1 LIGO-D1201231-V5 LLO Y-End CERY VEAY PVC – 6” x 10 PVC – 6” Cap ¾” QuickEdge 5/8” QuickEdge 6+” hole centered 24” up, 39” over.

Slides:



Advertisements
Similar presentations
1 LIGO-D V3 LLO X-End CERX VEAX PVC – 6 x 10 PVC – 6 Cap ¾ QuickEdge 5/8 QuickEdge 6+ hole centered 24 up, 39 over.
Advertisements

GSM Relay Controller. GSM Power Supply Voltage must be between 10 – 14vdc.
LIGO-G V8 1 aLIGO DC Power Distribution Contents.
1 LIGO-D V2 LLO X-End CERX VEAX PVC – 6” x 10 PVC – 6” Cap ¾” QuickEdge 5/8” QuickEdge 6+” hole centered 24” up, 39” over.
H2 Layout for EMU a brief report of a couple of visits by Darin A., Jay R., and FG.
E163: Laser Acceleration at the NLCTA Goal: Demonstrate the technical feasibility of laser-driven particle acceleration Photonic band gap structures made.
LIGO-G v2 Form F v1 Advanced LIGO1 PROVISION OF SPACE FOR LHO aLIGO OPLEV & PHOTCAL INSTALLATIONS Abstract: The purpose of this document.
Bridge Lighting & Bridge Protection Equipment Requirements.
Model 3000 Magnetic Lock 1500 lbs. Holding Force Fas-Trak Mounting System 12 or 24 VDC or VAC field selectable One Piece Housing Low Power Consumption.
Clean Air Box Usage & Care CABs RAMs CO Monitors.
BSC Cable Trays … again: Evaluation of an LLO Proposal for an Alternative Design G v31.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
What is Wireless Networking? Wireless Networking is simply – Transmitting data between devices using radio waves Broadcast Television Stations and Radio.
Q (Basic Laser Quizzes) 1 LIGO-G V3 LIGO (Laser) Safety Document Tree LIGO-M (LIGO Safety Program) LIGO-M (LIGO Laser Safety.
40m Suspension Electronics Benjamin Abbott California Institute of Technology 10/18/01 G R.
DAQ&CM Infrastructure Paul Drumm. Issue Space is running out! Power supplies, RF system –Big kit, legislation dictates space requirements (not a clear.
C. Lu, RPC System Installation Workshop, 6/11/2009, CUHK 1 1 RPC gas system installation (step by step plan) (CUHK, 6/11/2009) Changguo Lu, Kirk McDonald.
David Nelson STAVE Test Electronics July 21, ATLAS STAVE Test Results Version 1 David Nelson July 21, 2008.
Internal Seismic Isolation (ISC) Overview Report for the August CDS meeting Ben Abbott Caltech.
Mathematical Treasure hunt
Cable and Service Installation David Warner Colorado State University May 11, 2009.
Setup of laser tracker on DX side NOTE: X axis along M1s centers, towards SX Z axis along M1-M2 centers, towards M2.
:56 EasyPreparation without Barcode Reader.
1 Telecom Cabling Patch panels, cabinets and raised floors.
Without barcode reader :33. without barcode reader :33 2. Select „Easy preparation“. Click OK. 1. Start PrepGilsonST program.
“Move & leave” lens zoom and focus adjustment method. “Move & leave” lens zoom and focus adjustment method. Patent no.: Patent no.:
Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
Looking east to Park Street Old tennis court area, looking south.
1 Paging and distributed speaker system Start part ll Paging and distributed speaker system Start part ll BASIC TELECOMMUNICATIONS.
1 LIGO-G V5 LLO CDS Components Front End Computer Timing Master 18VDC18VDC I/O Extension Timing Fanout 24VDC24VDC Chassis DC Power AC VoltageAC.
Undulator Orientation & Electron Beam Spacing Should the undulator frames be toward the central aisle or the tunnel walls? What is the optimum spacing.
1 LIGO-G V2 LLO CDS Electronics Rack Naming Scheme CDS racks are named according to site, IFO designation, subsystem use, station (location) and.
E v3 aLIGO SEI Testing and Commissioning Overall Plan
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
Hall A DVCS calorimeter Operation Safety procedure September 18 th 2014 Alexandre Camsonne DVCS Readiness Review.
Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,
IRB Space Choice. Considerations Patient access – Most walking, some wheelchair – Access for ambulance stretcher – No line of sight to bench work (?)
1 System Design. 2 Primary Detection Secondary Detection Standards Pipe Design.
Move 2 racks G16-RR2-4 G16-RR2-3. G15-PP-01 CKT G15-PP-01 CKT G15-PP-01 CKT G15-PP-01 CKT 8 G15-PP-01 CKT Power Feed.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
NSTX Upgrade Test Cell Initial Schedule Vent vacuum vessel by 9/19 No vessel entry at this time Period of removals prior to start of outage: 9/19 – 10/14.
Stéphane Gabourin on behalf of TE/MPE-EP MPP Linac4 – 9 th July 2015 BIS installation in Linac4 For 50 MeV operation.
YETS activities in n_TOF O. Aberle, S. Montesano (EN/STI)
Glenn Lopez P0Dule Production Planning. Glenn Lopez Overview Eventually want a detailed procedure for P0Dule production Workspace layout is efficient.
Cabling Policy for KAGRA ISC Yuta Michimura Ando Group Department of Physics, University of Tokyo March 14, 2016.
Oscilloscopes. Objectives –After completing this chapter, the student should be able to: Explain the function of an oscilloscope. Identify the basic parts.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
Electronics Infrastructure Linda Bagby December 8-9, 2011.
Practical considerations for quad suspension upgrades Giles Hammond, Norna Robertson, Travis Sadecki, Brett Shapiro, Betsy Weaver G v3.
WORKBENCH WALL MOUNTED WALL MOUNTED OR FREE STANDING FREE STANDING SHOWN.
Power Monitoring – Requirements (1)
TOTEM Electronics Status
STRAW TRACKER SYSTEM CAD STATUS :
Environment. Waterfall.
Construction and Commissioning of Electronic Test Benches
Warm structure requirements :
Dimensioning Demo Let’s Dimension it Should we SIZE it?
XFEL Vacuum System Commissioning
Dimensioning Demo Let’s Dimension it Should we SIZE it?
RF and DC Cabling Policy for KAGRA ISC
We meet on Friday for registration around 6pm.
FIGURE 12-1 A Leyden jar can be used to store an electrical charge.
Electrons Thermionic Emission
Periodical meeting about the 'control system ‘
RF and DC Cabling Policy for KAGRA ISC
Estimating & Measuring Angles – Worksheet A
RE3/1 & RE4/1 Parameter Space Services
The Cathode Ray Oscilloscope
Presentation transcript:

1 LIGO-D V5 LLO Y-End CERY VEAY PVC – 6” x 10 PVC – 6” Cap ¾” QuickEdge 5/8” QuickEdge 6+” hole centered 24” up, 39” over

2 LIGO-D V5 VEAY LLO Existing Cable Piers Locations Corner Station  Cargo Door Reference (0)  Hole = 10.0 x 10.0 = 4.0 d Waterfall

Baskets Vertex BSC5 3 LIGO-D V5

LIGO-D V5 VEAY LLO Existing Cable Piers Locations Corner Station  Cargo Door Reference (0)  Hole = 10.0 x 10.0 = 4.0 d Waterfall VE Pump 26 x 56.5 VAC SUS ISCB5R 72 x 48 ISC

5 LIGO-D V5 VEAY Overlay Things that can be done: (Note: Green trace is new tray.) 1) Remove old cable tray and pier that interferes with dome parking. 2) Relocate existing piers to support cable tray to L1-SUS-YR1. 3) Locate L1-ISC-YR1 farther away from existing pier for clearance. 4) Suggest joining basket around BSC to existing cable tray at waterfall. 5) Add cable tray to reach L1-SUS-YR1. Questions and comments: 1) Where does 11U Short Rack (D v11) go? (Ignore) 2) Where does L1-AOS-YR1 (if it needs to exist) go? (Does not exist) 3) What does pentagon-2 mean regarding tray removal? Is there tray across the beam tube from L1-SUS-YR1? (Ignore) 4) Is the called-out 10’ height important for some reason? LLO height is 8’. (OK) 5) What are the double doors in the note all about? (Ignore) 6) A door is missing from the garb room to the VEA. (Ignore) 7) The doors are missing from the mechanical room. (Ignore) 8) L1-VAC-YR1 is missing. (Shown) 9) All cabling that currently uses under-beam tray and the waterfall is missing. (Kurt) 10) The Photon Calibrator is missing. (Mounted to tube – part of OPLEV) 11) VE Pumps are not shown. (Shown) 12) Size of ISCB5R is not specified. (72 x 48) Existing layoutNew layout

LIGO-D V5 6 CDS Electronics Room Y-End (CERY) Rack Layout CERY (L1-VDC-YC1)L1-VDC-YC1 (L1-VDC-YC2)L1-VDC-YC2 (L1-DAQ-YC1)L1-DAQ-YC1 (L1-SEI-YC1)L1-SEI-YC1 (L1-SUS-YC1)L1-SUS-YC1 (L1-SUS-YC2)L1-SUS-YC2 (L1-TCS-YC1)L1-TCS-YC1 (L1-FAC-YC1)L1-FAC-YC1 << Y-End Racks AC Power Signals and Fiber DC Power (L1-ISC-YC1)L1-ISC-YC1 It is 65’ from the L1-FAC-YC1 Rack to the knee of the waterfall in the VEAY. The height of the cable trays is 8’.

Suggested Phone Locations ( ) Radio Phone Phone Fire Alarm System 7 LIGO-D V5 << Y-End Racks

LIGO-D V5 8 Y-End << Y-End Racks