Sandro Bologna - ENEA Claudio Balducelli – YLICHRON (ENEA) Massimo Gallanti - CESI Ricerca Workshop – AICT Roma 6 Dicembre, 2007 ICT nella gestione del.

Slides:



Advertisements
Similar presentations
Manuel Losada Friend 2º Foro TIC y Sostenibilidad Sevilla, 27 de Mayo de 2009.
Advertisements

Introduction to IRRIIS testing platform IRRIIS MIT Conference ROME 8 February 2007 Claudio Balducelli.
Planning, optimization and regulatory issues
Washington DC October 2012 A Vision for an Advanced Supervision and Control System for the Electric Grid Ramón A. León XM S.A. E.S.P Colombia.
AMI & Grid Data Analytics & Analysis Management Platform Page  1 What does this platform offer? Our tool is a next generation grid management software.
Vendor Briefing May 26, 2006 AMI Overview & Communications TCM.
DM Copyright © Tekes Duration: Funding volume: 50 million euros Contact: Jerri Laine, Tekes Tel:
IRRIIS SimCIP Demo (version 0.8- May 2009) IRRIIS European Project – Antonio Di Pietro – ENEA.
John B. Wharton, PE Technical Executive Baltimore, Maryland October 16, 2013 Perspectives on Grid-Integrated Microgrids Maryland Clean Energy Summit.
Cyber Security and the Smart Grid George W. Arnold, Eng.Sc.D. National Institute of Standards and Technology (NIST) U.S. Department of Commerce
SmartGrids 9th AC meeting Brussels, 14th September SmartGrids Strategic Research Agenda for Europe’s Electricity Networks of the Future Prof. Ronnie.
LoCal: Rethinking the Energy Infrastructure using Internet Design Principles David Culler University of California, Berkeley Renewable Energy Microgrid.
By Lauren Felton. The electric grid delivers electricity from points of generation to consumers, and the electricity delivery network functions via two.
Chapter 9: Moving to Design
ICT AND SMART GRIDS GERARD J.M. SMIT CHAIR CAES (COMPUTER ARCHITECTURES FOR EMBEDDED SYSTEMS)
August 8, 2015ECI Confidential. AccessWave Smart Grid Market Trends& Applications Matthias Nass VP Field Marketing EMEA.
SMART GRID: What is it? Opportunities, and Challenges
Towards a Distributed, Service-Oriented Control Infrastructure for Smart Grid ASU - Cyber Physical Systems Lab Professor G. Fainekos Presenter: Ramtin.
A project under the 7th Framework Programme CPS Workshop Stockholm 12/04/2010 Gunnar Björkman Project Coordinator A Security Project for the Protection.
2015 World Forum on Energy Regulation May 25, 2015
MIT Requirements for TLC IRRIIS MIT Conference ROME 8 February 2007 Giustino FUMAGALLI Arnaud ANSIAUX.
EU policy objectives and European research on Smart Grids European Commission, DG Research Henrik Dam Research Programme Officer ADDRESS international.
Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment Srijib Mukherjee, Ph.D., P.E. UC Synergetic.
The role of ICT and telecommunication companies as service providers
FirstEnergy / Jersey Central Power & Light Integrated Distributed Energy Resources (IDER) Joseph Waligorski FirstEnergy Grid-InterOp 2009 Denver, CO November.
Microgeneration and new end-use technologies in ADDRESS, INCA and SEESGEN-ICT Jussi Ikäheimo (VTT) (& Regine Belhomme, Giovanni Valtorta) IEA DSM 17 workshop.
Frankfurt (Germany), 6-9 June 2011 ARCHITECTURE AND FUNCTIONAL SPECIFICATIONS OF DISTRIBUTION AND TRANSMISSION CONTROL SYSTEMS TO ENABLE AND EXPLOIT ACTIVE.
Global test beds for control, safety, security and dependability in ICT-Enabled Critical Infrastructures From SAFEGUARD Intrusion Detection Test Environment.
Living Together in the Multi-cultural Society Proceedings of the 2010 EMUNI Research Souk 14 June 2010 A Sustainable Smart Grid Project for a Mediterranean.
S. Bologna, C. Balducelli, A. Di Pietro, L. Lavalle, G. Vicoli ENERSIS 2008 Milano, 17 Giugno, 2008 Una strategia per.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
© 2008 OSIsoft, Inc. | Company Confidential Smart Grid, Smart Metering and DSM OSIsoft and Cisco systems Arjen Zwaag- Cisco Martin Otterson- OSIsoft.
Frankfurt (Germany), 6-9 June 2011 Smart Grid Protection in China Wu Guopei Guangzhou Power Supply Bureau Guangdong Power Grid, China.
Introduction to IRRIIS MIT Add-On Components IRRIIS, CRUTIAL & GRID Review Meeting 15 March 2007, Brussels Sandro Bologna.
Nikos HATZIARGYRIOU – Greece – BETA SESSION 4b: Integration of RES+DG Barcelona May 2003 BETA SESSION 4b: Integration of Renewable Energy Sources.
What’s Next in Transitioning to a Modern Grid Steve Bossart, Senior Energy Analyst IEEE EnergyTech 2013 May 23, 2013 Cleveland, Ohio.
Vincenzo Artale ENEA Energy and Environment Modeling, ENEA Technical Unit (UTMEA, CR Casaccia, Rome (Italy)
IRRIIS-FP6-2005–IST-4 IRRIIS Project Overview 3rd Public IRRIIS Workshop September 6, 2007, Bonn, Hotel Königshof Erich Rome, FhG-IAIS.
FCC Field Hearing on Energy and the Environment Monday November 30, 2009 MIT Stratton Student Center, Twenty Chimneys Peter Brandien, Vice President System.
Frankfurt (Germany), 6-9 June 2011 Fabio Cazzato, Simone Botton, Marco Di Clerico – Enel Distribuzione SpA Simone Botton – Italy – Session 4 – Paper ID.
Smart Grids: Ireland’s Unique Opportunity Doireann Barry, Smart Grid Programme Manager.
Frankfurt (Germany), 6-9 June 2011 Iiro Rinta-Jouppi – Sweden – RT 3c – Paper 0210 COMMUNICATION & DATA SECURITY.
Role of Smart Grids in the Italian Energy Policy Strategy Marcello Capra General Directorate for Electricity Market, Renewables, Energy Efficiency and.
“Systematic Experimentation and Demonstration activities” IRRIIS AB Meeting Ottobrunn, 20th May 2008 Sandro Bologna ENEA.
Sandro Bologna - ENEA Workshop – AICT Roma 25 Settembre, 2008 Alcune iniziative di ricerca in.
Self-healing Architectures based on context DEpendent adaptive Software Agents (SADESA) – an extension of EU-IST Project SAFEGUARD DeSIRE Workshop Pisa,
Introduction to the IRRIIS Simulation SimCIP Césaire Beyel.
Introduction to IRRIIS MIT Add-On Components Middleware Improvement Technology for Interdependent Critical Infrastructure 08 February 2007, Rome Giordano.
MIT Communication & Risk Management Language Workshop - Middleware Improved Technology for Interdependent Critical Infrastructures 8 February 2007, Rome.
1 © A. Kwasinski, 2015 Cyber Physical Power Systems Fall 2015 Security.
MIT requirements from the TSO perspective MIDDLEWARE IMPROVED TECHNOLOGY (MIT) for increased resilience of Interdependent Critical Infrastructure ROME,
Smart Grid Schneider Electric Javier Orellana
Simulation Experiments: Emerging Instruments for CIP Dresden 5 th of October 2007 Walter Schmitz.
Internet of Things. Creating Our Future Together.
Joint Radio Company: Making the spectrum and technology work for your business Adrian Grilli Managing Director, JRC Ltd, London Technical Adviser, European.
Unrestricted. © Siemens AG All rights reserved. Open Innovation 2.0 Dr. Walter Weigel VP External Cooperations Corporate Technology I Dublin, June.
Economic Evaluation Program for Transmission Planning in Competitive Power Market LEE, SANG-HO Fusion Technology Research Lab. K-EMS Development.
Smart Grid PRESENTED BY: ZUBAIR AHMAD
MULTI-MICROGRIDS AS A SMART STRUCTURE Carlos Moreira Ciência 2010 –
A smart grid delivers electricity from suppliers to consumers using two-way digital technology to control appliances at consumers' homes to save energy,
This module will dig deeper into Smart Grid implementation issues. It will focus on two key issue of particular interest to the PNW: 1)How the Smart Grid.
Eric Peirano, Ph.D., TECHNOFI, COO
Évora demonstrator site
Eric Peirano, Ph.D., TECHNOFI, COO
Évora Demonstrator Site
WG1: RELIABLE, ECONOMIC AND EFFICIENT SMART GRID SYSTEM
Lorenzo Kristov, Ph.D. Principal, Market & Infrastructure Policy
Module 4 Smart Grid Implementation Issues
SMART GRID COMMUNICATIONS EMULATOR ( SYNTHETIC USERS)
Electricity Distribution and Energy Decarbonisation
Presentation transcript:

Sandro Bologna - ENEA Claudio Balducelli – YLICHRON (ENEA) Massimo Gallanti - CESI Ricerca Workshop – AICT Roma 6 Dicembre, 2007 ICT nella gestione del Sistema Elettrico: opportunità e nuovi problemi E NTE PER LE N UOVE TECNOLOGIE L’ E NERGIA E L’ A MBIENTE

Current electrical network from source-to-sink Generation Transport Distribution Loads The primary aim of an electricity supply system is to meet the customer’s demands for energy (in sufficient quantity and quality, at the required time and at an acceptable price)

Current Structure of the Electrical System in Europe Transmission National / International Subtransmission Regional Low Voltage Distribution System

National Control Center TCI RTU Optical Fibre Current Electrical Network Management Regional Control Center

Change of energy market environment, e.g. globalization, competition Business process optimization, e.g. new communication channels, Web Pressure on prices and cost together with the trend to more automation Increased value of information, especially with regard to real-time information Stronger customer focus Technology innovation 1st revolution: Open Energy Market Generation company Transmission company Subsidiary Trader Distribution company Business processes Communication kWh Power exchange Local generation Service provider

Distribution Systems Clients Transmission System Generators Qualified Clients IPP Trading Companies Market Operator System Operator Private Communications Network Public Communications Network Growing Interdependencies between Electrical and Telecommunication Systems in the Open Energy Market Operational Planning Real time Control Energy Management

2nd revolution: Distributed Generation The increasing diffusion of Distributed Generation (DG) makes the distribution networks to evolve:  from a mainly passive structure,  toward an active model, very similar to the current transmission networks

Smart Grid: The Vision  Coordinated, local management and full integration of Distributed Generation DG and Renewable Energy Resource RES with large scale central power generation  Extensive small generation connected close to end customers  Flexible, optimal and strategic grid expansion, maintenance an operation  User specified quality security and reliability of supply for the digital age Integrated approach involving technical, commercial and regulatory issues Source: EU 2006

Integrated infrastructures for active network operation Meter storage Demand response Gx Gy Communicati on control local area 3 G2 G3 storage Demand response Meter Communicatio n control local area 2 DSO 1 Communication network G1 storage Demand response Meter Communicati on control local area 1 Bulk gen. TSO DGop n DGop 2 DGop 1 DSO n DSO 2 Information Communication control Power flow Microgrid Power grid

Addressing active network management: the CESI RICERCA approach OBJECTIVE REFERENCE INFRASTRUCTURE Experimental microgrid composed of microgenerators, dispatchable loads, and storage systems Design and experimentation of microgrids management and control functions. The following functions have been implemented: economic dispatching of generators frequency and voltage regulation pseudo islanding operation (meeting a predefined power exchange profile with the main network)

Microgrid central control storagefuel cellPV CHP DSO EMS Forecast data distribution grid & central generators electricity heat information MV network 0.4 kV local lontrol Microgrid communication channel Addressing active network management: the CESI RICERCA approach Control system of the experimental microgrid implemented at CESI RICERCA’s premises

Addressing the safety and security issue: the ENEA SAFEGUARD approach OBJECTIVE REFERENCE INFRASTRUCTURE A supervisory and control system (SCADA) of the electrical transmission network Development of a network of software components (agent oriented) to increment the survivability of information intensive critical infrastructures as the electrical transport and distribution networks, during attacks, intrusions, or anomalies caused by network instabilities.

SAFEGUARD multi-agent architecture Control system of electrical network (RTUs & Control Centers) Home LCCIs Topology agent Negotiation agent MMI agent Other LCCIs Foreign electrical networks Communication networks Correlation agent Action agent Low level agents High level agents Network state monitors Intrusion Detection wrappers Anomaly detector agents Actuators Commands and information Only information Network protection at global level Network protection at local level

Area 1 Area 2 Area 3 Substations Loads Generators Power transport network Supervisory and Control System Electrical system physical layer SIA-R CCN CCR SIA-C Remote Units Control Centers Information Network Communication Network Data concentrators IMPLEMENTATION OF SAFEGUARD TECHNOLOGIES IN THE ELECTRICAL SYSTEM RTU Event sequences checking agent Invariant checking agent Communication ports checking agent RTU state hybrid detector

ENEA Testing Platform of SAFEGUARD Technology emulation on a local network of the components belonging to a SCADA distributed system RTU 1 RTU 2 RTU 3 RTU n Electrical load-flow simulator (e-Agora) SCADA Control Center National Network Data Base (Gegional DB) Network Data Base (National DB) SCADA data exchange bus Attacks/faults Console design running log/document TEST PLATFORM Safeguard high level agents (correlator, action ect.) SCADA Control Center Regional Message “broker” Event sequences hybrid detector (Case Base reasoning) Hybrid detector for State Estimation (Checking Invariants) RTU state hybrid detector (Neural Network) Communication hybrid detector (Data Mining technique) Low Level Agents

ENEA TEST PLATFORM OF SAFEGUARD TECHNOLOGY

OBJECTIVE: REFERENCES INFRASTRUTTURES: An electrical distribution network A public voice/data tele-communication network Provide a technology (named MIT, Middleware Improved Technology) which will reduce the risk of cascading failures caused by interdependency between Large Complex Critical Infrastructures (LCCI) MIT system will support information sharing between LCCIs operators to augment their mutual situational awareness. MIT system will support negotiation and coordinated actions between neighbouring systems for the establishment of effective and optimal measures; Addressing the cascading failures issue: the ENEA IRRIIS approach

Interdependencies between Electrical and Telecommunication Networks

Overall IRRIIS MIT architecture Telecom Data Base Other Data Bases Electrical Data Base Inter LCCIs data exchange Communication Components LCCIs Data Bases & Alarm logs LCCI 1 LCCI 2 LCCI n Add-on Components

The Italian IRRIIS Scenario MANAGING “INTERDEPENDENCY” BETWEEN DIFFERENT INFRASTRUCTURES

The scenario regards the black-out occurred in Rome on January 2004 at the Italian Telecom infrastructure. The described scenario is approximate and refers to subsystems that caused the interruption of the Telecom services that are critical for the ACEA distribution system operators. The main power supply is normally furnished by the service (1) produced by the National power network or, alternatively, by a backup emergency diesel generator (2). A second backup power supply is guaranteed by the battery packs (3), but in this case the power reserve may decrease quickly. Telecom Rome nodeAcea Power Supply Telecom users ACEA Control Centers Generic users Fiumicino Airport operations The Italian IRRIIS Scenario

MIT components Telecom MIT components Electricity Local attacker Telecom Telecom network simulation Power backup simulation Electrical network simulation Local attacker Electricity Global attacker SCADA emulation Test Bed communication channel Local LAN Additional analysis tools Experimentation GUI Logger Local LAN Experimentation Archive MIT communication channel Electricity monitoring panel Experimentation SERVER Telecom monitoring panel View of the IRRIIS Test Bed at ENEA

Conclusions and R&D challenges More than 50% of the electrical load is highly dispersed Increasing part of generation is becoming dispersed Energy market is always more open and interconnected Increasing penetration of ICT for “better” control Improve monitoring information flow issues Distributed control algorithms and models issues Reliability/safety/security issues Inter-dependencies issues Trans-border issues