processor – Two 12-fiber ribbons of optical per fiber 2)Optional partial TP capability included – A Standalone TP is being built but some TP capability is still desirable on the CMX platform – Three 12-fiber ribbons of optical input per fiber – Separate Virtex 6 FPGA used for TP Functionality (optionally installed) Most CMX cards will be built without the TP FPGA installed MSU 29-Aug-2012

Atlas L1Calo CMX Card Main Data Path – Backplane Inputs, Cable IO and CTP Output all understood Maximized signal integrity Critical for 160Mbps bandwidth All critical signals between ground planes PCB trace layout optimized (no extra vias) Pin assigment verified for firmware routability 24-layer card – Working on details of Optical IO Ancillary Functions – Understanding Power issues Sizing power supplies Need to satisfy firmware requirements Investigating FPGA heat dissipation – Working on Clock Distribution All clocks and IOs are synchronized to TTC – Optimizing overall parts placement MSU 29-Aug-2012

Atlas L1Calo CMX Card VAT card: parallel effort and study platform VME/ACE/TTC (VAT) ancillary functions of CMX Redesign of CMM with new components Most ancillary functions fit in single Support FPGA Build a 6U VME test card Include a small Virtex 6 Practice firmware configuration via System ACE Test bed of operating environment for CMX Can start design of CMX control Software Lessons and details to be merged into CMX PCB done June 2012 Currently working on Firmware for VAT card Test Firmware for Virtex 6 FPGA Test Stand and software MSU 29-Aug-2012