Giving Yourself Options – Using Oracle Assemble To Order (ATO) Bob Collins, CFPIM, CIRM SSI North America Chicago, IL August 15, 2003.

Slides:



Advertisements
Similar presentations
Managing Complexity While Meeting Customer Demand Bob White – CFO Encoder Products (EPC) Frank Feustel – Director Product Management, QAD Configure to.
Advertisements

Chapter 15 - Material & Capacity Requirements Planning(MRP/CRP)
Tara Plastics Business Process Planning Workshop Tara Plastics Business Process Planning Workshop Presented by: The Georgia Tech Center for Manufacturing.
EYYUP ORAK Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in.
QAD Configurator Gary Wasserman MaryAnn Guthrie 11-October-11.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Resource Planning Chapter 14.
Managing Production across the Supply Chain
Customer Self Service for Configured Products Hank Canitz – Sr. Dir Industry Marketing Midwest User Group Meeting.
5. Master Production Scheduling
Master Production Scheduling
Enterprise Business Processes and Applications (IS 6006) Masters in Business Information Systems 18 th Nov 2008 Fergal Carton Business Information Systems.
University of Southern California Enterprise Wide Information Systems Manufacturing Planning and Execution Instructor: Richard W. Vawter.
1 Manufacturing Processes BA 339 Mellie Pullman. 2 Process Choice & Layout.
Material Planning Process
21–1. 21–2 Chapter Twenty-One Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
MRP: MRP: Material Requirements Planning Manufacturing Resource Planning.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
| Building the Effective Enterprise Using a Web Storefront to Drive Sales of Configurable Products Frank Feustel – Director, Product Management, QAD Building.
Materials Management Systems
Production and supply chain process MIS2101: Management Information Systems Based on material developed by C.J. Marselis.
Manufacturing Planning and Control
McGraw-Hill/Irwin  The McGraw-Hill Companies, Inc. 2007, All Rights Reserved PROCESS SELECTION Chapter 4.
Aggregate Planning and Resource Planning Chapters 13 and 14.
Chapter 4. Chapter 4 Learning Objectives Describe steps in the production planning process of a high volume manufacturer like Fitter Snacker Describe.
Introduction to Materials Management
©2004 Deloitte Drop Shipment and Back to Back Order Processes in Oracle 11i July 19, 2004.
Vas SCT Model 1 © The Delos Partnership 2004 Supply Chain Techniques Choices to be made when deciding how to plan.
Operations Management Material Requirements Planning
Dependent demand lumpy MRP DETAILED SCHEDULE FOR RAW MATERIALS & COMPONENTS USED IN THE END PRODUCTS MASTER SCHEDULE FOR END ITEMS.
Material Requirements Planning
1 Materials Requirements Planning. 2 Material Requirements Planning Defined Materials requirements planning (MRP) is a means for determining the number.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1998 Material Requirements Planning (MRP) Chapter 15 11/7/05 Overview Position of MRP in Operation.
Lecture 9 Materials Requirements Planning Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,
© The McGraw-Hill Companies, Inc., Master scheduling Material requirements planning Order scheduling Weekly workforce and customer scheduling Daily.
MANGT 660 (A): Supply Chain Planning and Control Chapter 4 Master Production Scheduling (1/2)
© The Delos Partnership 2006 page 1 Supply Chain Techniques Choices to be made when deciding how to plan.
ERP Course: Production and Materials Management Reading: Chapter 6 from Mary Sumner Peter Dolog dolog [at] cs [dot] aau [dot] dk E2-201 Information Systems.
Chapter 7 Enterprise Resource Planning (ERP). Objectives After studying the chapter, students should be able to.. Explain definition of Enterprise Resource.
Aggregate Planning and Resource Planning Chapters 13 and 14.
Industry Goals. Increase Customer Satisfaction  On-Time, On-Budget, Within Scope  Ensure High Quality Delivery Increase Margins  Drive Efficiencies.
Materials Requirements Planning
Lecture 3 Production Planning System Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,
SYSPRO ERP for all Manufacturing Types and Processes
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
BUAD306 MRP.
Lecture 5 Master Product Scheduling Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College, Emeritus,
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Master Production Scheduling (MPS) Slide Set #9.
It is a complete O 2 C Presentation which will help you : To Overview Order Management complete process. TO describe the Order Management process flow.
1 ME Production Planning and Inventory Control.
MIS Topic # 2 1 Demand Management. MIS Topic # 2 2 Definitions: Demand Management: the function of recognizing and managing all demands for.
CH-8-Resource Planning Assist Prof Banu OZKESER December, 2015.
www. magnifictraining.com Oracle apps scm online training Online | Classroom | Corporate| Training | Certification | Placement.
Master Production Scheduling (MPS)
Material Requirements Planning (MRP)
Facility Inventory Old Facilities Modern Facilities Classroom Size
Introduction to Materials Management
Dynamics GP Manufacturing
Supply Chain Management Principles
BUAD306 MRP/ERP.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
Common Learning Blocks
Chapter 5 Master Production Scheduling
Version Control Master Data
CHAPTER 14 MRP and ERP.
Material Requirement Planning (MRP)
Introduction to Materials Management
Chapter 14 Dependent Demand
Materials Management Systems
Material Requirements Planning and Enterprise Resource Planning.
Presentation transcript:

Giving Yourself Options – Using Oracle Assemble To Order (ATO) Bob Collins, CFPIM, CIRM SSI North America Chicago, IL August 15, 2003

Agenda Why consider ATO? Advantages to ATO? Example of Oracle ATO

ATO – Assemble-to-Order A production environment where a good or service can be assembled after receipt of a customer’s order. The key components... used in the assembly or finishing process are planned and usually stocked in anticipation of a customer order. Receipt of an order initiates assembly of the customized product. This strategy is useful where a large number of end products (based on the selection of options and accessories) can be assembled from common components. - APICS Online Dictionary (10th Edition)

ATO Bills and... Modular Bills Planning Bills PTO Bills (Oracle) Hybrid Bills (Oracle)

Why consider ATO? Options make planning and stocking EVERY possible end item unrealistic to impossible Difference between customer delivery lead time vs. procurement and manufacturing lead time

Stock issue When options are considered, there may be hundreds of thousands of end items Potentially millions of dollars of inventory Many potential configurations are never ordered Space problems, maintenance issues

Lead Time issue Customer delivery lead time = 4 weeks Procure materials, fabricate and assemble – 28 weeks! Total Lead Time Customer Delivery Lead Time

MTS – MTO Total Lead Time Customer Delivery Lead Time MTS MTO Total Lead Time Customer Delivery Lead Time

ATO Total Lead Time Customer Delivery Lead Time Final Assembly Lead Time Subassembly Lead Time

Inventory Implications End Items Raw Materials Inventory Order placed MTSMTO

ATO and Inventory End Items Sub assemblies Raw Materials Order placed Inventory

Advantages to ATO Better response time Reduced costs Lower inventory Reduced number of master scheduled and forecast items Faster and fewer errors in order entry

Example: Computer Computer Options Processor (1 of 8) RAM (1 of 4) Modem (1 of 3) Optical Drive (1 of 6) Monitor (1 of 6) Speakers (1 of 3) Printers (1 of 7) Hard Drive (1 of 6) Graphics Card (1 of 5) Ethernet Card (1 of 3) Software package (1 of 5) 8 x 4 x 6 x 5 x 6 x 3 x 7 x 6 x 3 x 3 x 5 = 32,659,200 end items!

Maintenance Nightmare? 8 x 4 x 6 x 5 x 6 x 3 x 7 x 6 x 3 x 3 x 5 = 32,659,200 end items OR = 56 items at the option level ATO allows you to create fewer Bills!

More advantages Fewer Bills of Materials Less BOM maintenance More efficient order entry Forecast/plan at level below the end item Helps isolate opportunities for standardizing and changing the manufacturing process.

Example Pentium 4 Family Level 0ATO Model ProcessorsHard DrivesMonitors ATO Option Class GB2.1 GB 60 GB80 GB120 GB 17” Flat21” Super ATO Items Subassemblies Components

Planning Percentages

Planning Process 100 Pentium 4’s in September – GB processors – GB processors –20 60 GB Hard Drives –60 80 GB Hard Drives – GB Hard Drives –40 17” Flat Screen monitors –60 21” Super Screen monitors

Optional/Mutually Exclusive

Description[ ] Mutually Exclusive (default) [X] Mutually Exclusive [X] Optional Choose any number or no options on the option class bill Choose one or no options on the option class bill [ ] Optional (default) Choose at least one option on the option class bill Choose one, and only one, option on the option class bill

Configurator

When the order is placed, Order Entry picks the options the customer wants Rules to guide Order Entry Can reuse existing numbers if profile option is set

Configurator Rules E.g., Automotive Manufacturer –IF air conditioning ordered for vehicle –THEN must include tinted windshield

Configured Bill (*) Pentium 4 Family*1234 Level 0ATO Model ProcessorsHard DrivesMonitors ATO Option Class GB21” Super ATO Items Subassemblies Components GB

Creation of Configured Item Creation of configuration bill of material based on the model bill of material Creation of configuration routing based on the model routing Link the configuration item to the sale order

Creation of Configured Item Kick off the configuration item workflow process, which completes the following: –Lead time calculation for the configuration item (discrete manufacturing items only) –Supply Chain cost rollup for the configuration item

Affect on Forecast Forecast at the Model level, using planning percentages Configured items will consume the forecast for the Model

Want to try it? Metalink.oracle.com Flow for ATO Configuration Step-by-step instructions

Summary Oracle Applications supports ATO (and PTO & CTO) with a range of features in order entry, demand forecasting, master scheduling, production, shipping and financial accounting.

Thank you! Bob Collins, CFPIM, CIRM SSI North America Chicago, IL August 15, 2003