© 2008 Eskom. All rights reserved. From Strategy to Implementation UPDEA – Durban March 2009 Maboe Maphaka Energy Losses Management Programme.

Slides:



Advertisements
Similar presentations
STRENGTHENING FINANCING FOR DEVELOPMENT: PROPOSALS FROM THE PRIVATE SECTOR Compiled by the UN-Sanctioned Business Interlocutors to the International Conference.
Advertisements

Policies and Procedures for Civil Society Participation in GEF Programme and Projects presented by GEF NGO Network ECW.
IBM Corporate Environmental Affairs and Product Safety
Program Management Office (PMO) Design
Achieve Benefit from IT Projects. Aim This presentation is prepared to support and give a general overview of the ‘How to Achieve Benefits from IT Projects’
Department of Tourism Department of Tourism NTSS DRAFT REVIEW FRAMEWORK NTSF MEETING 17 SEPTEMBER 2014.
THREE YEAR PLAN PRESENTATION MANDATE Tasked with the responsibility of improving productivity in all spheres of the nation’s economic and.
AUDIT COMMITTEE FORUM TM ACF Roundtable IT Governance – what does it mean to you as an audit committee member July 2010 The AUDIT COMMITTEE FORUM TM is.
MODULE 3 THE ENVIRONMENTAL PRINCIPLES Session 2: Principle 8
Viewpoint Consulting – Committed to your success.
Month Year Working together to achieve your desired outcomes, by delivering service excellence. Building Engineering Solutions for the optimisation of.
The Irish standard for Energy Management – IS393
OPTIONS AND REQUIREMENTS FOR ENGAGEMENT OF CIVIL SOCIETY IN GEF PROJECTS AND PROGRAMMES presented by Faizal Parish Regional/Central Focal Point GEF NGO.
SCCAP is a program of Strategic Energy Innovations “PG&E” refers to Pacific Gas and Electric Company. A subsidiary of PG&E Corporation. © 2012 Pacific.
Less is More: SEE Action and the Power of Efficiency Hon. Phyllis Reha Commissioner, Minnesota PUC Co-Chair, SEE Action Customer Information and Behavior.
Project Human Resource Management
ISO Richard Welford CSR Asia © CSR Asia 2011.
Energy Issues in Peru and the Andes: Environmental and Social Aspects George Washington University January 28, 2005 Dr. Robert H. Montgomery Head, Environmental.
Seminário O controle interno governamental no Brasil Velhos Desafios, Novas Perspectivas 14 a 16 de Maio Iguassu Resort – Foz do Iguaçu - Paraná International.
Charlie Meila| Senior Sales Manager 01 st October Engineers Ireland Briefing: ISO 50001& Training.
Country Ownership of National HIV & AIDS Response: A Private Sector Perspective Country Ownership of National HIV & AIDS Response: A Private Sector Perspective.
Reduction in losses incurred in power distribution.
How Institutionalised are you ?. Environment You are making progress in a number of environmental areas including energy, water management, biodiversity,
Community Participation in Recovery Jon Bennett Director, Oxford Development Consultants Wenchuan Earthquake Response, China Workshop, July 14-15, 2008,
Logistics and supply chain strategy planning
Certificate IV in Project Management Introduction to Project Management Course Number Qualification Code BSB41507.
Michalis Adamantiadis Transport Policy Adviser, SSATP SSATP Capacity Development Strategy Annual Meeting, December 2012.
Toolkit for Mainstreaming HIV and AIDS in the Education Sector Guidelines for Development Cooperation Agencies.
Institutional Development for Improved Water Quality | November 2010 Operation and Maintenance for Safe Drinking Water – Institutional development to achieve.
Energy Losses Management Programme From Strategy to Implementation ‘Social Marketing Strategy Overview’
CHALLENGING BOUNDARIES Rhodia way, The way we do business.
Governance: Challenges & Possible Solutions Audit and Risk Indaba 28 October 2011.
1 Interaction between SAIs and PACs. Presentation to SADCOPAC.
Monitoring and Evaluation of GeSCI’s Activities GeSCI Team Meeting 5-6 Dec 2007.
Technology Transfer Execution Framework. 2 © 2007 Electric Power Research Institute, Inc. All rights reserved. Relationship Between Your EPRI Value and.
STREAM 1B: SECTOR STRUCTURAL AND RESTRUCTURING ISSUES CLLR C JOHNSON, SALGA NEC ELECTRICITY DISTRIBUTION MAINTENANCE SUMMIT 9 JUNE 2008.
© 2001 Change Function Ltd USER ACCEPTANCE TESTING Is user acceptance testing of technology and / or processes a task within the project? If ‘Yes’: Will.
1 Distribution Efficiency Conservation Voltage Regulation (CVR) Jillianne Welker 4/21/2009.
Chemistry making a world of difference Responsible Care ® - Thrusts in Europe Dr Richard Robson Cefic Director APRCC, Manila, Philippines 17 th November.
Social Housing Foundation. Meeting with Housing Portfolio committee Role, purpose and mandate Strategy map Supporting housing delivery Key achievements.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
An overview of Demand Side Management (DSM) Implementation in RSA Morore Mashao ESKOM - DSM.
2008 Electricity Distribution Maintenance Summit Stream 3A: Funding, Investment and Financial issues 10 June 2008 Theo van Vuuren Divisional Executive.
Energy Efficiency Action Plan Kathleen Hogan Director, Climate Protection Partnerships Division U.S. Environmental Protection Agency NARUC Winter Meetings.
Re-Engineering and Re-Organisation of the Revenue Management Function Project Overview August 2007.
Strategies for Knowledge Management Success SCP Best Practices Showcase March 18, 2004.
Water Conservation and Water Demand Management Progress with the Strategy Implementation 16 September 2010.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
Business Analysis. Business Analysis Concepts Enterprise Analysis ► Identify business opportunities ► Understand the business strategy ► Identify Business.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
Vito Cistulli - FAO -1 Damascus, 2 July 2008 FAO Assistance to Member Countries and the Changing Aid Environment.
Solutions4Business Inc. “Your Consulting Partner for Strategic Supply Chain Initiatives” Mark Hehl Senior Consultant Solutions4Business Inc.
Submission to NERSA on Revised Eskom MYPD2 Chemical and Allied Industries Association January 2010.
PRESENTATION TO PORTFOLIO COMMITTEE ON WATER AFFAIRS AND FORESTRY Cindy Damons 28 May 2008 The role of municipalities in managing and giving effect to.
Kathy Corbiere Service Delivery and Performance Commission
Internal Auditing Effectiveness
European strategies for digitisation: the context of i2010 digital libraries Pat Manson Head of Unit Cultural Heritage and Technology Enhanced Learning.
1. PRESENTATION TO THE SELECT COMMITTEE ON APPROPRIATIONS Public Hearing on Division of Revenue Bill March
Managing the National Communications Process UNFCCC Workshop on Exchange of Experiences and Good Practices among NAI Countries in Preparing NCs September.
Improving performance, reducing risk Dr Apostolos Noulis, Lead Assessor, Business Development Mgr Thessaloniki, 02 June 2014 ISO Energy Management.
CARILEC. An Association of Electric Utilities CARILEC An Association of Electric Utilities The Caribbean Electric Utility Service Corporation (CARILEC)
Integrated policy frameworks
RESTRUCTURING OF THE ELECTRICITY DISTRIBUTION INDUSTRY
How can metros and municipalities operate to ensure that revenue generated from electricity sales is sustainable? by Dr Minnesh Bipath and Dr Willie de.
Guidance notes for Project Manager
Organisational NRW Management
Malcolm Johnson, Director, Telecommunication Standardization Bureau
CEng progression through the IOM3
RCA Workshop on RCARO Future Strategies July 2007
Presentation transcript:

© 2008 Eskom. All rights reserved. From Strategy to Implementation UPDEA – Durban March 2009 Maboe Maphaka Energy Losses Management Programme

© 2008 Eskom. All rights reserved. 1 Agenda Background Strategy formulation Implementation Results Concluding Remarks

© 2008 Eskom. All rights reserved. 2 Challenge Background to Energy Loss Programme Distribution experienced higher than expected energy losses over the past few years Initiated the Energy Losses Management Programme Action  Arrest negative trend  Improve current energy loss management practices  Introduce new strategies  Establish acceptable level at which losses should be managed as an inherent risk of the business  Ensure operational sustainability  Leverage other internal business competencies In support of the Eskom Financial Sustainability Objective Objective

© 2008 Eskom. All rights reserved Total Distribution Energy Losses Trend 12 month moving average (MMA) Total Energy Losses 5.34% YTD Rising Energy Losses Trend, a major concern for the utility

© 2008 Eskom. All rights reserved. 4 Reasons For Energy Losses Management Initiative TheftIllegal connections and revenue lost due to theft of electricity is a public domain risk for Eskom Regulatory Management In light of Eskom’s impending tariff hikes over the next three years, the public (and NERSA) will potentially criticise Eskom for rate hikes while not managing energy and revenue losses. Eskom would have to demonstrate its serious interventions to address the problem Reputation RiskEskom need to show all reasonable attempts to get the SA public to be aware, informed and encouraged to be compliant by addressing behaviour Revenue Recovery The considerable revenue loss suffered, necessitates Eskom to explore and employ all possible avenues to recover and prevent these losses Base Load Electricity theft impacts demand (load) on the grid. LPUs, SPUs and PPUs who are illegally connected, tampering with metres, etc, will have no incentive whatsoever to use electricity efficiently

© 2008 Eskom. All rights reserved. 5 Agenda Background Strategy formulation Implementation Results Concluding Remarks

© 2008 Eskom. All rights reserved. 6 6 Strategy Formulation Strategy Development:  Literature reviews –International best practices –Technology investigations  International consultant input (PA Consulting)  International visits (Brazil and Argentina)  Conducted national industry workshops  Internal workshops with subject matter experts Strategic Objectives:  Arrest the current upwards energy loss trend  Manage the trend to an acceptable level  Ensure sustainability at an acceptable level

© 2008 Eskom. All rights reserved. 7 Detailed Losses Management Strategy 1.Normalise Losses to an agreed level in the medium term. 2.Build the mechanisms to sustain at that level as part of normal business. Audit, measure and fix customer installations Audit, measure and fix customer installations Ringfence electrical networks to balance energy delivered Ringfence electrical networks to balance energy delivered Implement tested technologies to manage energy losses Ensure sustainability through proper resourcing Use business intelligence to identify high loss customers Resource and prioritise customer audits Co-ordinate customer audits Measure results nationally Identify network based boundaries Install metering to measure energy flows Audit and clean data per measured area Balance energy inflows and outflows to determine anomalies Investigate all possible options to reduce energy losses Pilot and test scalability of identified technologies Implement and measure benefits of tested technologies Determine business RACIs for revenue losses management activities Perform detailed environmental analysis and identify gaps Implement measures to address identified gaps Build competence and certify revenue loss management resources Measure results and adjust resource strategy accordingly Communicate and educate internal and external stakeholders Improved Data Accuracy critical to process How? How? How? How?

© 2008 Eskom. All rights reserved. 8 Non-Technical Losses Technical Losses Strategic Objective Strategies for Managing Energy Losses Communicate and educate internal and external stakeholders Build mechanisms to control losses Reduce Losses to agreed level (medium term) Audit, measure and fix customer installations Ring fence electrical networks to balance energy delivered Implement tested technologies Ensure sustainability Actions 1234 Strategic Objective Achieve cost optimised level of technical losses throughout network Initiated Power Factor correction project Reactive Power Compensation Working Group Reviewing energy losses criteria during network design and operations Actions 1 23

© 2008 Eskom. All rights reserved. 9 Strategic Objective Strategies for Managing Technical Losses Achieve cost optimised level of technical losses throughout network Initiated Power Factor correction project Reactive Power Compensation Working Group Reviewing energy losses criteria in project design and planning Actions  Focuses on preventing voltage collapse in poor power factor networks  Improves transfer capacity of networks and reduce technical line losses in the short term  Develop guidelines for application to Sub transmission networks  Going forward network planning incorporate principles of reactive compensation and the loss reduction effects thereof  Design and planning of new or refurbished networks in line with energy loss objectives, network standards and related investment criteria's Detail 123  Review current technical loss calculation methods & assumptions (clean slate review)  Review of technical losses imbedded in terms of long term cost of supply Approach

© 2008 Eskom. All rights reserved. 10 Strategic Objective Strategies for Managing Non-technical Losses Communicate and educate internal and external stakeholders Build mechanisms to control losses Reduce Losses to agreed level (medium term) Audit, measure and fix customer installations Ring fence electrical networks to balance energy delivered Implement tested technologies Ensure sustainability Actions  Use business intelligence to identify high loss customers  Resource and prioritise customer audits  Co-ordinate customer audits  Measure results nationally  Identify network based boundaries  Install metering to measure energy flows  Audit and clean data per measured area  Balance energy inflows and outflows to determine anomalies  Investigate all possible options to manage; reduce energy losses  Pilot and test scalability of identified technologies  Implement and measure benefits of tested technologies  Determine business RACIs for revenue losses management activities  Detailed analysis and identify gaps  Build competence and certify revenue loss management resources  Measure results and adjust resource strategy accordingly Approach 1234

© 2008 Eskom. All rights reserved. 11 ELP Public Communication Initiative Detail To influence the voluntary behaviour of SA consumers to be legal electricity users by:  Reducing the number of illegal electricity consumers  Mobilising South Africans to report and prevent illegal connections  Building partnerships to deal with illegal electricity consumption Objective Through-the-line 1 campaign that supports, publicises and drives behaviour-change utilising:  Community mobilisation: building compliant behaviour through norms, values, partnerships, etc  Amnesty & Reporting line campaign  Partnership campaign with Organised business, Civil society & Communities  Compliance campaign, Eskom Audit roll-out, Trend analysis  Communication: Publicising all the above Tool 1 Through-the-line: Utilising both Above-the-line (National media such as TV, radio, national press) and Below-the-line (Community media, brochures, etc.) channels  Focus on both LPUs/ Large SPUs and residential SPUs.  Two integrated pillars: a Pro-active Integrity-based Program and a Compliance-based Program  Show target audiences the impact & risk of illegal use of electricity  Show target audiences the benefits of legal electricity usage  Empower target audiences through partnerships, organised structures and mobilisation  Tie this campaign in with broader energy efficiency education  Aligned with existing Eskom campaigns Approach 1. Reduce energy losses 2.Improve safety 3.Reduce non-payment 4. Improve availability of supply Benefits

© 2008 Eskom. All rights reserved. 12 Agenda Background Strategy formulation Implementation Results Concluding Remarks

© 2008 Eskom. All rights reserved. 13 Realising Results In order to realise results, the following has been put in place to assist in the management of energy losses:  Energy Losses Audit Methodology –To enhance the value derived from customer meter audits  Energy Losses Management Scorecard –For measurement and target setting – links to Strategy –Breaks down the weighting per performance measure / KPI  Energy Losses Management RACI –Assigns RACI principles (i.e. who should be accountable, responsible for results, etc) to various roles and departments  Functional Job Compacting –Proposed ELP Compacting assigns a weighting (% of Functional Compact dedicated to EL) to each department / role identified in RACI

© 2008 Eskom. All rights reserved. 14 Programme Plan Efforts to be integrated into normal business practice Pilot and Quantify. Assign, Resource, Train, Measure Ongoing Communication Initiatives Account for energy delivered by balancing energy at feeder level Identify and resolve structure, process, skills and resource constraints 2006/ Ongoing communication initiatives to create awareness and understanding of, and change behaviour in managing energy losses (both internal and external) Prioritise and Measure Ringfence and Balance Pilot and Apply Manage and Resource Audit, measure and fix customer installations Ringfence electrical networks to balance energy delivered Implement tested technologies to manage energy losses Ensure sustainability through proper resourcing Communicate to and educate internal and external stakeholders Build governance and capacity to sustain as part of normal business Proactive identification, auditing, fixing and measurement of customer audits Build governance and capacity to sustain as part of normal business Build governance and capacity to sustain as part of normal business Build governance and capacity to sustain as part of normal business Identify, investigate, pilot and implement tested technologies to manage energy losses

© 2008 Eskom. All rights reserved. 15 Measurement and Target Setting How the Scorecard Supports the Strategy

© 2008 Eskom. All rights reserved. 16 REC Regional Project Manager Regional ELP Task Team Communication Regional ELP Sponsor Regional ELP Champion/s Technology Network Ring Fence Manage & Resource Audit, Measure & Fix Proposed Regional ELP Implementation Structure Should be a REC Member Dedicated Regional resource National PMO To be chaired by ELP Sponsor

© 2008 Eskom. All rights reserved. 17 Agenda Background Strategy formulation Implementation Results Concluding Remarks

© 2008 Eskom. All rights reserved. 18 Trend of Total Distribution Energy Losses Jan 02 – Jan month moving average (MMA) Dx wide energy losses initiatives Total Energy Losses 5.34% YTD Energy Losses Trend improving after the implementation of the Energy Losses Management Programme

© 2008 Eskom. All rights reserved. 19 Current Distribution losses National trend 12 month moving average Monthly actual losses

© 2008 Eskom. All rights reserved. 20

© 2008 Eskom. All rights reserved. 21 Programme Status – LPU Audits Distribution Audit and Measure Workstream Up to end January ,371 10,371 9,419 11,002 1,

© 2008 Eskom. All rights reserved. 22 Programme Status – SPU Audits Distribution Audit and Measure Workstream Up to end January , , , ,125 14,125 6, ,885 13,243

© 2008 Eskom. All rights reserved. 23 Programme Status – PPU Audits Distribution Audit and Measure Workstream Up to end January ,829,911 1,380,075 1, ,103,114 29,415 77,879 22,788 45,233 34,108

© 2008 Eskom. All rights reserved. 24 Agenda Background Strategy formulation Implementation Results Concluding Remarks

© 2008 Eskom. All rights reserved. 25 Lessons learned  Energy theft solution requires joint efforts in different kinds of areas –Technical –Commercial –Governmental  A close follow up is necessary to facilitate payments for low income clients  Personnel commitment is fundamental for success  Isolated actions are not useful  Persistent actions are required with close follow up  Standard procedures are important  KPIs are necessary for objective progress measurement  Senior management involvement is highly critical  Beware of the enemy within

© 2008 Eskom. All rights reserved. Questions

© 2008 Eskom. All rights reserved. 27 The End