UNCLASSIFIED CJCSI 3170.01 Revision Update CAPT Jeff Gernand, J-8 22 January 2003.

Slides:



Advertisements
Similar presentations
Ref.: New Acquisition Policy by DAU, 20 May 2003, PMT-352
Advertisements

C.B. Cochrane 1 Jan 2009 The 5000 documents have been issued as a directive, two directives, a directive and an instruction, a directive and a regulation,
Introduction to the Joint Capabilities Integration and Development System (JCIDS) CAPT Keith Bowman, Joint Staff, J-8 Hello, I am Captain John Costello.
C2 Integration Division Marine Corps Combat Development Command
Mission Brief Paul N. Turner AF ISR Agency UNCLASSIFIED.
Capabilities and Acquisition Division
Global Positioning System (GPS) III Requirements Process
1 May 2009 ver. 5.5 Materiel Development Decision (MDD) MDA: Approves AoA Study Guidance Determines acquisition phase of entry Identifies initial review.
Ms. Nancy Dolan CNO N Human Systems Integration in DoD Acquisition.
Phase B Exit Criteria Issues Resolved or Addressed Technical Reviews / Readiness Reviews, Audits Initiate Milestone C Program Review Planning Process Initiate.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force AFRB MDD Template Rank, Name Office Symbol Date See footnotes on each.
“Common Process for Developing Briefings for Major Decision Points” INSTRUCTIONS Provide Feedback via to: Lois Harper PEO C4I and Space
Connecting People With Information DoD Net-Centric Services Strategy Frank Petroski October 31, 2006.
Chemical Biological Defense Acquisition Initiatives Forum (CBDAIF)
CLR 252 Developing KPPs Note from SME:
NAVY ARO – DAU Partnership
EMIS 7307 T&E Part 2 1 Documents in flux. MNS - Mission need statement –Non system specific, a needed capability. Being replaced by Initial Capabilities.
DoD Acquisition Domain (Sourcing) (DADS) Analysis of Alternatives (AoA) E-Business/SPS Joint Users’ Conference November 15-19, 2004 Houston, TX.
Systems and Mission Integration Presented to the Precision Strike Association Winter Roundtable 2005 Glenn F. Lamartin Director, Defense Systems January.
UNCLASSIFIED 1 Joint Requirements Office for Chemical, Biological, Radiological, and Nuclear Defense 26 April 2005.
Maj Richard “Krash” Krasner Directorate of Requirements Headquarters Air Force Space Command Air Force Space Command's Environmental Monitoring Requirements.
UNCLASSIFIED 1. Joint Faculty Education Conference J-8 Force Structure, Resources and Assessment Directorate Col M. D. Mulhern Capabilities and Acquisition.
CoCom Involvement in the Joint Capabilities Process November 4, 2003.
Initiate Technology Development Finalize AoA Plan, AS, ICD, TDS, Develop CDD, and TEMP Initiate Milestone B Program Review Planning Process Initiate Acquisition.
A Combat Support Agency Defense Information Systems Agency UNCLASSIFIED UNCLASSIFIED Spectrum Access: The Tools to Connect GEMSIS 15 Aug 2011.
New 5000 Documents 14 May 2001 New 5000 Documents 14 May 2001 Defense Systems Management College Acquisition Policy Department.
UNCLASSIFIED CJCSI Revision Update CAPT Jeff Gernand, J-8 12 November 2002.
The Defense Acquisition Management System 2009 Implementing DoDI 5000
1 NDIA'S 4th Annual Interoperability & Systems Integration Conference Joint Battle Management Command and Control Roadmap Mr. Alex Urrutia JI&I/JBMC2 USJFCOM.
Joint Capabilities Integration and Development System (JCIDS) Nov 2010
Joint Vision Why a New Document n Sustain and build on momentum of Joint Vision process ã Continue evolution of the joint force n Lessons learned.
Air Force Strategy to Resources
Life Cycle Logistics.
D Appendix D.11. Toward Net-Centric Acquisition Oversight A Proposal for an Acquisition Community of Interest (COI) MID 905 Streamlined Acquisition.
PEO C4I and SPACE FULL-RATE PRODUCTION REVIEW TIMELINE
MPE – Enabling ALL to securely SEE, DECIDE, ACT MPE - Highlights  Establish Core Implementation Working Group  Build Joining, Membership, and Exiting.
CCA LSS Support Slides1 Draft The Defense Acquisition Management Framework. Post Implementation Review (PIR) Capability Needs Satisfaction & Benefits.
Acquiring Capabilities July 15, 2005 Dr. Glenn F. Lamartin Director, Defense Systems Office of the Under Secretary of Defense Acquisition, Technology and.
USJFCOM 27 Jul EXECUTIVE OVERVIEW Col David Brown, USAF JFIIT Commander UNCLASSIFIED Joint Fires Integration and Interoperability Team (JFIIT)
JBMC2 Roadmap Development Office of the Under Secretary of Defense (AT&L) US Joint Forces Command (USJFCOM)
2.1 ACQUISITION STRATEGYSlide 1 Space System Segments.
MORS Special Meeting: Risk, Trade Space, & Analytics for Acquisition
DoD Template for Application of TLCSM and PBL
Lesson Objectives Determine the key Requirements Manager activities and the role of the ICD leading up to the MDD and during Materiel Solution Analysis.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities July 12, 2016.
Life Cycle Logistics.
DOTmLPF-P Change Recommendations
MNS - Mission need statement
DOTmLPF-P Change Recommendations
Lesson Objectives Assess the major requirements management activities during the acquisition process from Milestone B to Initial Operational Capability.
Requirements Overview
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities April 25, 2017.
DOTmLPF-P Change Recommendations
MDD to Milestone A Requirements Management Activities
Pre-MDD Capability Requirements Analyses
DOTmLPF-P Change Recommendations
Milestone A to Milestone B Requirements Management Activities
Capabilities-Based Assessments (CBAs)
DOTmLPF-P Change Recommendations
MDD to Milestone A Requirements Management Activities
Materiel Development Decision (MDD) to Milestone A (MS A)
Materiel Development Decision (MDD) to Milestone A (MS A)
CBA ICD CDD CDD CPD MDA MDA MDA MDA MDA AoA RVA RVA RVA
Joint DOTmLPF-P Change Recommendations (DCRs)
Introduction to the Joint Capabilities Integration and Development System (JCIDS) Major General Robin Scott J-8 / DDFA Hello, I am Captain John Costello.
Joint DOTmLPF-P Change Recommendations (DCRs)
The Department of Defense Acquisition Process
Perspectives on Transforming DT and OT Industry-Government Roundtable
Presentation transcript:

UNCLASSIFIED CJCSI Revision Update CAPT Jeff Gernand, J-8 22 January 2003

UNCLASSIFIED 2 Joint Capabilities Integration and Development System (JCIDS) Coordinated with DoD 5000 series Authorization Bill Section 803 language/Milestone A Capabilities Based Methodology Functional Capabilities Boards Analysis done within a component, through FCB direction, or other (analytic agenda) Documents - ICD, CDD, CPD, CRD 3170 Key Elements

UNCLASSIFIED 3 So, What’s Different? Top Down, Born Joint Requirements Generation System Systems Requirements Bottom up, stovepiped Integrated at Department Joint Concept of Operations Joint Operating Concepts Joint Integrated Architecture Joint Capabilities National Military Strategy Joint Vision Joint Capabilities Integration and Development System

UNCLASSIFIED 4 Requirements Generation System MAA MNA MNS CRD (If Required) ORD MS A AOA MS B ORD Update (If Reqd) Decision Review (If Reqd) ORD Update MS C Full Rate Production Review IOC JROC DAB/ Acq Exec JROC DAB/ Acq Exec DAB/ Acq Exec DAB/ Acq Exec LRIP Determination of Mission Need Concept and Technology Development System Development and Demonstration Production and Deployment DAB/ Acq Exec

UNCLASSIFIED 5 Functional Area Functional Concept Integrated Arch DOTLPF Process Materiel Process Analysis of Materiel Approaches DOTMLPFDOTMLPF FCB Feedback Overarching Policy NSS/NMS/Joint Vision Joint Concept of Operations Functional Area Analysis MS A Demo Increment 1 Demo Increment 2 MS B MS C MS B MS C AoA Concept Refinement JROC DAB JROC DAB JROC DAB Technology Development CDD Concept Refinement Decision 2 - Critical Design Review 3 - Full Rate Production Decision IOC ICD - Initial Capabilities Document CDD - Capability Development Document CPD - Capability Production Document CPD ICD Joint Capabilities Integration and Development System (JCIDS)

UNCLASSIFIED 6 Organization, analysis & prioritization of requirements within functional area Develop and update functional concept Ensure integrated architecture reflects the functional area Ensure new capabilities are conceived and developed in joint warfighting context Ensure JCIDS documents are consistent with integrated force, leverage abilities of the department, and contribute appropriately Develop and maintain prioritized list of DOTMLPF requirements Validate ACAT II and below Joint Impact proposals JROC approves which FCBs exist, functional areas, lead organization to chair each FCB FCB Responsibilities

UNCLASSIFIED 7 Service or Other Input to the FCB Functional Area Functional Concept Integrated Arch Functional Area Analysis Functional Needs Analysis DOTLPF Process Materiel Process Analysis of Materiel Approaches DOTMLPFDOTMLPF Alternative 1 Alternative 2 JROC Interest JROC/ DAB AoA FCB Joint Impact FCB/ Component MDA Overarching Policy NSS/NMS/Joint Vision Joint Concept of Operations ICD Concept Refinement Decision Gatekeeper Source Requirements Process JROC Interest Joint Impact JCPAT Review Independent Joint Integration Additional FCBs Input Source ICD/CDD/CPD Interoperability Certification CDD CPD

UNCLASSIFIED 8 capability Assessment Capability Roadmap capability task a task b task c capability Resource Strategy capability sys 3 SLEP sys 1 block upgrade new sys FOC sys 2 end of svc life FEEDBACK training change field new organization system 1 system 2 system 3 system 4 system 5 system 6 task a task b task c task d task etask ftask g Proposed Methodology National Military Strategy National Military Strategy Joint Vision Joint Vision Service Operating Concepts Service Operating Concepts Joint Concept of Operations Joint Concept of Operations Joint Operating Concepts Joint Operating Concepts Concepts DM Dominant Maneuver Architecture Precision Engagement Architecture Full Dimensional Protection Architecture Focused Logistics Architecture Joint Force C2 Architecture Intel, Surveillance, Recon Architecture Strategic Deterrence Architecture DM Dominant Maneuver Architecture Precision Engagement Architecture Full Dimensional Protection Architecture Focused Logistics Architecture Joint Force C2 Architecture Intel, Surveillance, Recon Architecture Strategic Deterrence Architecture Dominant Maneuver Architecture Dominant Maneuver Architecture Precision Engagement Architecture Precision Engagement Architecture Full Dimensional Protection Architecture Full Dimensional Protection Architecture Focused Logistics Architecture Focused Logistics Architecture Joint Force C2 Architecture Joint Force C2 Architecture Intel, Surveillance, Recon Architecture Intel, Surveillance, Recon Architecture Strategic Deterrence Architecture Strategic Deterrence Architecture Architectures

UNCLASSIFIED 9 ACQUISITION DECISION POINTS COMBAT IDENTIFICATION (CID) FY-XX I = IOCF = FOCB and C = AQ MilestonesD = Disposal POM XX - YY R = Restructure SADL BCIS ICIDS DACT FBCB2 MODE 4 IFF MODE 5 IFF Link 16 A - S S-S A - A/S - A USAUSAFUSMCUSNJOINT SERVICE: IF USN/USMC BC IF USA TBD USAF I F D NATO C PROGRAM TERMINATED BCIS F/O FCS BC I F BCIS FOLLOW-ON (LEGACY FORCES) TBD C PROGRAM TERMINATED LW BC I B C TLDHS TACP/MOD C I F TBD F D USN/USMC USAF F-16 25/30 A-10 TBD: I (IF JTRS WAIVER OK) F Poss Slip Link 22 I F MCTIS A C I B CSEL I C F D F TBD I

UNCLASSIFIED 10 RGS versus JCIDS RGS Requirements developed bottom-up CRDs integrate JROC for ACAT I/IA (SI) Components validate and approve the rest Self-policing for coordination Talks about evolutionary acquisition JCIDS Captures joint capabilities Architectures and common concepts set the stage All proposals screened for joint applicability regardless of ACAT FCB is responsible for coordination of functional area Implements evolutionary acquisition Some similarity in document content The difference is in how you get there

UNCLASSIFIED 11 ICD Versus MNS MNS Talks to mission need Looks at non-materiel and materiel alternatives Developed bottom-up Good forever ICD Captures the analysis Framed by common concepts What’s the desired capability? Insufficient analysis gets help Evaluates multiple materiel approaches Recommends a materiel approach Addresses a single capability Archived at MS-B Some similarity in content The difference is in the analysis and the common joint picture

UNCLASSIFIED 12 ORD Versus CDD ORD Describes the materiel solution Attributes and KPPs CDD Describes the SDD effort to develop materiel solution for the increment Attributes and KPPs for the increment Describes the program to get to the complete solution Updated at prior to each Milestone B Incorporates lessons learned Some similarity in content The CDD is focused on development and demonstration effort for the increment

UNCLASSIFIED 13 ORD Versus CPD ORD Describes the materiel solution Attributes and KPPs May be updated for MS-C CPD Describes the SDD effort to produce materiel solution for the increment Revised production attributes and KPPs for the increment Applies to a single production increment Some similarity in content The CPD is focused on production of the increment

UNCLASSIFIED 14 Thresholds and Objectives Development Threshold Development Objective 1 10 A Development Threshold Development Objective 1 10 A Optimum Development Threshold Development Objective 1 10 A Optimum Post-Trades Performance Production Threshold Production Objective 2 6 A Production Performance Target

UNCLASSIFIED 15Schedule January Writing team final session 21 Jan - 12 Feb O-6 Staffing (22 days) 28 Jan JRP 29 Jan JRB TBD JROC Feb Comment Resolution 18 Feb O-6 Comment Conference 20 Feb - 6 Mar Flag Staffing (15 days) Mar Comment Resolution Mar Flag Comment Conference 28 Mar Final Signature

UNCLASSIFIED 16 Implementation CRDs –JROC approved still current –Annual listing of effective CRDs and CRDs approved for development MNS –No new MNS –No MNS over four two years old will support a MS-A or direct to MS-B or MS-C decision –Past MS-A, B or C no revision to ICD required ORD –No ORDs six months after signature

UNCLASSIFIED 17 Questions?

UNCLASSIFIED 18 Service RGS Documents Processed by Year

UNCLASSIFIED 19 Alternative 2 Portfolios Joint fire support Conventional attack execution Nuclear attack Joint targeting Joint munitions Suppression of enemy air defenses Force Application Land combat ops Air ops Littoral warfare Space ops Joint urban ops Computer network attack Nuclear operations Unconventional warfare Military deception Electronic attack Special ops Psychological ops

UNCLASSIFIED 20 Alternative 2 Portfolios SIGINT OSINT MASINT IMINT HUMINT Combat ID Electronic support Battlespace Awareness Communications Joint Force C2 including standing joint force headquarters Communications and computer environment Campaign planning Knowledge management Predictive analysis Threat warning Command and Control (Includes partial processing of intelligence data) J2 position

UNCLASSIFIED 21 Alternative 2 Portfolios Deploy / redeploy Sustain Medical Mobility Logistics C2 Logistics Consequence management Personnel and infrastructure protection OPSEC Computer network defense Non-proliferation Counter-proliferation Missile defense Electronic protection Protection

UNCLASSIFIED 22 Things to resolve - As of 10 Jan FCBs - A cross-Service body engaged in each functional area is key to an effective JCIDS process –A finding of DPG Study 20 Group –Confirmed by CJCSI 3170 Writing Team –Historical throughput about 150 Service documents per year (all ACATS). –About 2500 Service acquisition programs. DJ-8 direction to send draft CJCSI 3170 to O-6 coordination and complete coordination on draft DoD Staffing initiated on 21 Jan.