1 Operation & Maintenance Savings M&V Summit Kansas City, MO 6 November 2002.

Slides:



Advertisements
Similar presentations
Key points for the future guidance on direct costing for large infrastructures in Horizon 2020 Brussels, 08 April 2013 Vittorio Morelli RTD.M.1.
Advertisements

Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
Regulation Grant Brown Bag Session February 12, 2013.
Introduction to Performance Contracting. What Is an ESCO? An Energy Services Company helps customers: –Upgrade facilities, including both: Energy efficiency.
Briefing on Historic Performance, Mandates, and Outlook by the Federal Performance Contracting Coalition Energy Savings Performance Contracting.
1 | Energy Efficiency and Renewable Energyeere.energy.gov DOE Small Business Webinar: Getting Involved with ESPCs May 6, 2013 Chip Goyette ESPC ENABLE.
Project management Project manager must;
How to Hit a Homerun Saving Energy and Updating Facilities Presented by Shirley McNutt.
Chapter 3 Project Initiation
Guaranteed Energy Savings Contracts Contracting Requirements for Local Governments Norma Houston NCGFOA Annual Conference July 18, 2011.
Quality Cost Management
1 MANAGING OVERTIME TO CONTROL COSTS AND IMPROVE SERVICES.
Circular A-110 Everything You Didn’t Want to Know.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Energy Saving Improvement Programs aka: ESIP; ESCO; P.L. 2009, c. 4 Gordon Ball, Senior Procurement Specialist Division of Local Government Services Introducing…
1 WIN-WIN MANAGEMENT: USING A TASK BASED SYSTEM TO IMPROVE PRODUCTIVITY Berkshire Advisors, Inc.
Using Uncertainty Modeling to Optimize M&V in ESPC Projects Discussion Document 10/31/02.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
1 Ex Ante Review of the SBD Program Energy Division Staff and Contractors Energy Efficiency Industrial/Agricultural Programs and Portfolio Forecasting.
Commissioning of Federal Energy Savings Performance Contracts (ESPC) May 20, 2003 Doug Dahle National Renewable Energy Lab.
Metering - FEMP’s Perspective Presentation to the Interagency Energy Management Task Force by Ab Ream, FEMP O&M Program Lead October 16,
Methodology for Energy Savings claim for Incentive Programs and Codes & Standards(C&S) accounting Presented by: Armen Saiyan P.E. For the California Technical.
FAR Part 2 Definitions of Words and Terms. FAR Scope of part (a)This part – (1) Defines words and terms that are frequently used in the FAR; (2)
Phoenix Convention Center Phoenix, Arizona Introduction to UESC Webinar Project Financing UESC Basics: Project Financing Through your Utility Julia Kelley.
Phoenix Convention Center Phoenix, Arizona A Review of the Current DOE IDIQ Track 5: Project Financing Session 3: ESPC Large and Small: The Basics of ESPC.
Phoenix Convention Center Phoenix, Arizona Using Private Financing to Maximize Energy and Cost Savings Track 5: Project Financing Session 7: Economics.
DoN ESPC PROGRAM M&V Briefing Russell Dominy, CEM.
Richard E. Thompson II, Esq.
Phoenix Convention Center Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider.
M&V Part 2: Risk Assessment & Responsibility Allocation.
Reviewing the Audit Results. Defining a Quality Base Year is Key to Maximizing Project Value n Base year is the mutually agreed upon pre-retrofit annual.
M&V Part 1: D.O. Review. 1-2 Your Instructor Mark Stetz, P.E. Ø Worked with FEMP since Ø Serves as FEMP’s M&V Specialist. Ø Contributed to FEMP.
Testing Programs for Transportation Management Systems – Practical Considerations Meaning of Requirements Statements Terms Testing is an important part.
WHAT’S CHANGED POST THE FINANCIAL SUSTAINABILITY INQUIRY? FMG Seminar 27 March 2009 Presented by John Comrie.
FAR Part 31 Contract Cost Principles and Procedures.
The Essential Energy Savings Performance Contracting Program Design South Carolina ESC November 29, 2012 Presented by: Jim Ploger.
AEG recommendations on Non-life insurance services (Issue 5) Workshop on National Accounts December 2006, Cairo 1 Gulab Singh UN STATISTICS DIVISION.
Volvox Finance 2 How we will manage the Finance Angela Pettit – Contracts Officer.
Budgetary Planning and Control
M&V Part 4: M&V Plan Review. 4-2 M&V Plan Review Ø FEMP Documents F M&V Overview Checklist (Phase 2) F Final M&V Plan Checklist (Phase 3) Ø Risk & Responsibility.
1 MARKETING RESEARCH Week 5 Session A IBMS Term 2,
WASBO FALL CONFERENCE 2015 CAREY BRADLEY, CONSULTANT BOB SOLDNER, DIRECTOR DPI SCHOOL FINANCIAL SERVICES TEAM Energy Efficiency Exemption: Use, Rules and.
Phoenix Convention Center Phoenix, Arizona ESPC Overview Project FinancingESPC Large and Small: The Basics of ESPC Tom Hattery, DOE-FEMP Federal Project.
Fiscal Planning (Budgeting). Fiscal Planning Fiscal planning is not intuitive; it is a learned skill that improves with practice. Fiscal planning requires.
Applications for Non-recurrent subsidy to carry out Major Repairs / Slope Repairs Briefing Session for Schools under the Direct Subsidy Scheme
CHAPTER NO. 4 CAPITAL BUDGETING. 2 Capital and Capital Budgeting Capital: is the stock of assets that will generate a flow of income in the future. Capital.
PRESENTATION TO PORTFOLIO COMMITTEE ON WATER AFFAIRS AND FORESTRY Cindy Damons 28 May 2008 The role of municipalities in managing and giving effect to.
Elevating the Quality of Life in the District Contracting and Procurement Division Information Session 2 Request for Proposal November 5, 2015.
Energy Efficiency in Public Buildings in Brazil – Guidelines for Implementation Anand Subbiah, Nexant Inc. April 30, 2002, Kubitschek Plaza Hotel, Brasilia,
1 Financial management for water, sewer, and storm water systems Most financial management of water, sewer, and storm water systems takes place in a government.
SUPPLEMENTAL ENVIRONMENTAL PROJECTS. KEY CHARACTERISTICS OF A SEP Projects must improve, protect or reduce risks to public health or environment. Projects.
OMB Circular A-122 and the Federal Cost Principles Copyright © Texas Education Agency
King Faisal University [ ] 1 Business School Management Department Finance Pre-MBA Dr Abdeldjelil Ferhat BOUDAH 1.
City of Kansas City, Missouri Accounting for Other Post-Employment Benefits Thursday, May 1, 2008.
District of Columbia Housing Authority Office of Capital Programs and Development Construction Services Administration, LLC Going Green: Intelligent Investments.
Johnson Controls, Inc. — 1 1/6 2/6 4/6 5/6 1/4 3/4 1/2 WAHOO PUBLIC SCHOOL SENIOR/JUNIOR HIGH & ELEMENTARY ENERGY PERFORMANCE CONTRACT FEASIBILITY March.
Contracting for Evaluation Products and Services by James B. Bell
Income recognition. Exchange/Non-Exchange Transactions Income received or due to the University will either be part of an Exchange Transaction or a Non-Exchange.
1. 2 Cost & Price Analysis Breakout Session # 312 Beverly Arviso, CPA, Fellow, CPCM, CFCM, Arviso, Inc. Melanie Burgess, CPA, CFCM, Burgess Consulting,
1 Detailed EM&V Approach for each of BGE’s Proposed Conservation Programs January 10, 2008.
CONNECTIONAL MINISTRIES REACHING FURTHER WITH THE GOSPEL BY SHARING THE LOAD.
Parts Management Agreements
EDENTON-CHOWAN SCHOOLS
Energy Savings Performance Contracts & Energy Service Companies
FAR Part 2 - Definitions of Words and Terms
Track 2 Working Group 4th Meeting
Track 2 Working Group 4th Meeting
(Additional materials)
Request for Proposal & Proposal
EDENTON-CHOWAN SCHOOLS
Presentation transcript:

1 Operation & Maintenance Savings M&V Summit Kansas City, MO 6 November 2002

2 Agenda What is meant by O&M savings? What FEMP Legislation says. What FEMP Legislation DOESN'T say. Relationship between O&M and R&R. M&V of O&M. Case Study: Military District of Washington. Discussion of O&M Issues.

3 What Are O&M Savings? Consider: IDIQ Delivery Order Guidelines Practical Guide to Savings FEMP 2.2, Chapter 33

4 IDIQ: B.2 REQUIRED SERVICES The contractor shall provide...all labor, material, and equipment necessary to... provide energy cost savings and related operation and maintenance cost savings.... Contracted delivery order services may also include operations and maintenance services...

5 IDIQ: C.1 GENERAL REQUIREMENTS This contract is to acquire...energy conservation services...to reduce energy... costs, and energy- related operations and maintenance costs.... The Contractor shall...provide operations and maintenance as specified in each delivery order. The cost of an ECM project must be covered by the reduced energy and related operation and maintenance cost savings...

6 IDIQ Definitions Energy Conservation Measure. Measures that are applied...that improve...energy efficiency...and...operation and maintenance efficiencies.... ECM is interpreted to include measures that result in energy and/or energy- related cost savings that may not necessarily improve energy efficiency.

7 IDIQ Definitions Energy Cost Savings. A reduction in the cost of energy and related operation and maintenance expenses from a base cost... as a result of... improvements, altered operations and maintenance, or technical services.

8 IDIQ Definitions Energy-Related Cost Savings. Energy- related cost savings are reductions in expenses (other than energy costs) related to energy- consuming equipment, generally affecting operations, maintenance, renewal [replace? refurbish?], or repair expenses of equipment.

9 IDIQ Definitions Recurring Energy-Related Cost Savings. Recurring energy-related cost savings are... reductions in energy-related expenses that are budgeted and allocated annually, i.e., lowered costs for ongoing maintenance, operations and repair. These must be “real” savings, i.e., there must be an associated reduction in money that the Government was currently spending or planning to spend.

10 continued Operations, maintenance, and repair costs for tasks currently being performed by the government or by a contractor hired by the Government are energy- related cost savings if the ESPC contractor assumes the task, reduces the task, or eliminates the task. The Government will determine whether an ESPC contractor-proposed task assumption, reduction, or elimination will be considered recurring energy- related cost savings.

11 DO Guidelines Capital Improvements Without Capital Appropriations Appropriations from Congress for operating and maintenance expenses may be used for ESCO payments...if the money is appropriated for and comes from the agency funds budgeted and allocated for energy and energy- related O&M expenses.

12 DO Guidelines Allowable Cost Savings The money to pay the contractor...must be paid from funds appropriated for energy expenses and related O&M expenses, and must all be from cost savings... Two main categories of savings are referred to in ESPC delivery orders: (1) energy cost savings and (2) energy-related O&M cost savings. There is no basis in the ESPC statute or regulations for requiring that energy savings constitute 50% or any other arbitrary proportion of total savings.

13 DO Guidelines Real Savings Only "real savings" may be applied to contractor payments; that is, the savings must show as reduced expenses in the agency's accounts for energy or energy-related O&M. Payments must come from money that the government was either already spending or planning to spend [and appropriated]... Only real savings, by definition, will make money available for contractor payments.

14 DO Guidelines When Real Is Not Ideal: Maintenance and Operations Spending Tight budgets in many cases force agencies to stretch energy dollars by operating their facilities using substandard procedures or equipment.... However...the energy-related savings must be figured on the basis of actual budgeting and spending patterns rather than on the level of spending that would have been necessary for optimal O&M of the system.

15 DO Guidelines DOE FEMP Programmatic Guidance on Savings and Payments DOE FEMP guidance stresses the directive that agencies should “exercise due diligence” to document for the project all of the energy-related O&M cost savings in the delivery order, which may include (1) for recurring energy-related O&M cost savings, the estimated avoided operation, maintenance, renewal, repair, or other costs;...

16 DO Guidelines Checklist of Guiding Principles and Directives on Savings and Payments Only real savings...that show as reduced costs for...energy- related O&M expenses. O&M savings may be claimed only for the amount that was actually budgeted or being spent... The basis for determining all savings must be documented and agreed upon by the contractor and the customer in the delivery order. Agencies are advised to carefully document cost savings of every kind.

17 FEMP M&V Guidelines 2.2 Chapter 33 discusses how to verify O&M savings, but does not provide direction. Section does not specify baseline costs and implies that O&M baseline costs may be based on standard practices instead of actual costs. Section says that “ All payments...must come from demonstrable savings to the agency's budget.” but then later implies that O&M baseline costs may be based on other practices instead of actual costs.

18 What FEMP Says You can’t save what you’re not spending.

19 What FEMP Doesn’t Say DO Guidelines: Allowable Cost Savings There is no basis in the ESPC statute or regulations for requiring that energy savings constitute 50% or any other arbitrary proportion of total savings. Therefore, acceptable levels of O&M savings are decided by mutual agreement between agency and ESCO.

20 Relationship between O & M and R & R For the baseline case, the IDIQ and the DO Guidelines indicate that existing ‘repair and replace’ budgets are part of the operations and maintenance budget. Therefore, existing R&R budgets can be used to help establish baseline O&M costs.

21 Relationship between O & M and R & R For the post-retrofit case, R&R of equipment is defined in the DO but generally the ESCO assumes responsibility. Replacement due to failure is to be covered under warranty for a specified period; scheduled equipment replacement (e.g, lights) is to be budgeted in the payment stream. Responsibility Matrix mentions R&R.

22 M&V of O&M Savings Definitions* Gross O&M Savings: Real O&M expenses that will be reduced or eliminated due to installation of equipment or provision of services. * Mark’s

23 M&V of O&M Savings Net O&M Savings: Gross O&M savings less O&M service costs paid to ESCO O&M Savings,NET = O&M Savings,GROSS - O&M Payments

24 M&V of O&M Savings O&M expenses include: Normal operating labor Preventative maintenance labor Consumable parts (lamps, filters...) Scheduled replacement parts & labor Emergency repair parts & labor End of life equipment replacement

25 Case Study: MDW Military District of Washington comprises five Army bases in Washington, D.C. area. Used ESPC via competitive solicitation in 1998 to select ESCO. Three ESCOs responded to RFP.

26 Case Study: MDW Savings from all proposers had significant O&M component: 20% to 50% of the total savings.

27 Case Study: MDW Net O&M Savings not the whole story- need to look at baseline O&M expenses.

28 Case Study: MDW Baseline O&M costs vary greatly due to: equipment included or excluded from analysis, whether repair & replace costs were included, assumed labor costs, assumed labor times.

29 Case Study: MDW Contract awarded to Viron/Pepco in $224 Million over 18 years, ~$14 MM/yr. O&M savings and services were significant components of the contract. –14% of savings are from Net O&M – 40% of payments are for O&M services

30 Case Study: MDW Problem: Neither V/P nor MDW had a clear idea of what the ‘true’ O&M costs were. MDW was unable to document their O&M costs in a useful manner. V/P responded by developing O&M costs based on labor rates, typical practices, expected lifetimes and repair & replacement practices.

31 Case Study: MDW Problem: Methodology used to develop O&M costs was not properly reviewed and contains some questionable assumptions and methodology. MDW agreed to the methods, thus agreeing to these stipulated conditions.

32 Case Study: MDW Baseline O&M practices and costs based on: R.S. Means Maintenance Cost Data ASHRAE Handbooks Other government facilities NASA, NAVFAC, ACE, GSA, DOE, DOS Equipment manufacturers Consultant’s experience

33 Case Study: MDW Estimated baseline and ESCO O&M costs were a function of: Preventative Maintenance Reactive Maintenance Replacement Factor Residual Value

34 Case Study: MDW Situation: Change orders significantly affect O&M savings and therefore payment stream. MDW and V/P disagree over value of O&M savings. Validating claimed O&M baseline expenses is difficult- claimed methodology seems to be inconsistent and not repeatable.

35 Case Study: MDW Solution: None, since O&M baseline is part of the contract. MDW had the opportunity to provide O&M data but couldn’t. Lesson: Agreeing to an O&M baseline without sufficient diligence sets up a situation for disagreements later.

36 Case Study: MDW Conclusion: Lack of direction (in 1998/1999) resulted in accepting a project with large reliance on O&M for savings, savings whose development appears questionable. Working relationship between parties suffers.

37 O&M Working Group To be headed by Ab Ream, DOE. Will address O&M savings in alternatively- financed projects. Proposes meeting week of 18 November. DOE headquarters, Washington, D.C ,

38 Discussion Points Discussion of O&M Issues –What guidance should FEMP/DOD provide? –How much O&M savings is too much? –Defining the baseline & what to include –Treatment of ambiguous baselines –Defining post-retrofit costs –Budgetary considerations –Staffing considerations

39 Discussion Points –Evaluation of indirect benefits (labor redirection) –Repair & Replacement: O&M or separate issue? –Persistence of revised O&M practices –Relationship between energy savings and O&M practices