Johannes Whittam (University of Cambridge). Transitional TentsContents Introduction & Background Calculations and Modeling Testing & Results Failure 6.

Slides:



Advertisements
Similar presentations
Cold Analysis of Disc-Loaded Circular Waveguides for Wideband Gyro-TWTs Vishal Kesari Centre of Research in Microwave Tubes.
Advertisements

What should you think about when deciding where to put your building? The direction a building faces will impact on a lot more than the view – how do you.
J.B. Speed School of Engineering University of Louisville KEEPS Energy Management Toolkit Step 2: Assess Performance & Opportunities Toolkit 2J: Building.
Manitoba School Bus Pre-Trip Inspection
Design of Steel and Composite-Structures for Seismic Loading – Safety Requirements, Concepts and Methods – Prof. Dr.-Ing. Ekkehard Fehling, University.
Introducing TG20:13 Terry Roberts, CADS
Heavy Concrete Construction Formwork
Solent University Research for Oxfam, Sheltercentre and others.
[[Click on topic to view page]]
Engineering Terms Engineers design all structures with enough strength to withstand the force and load that will be placed upon them. Generally loads are.
Focus Coil Update Roy Preece / Tom Bradshaw / Mike Courthold STFC – RAL VC 17 th Jan 2013.
Digital Counter Training Video’s & Instructions. Contents: Digital Counter Components Step 1: How to assemble the Digital Counter Step 2: How to attach.
Undergraduate seismic design competition EERI Student Chapter – Rice University Topic #1: Basic Earthquake Engineering Concepts.
Shelter Meeting 09b is hosted by UNHCR 16:00 – 16:05Introduction to projects Agreement of agenda 16:05 – 16:30Progress update Invitation to join project.
4 - 5 May 2006 | Geneva | hosted by IFRC Shelter Module update Jérôme Michon MSF-B Tom Corsellis Shelter Centre followed by: Guatemala, Bangladesh and.
清华阳光 TSINGHUA SOLAR JB Series Solar Water Heater Assembly Manual Tsinghua Solar Ltd. Yangfang County, Changping District, Beijing, , China Tele:
An Experimental Investigation of Turbulent Boundary Layer Flow over Surface-Mounted Circular Cavities Jesse Dybenko Eric Savory Department of Mechanical.
Enhancing Reliability through HALT.  Introduction to HALT  Benefits of HALT  The HALT process.
Final Report Terminal X McCarran International Airport.
Two-Phase Heat Transfer Laboratory Texas A&M University Experimental Study of Condensation on Micro Grooved Plates R. Barron-jimenez, H. Y. Hu, G. P. Peterson.
Home Depot Windows Autumn Glenn Phil Harris ME 340 – Winter 2009.
Calculating the Conductive Coefficient of Acrylic Plastic Can we actual use the stuff Dr. Solovjov taught us? Nathan Rhead Mike Tricarico.
Globally distributed evapotranspiration using remote sensing and CEOP data Eric Wood, Matthew McCabe and Hongbo Su Princeton University.
A Heat Transfer Investigation of Sleeping Bags
First conceptual design 3D Side view Arch supporting the structure.
Properties of Air. Background Weather is affected by the unique properties of air. These properties include: Air has mass and volume Air expands to fill.
Day 2 by 15th - 16th of November 2007 | Geneva | hosted by NRC 09:00 – 09:20 09:20 – 09:30 09:30 – 10:10 10:10 – 10:30 10:30 – 11:15 11:15 – 11:30 11:30.
Host SDC/SHA May 2005 introduction project focuses on the design and deployment of warm climate emergency shelter for a family of 6 people latest.
Preparatory Seminar for STL Examination By Dr. James Lau, BBS JP.
Thomas Zurbuchen University of Michigan The Structure and Sources of the Solar Wind during the Solar Cycle.
ARCH-432 Vapor Retarders and Air Barriers Attendance In what modern day country was the first cavity wall developed and used? For what purpose? A. Spain.
LOCKWOOD PLACE BALTIMORE, MARYLAND Monica Steckroth- Structural Option.
Demonstrating a Home Under Construction Purpose: To use your knowledge of the construction process and production USPs to influence the sales process and.
Kenneth G. Langone Athletic and Recreation Center Kyle Oberdorf Structural Option Thesis April 2007.
CE415 Spring (3) 1-Hour Exams (Wednesdays: 4 th, 8 th, 12 th weeks)
Introduction Connected to existing Benton Hall via skywalk Size: 103,154 SF above grade on 4 levels 82,661 SF below grade parking on 3 levels Cost: $23,651,159.
Hoan Bridge Failure Analysis Hoan Bridge Failure Analysis Wisconsin Department of Transportation City of Milwaukee, WI December 13, 2001 City of Milwaukee,
UNHCR/InterWorks - Emergency Management Training Session 6.4. Assessment 2: Working with Sectoral Indicators - Sites and Shelters Corbis.
The 5th Tongji-UBC Symposium on Earthquake Engineering
Structural option for the Jinping neutrino central detector Contributor : Yuanqing Wang, Zongyi Wang Speaker : Zongyi Wang Department of civil engineering,
About Us Our vision is to eradicate poverty housing worldwide We are motivated by our Christian faith We work by empowering local communities to solve.
PowerPoint ® Presentation Unit 52 Thermal Insulation and Other Insulating Methods Thermal Insulation Exterior Insulation and Finish Systems (EIFS) Roof.
T-Stub Connection Component Tests James A Swanson and Roberto T Leon School of Civil and Environmental Engineering Georgia Institute of Technology Atlanta,
1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA TENTS.
Villanova University Dept. of Civil & Environmental Engineering CEE 3704 Statistical and Numerical Analysis 1 Group Project #2 Energy Dissipation Capacity.
1 BEAM-COLUMNS PROF. V. KALYANARAMAN Department of Civil Engineering Indian Institute of Technology Madras Chennai
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l Requirements l Environment l Design l Structural Integrity l Preparation l Installation.
Thursday 2 December 2010Shelter meeting 10b is hosted by OCHA Transitional Shelter Guidelines Tom Corsellis: Shelter Centre.
RFQ 3Dtree Space Charge Studies Simon Jolly 6 th June 2012.
Capital Insight Pty Limited ABN Berry Street North Sydney NSW 2060 t f Strategic Risk.
Robo – Boogie By: Kyle Kempka Kyle Kaesburg Patrick Slavic.
3 STUDENT ASSESSMENT DEPARTMENT
Internal Guide : Batch No : 4 Mrs.Punyavathi Madam
SECTION 8 - RACKING (BRACING) AND SHEAR FORCES STUDENT HANDOUT
Comparative analysis of insulations located horizontal on the floor and/or vertical beside the foundation both winter and summer conditions Péter MEDGYASSZAY.
LEVEL 4 Air Pressure Testing
AN-NAJAH NATIONAL UNIVERSITY BUILDING DEPARTMENT
ASHRAE Annual Conference 2014 July 2, 2014
Date of download: 12/26/2017 Copyright © ASME. All rights reserved.
Stress Analysis Service Provider & BIM Service
Stress Analysis of Universal Tilt Kit Attachment Points
LCLS Injector: Introduction D. H
Thermal Energy By: Lauren Robinson. HEAT Heat is the flow of thermal energy or energy in transit. It transfers from a warm object to a cold object. Transfer.
Refugee Housing Unit PROJECT PRESENTATION IN SHELTER CENTRE
UNIT-V ELEMENT OF BUILDINGS.
REFUGEE HOUSING UNIT RESEARCH AND DEVELOPMENT PROJECT
Introduction The Gamma Bracing System
Longitudinal Tunnel Ventilation and the Fire Throttling Effect
Civil Engineering and Architecture
Introduction The Gamma Bracing System
Presentation transcript:

Johannes Whittam (University of Cambridge)

Transitional TentsContents Introduction & Background Calculations and Modeling Testing & Results Failure 6 Conclusions 2 Areas for Further Work Questions

Transitional Tents Introduction Calculations & Modeling Testing & Results Failure 6 Conclusions Further Work Questions Previous Work 2000 –Assessing the Thermal Performance of an Emergency Shelter (C A Crawford) 2001 – Thermal Performance of a liner for a UNHCR tent (R Battilana) 2003 –Investigation into Heat Loss in Cold Climate Emergency Shelters: Development of an Occupancy Model and Infiltration Testing (C Grisaffi) 2003 – Ground effects on Thermal Performance of a Transitional Tent(R Youlten) 2004 –Specificaitons and Design of a Transitional Tent(A Pepper) 2005 –Design and Analysis of an Unbraced Portal Frame Transitional Tent (H Travers) 2007 – Field Investigation, Design and Analysis of a Braced Portal Frame Transitional Tent (M Moynihan) 2008 – Cold Climate Temporary Shelter (M Segar)

Transitional TentsProcurement Specification  A procurement specification for a Transitional Tent was produced by Shelter Centre for DFID by the end of Introduction Calculations & Modeling Testing & Results Failure 6 Conclusions Further Work Questions

Transitional TentsModeling Introduction Calculations & Modeling Testing & Results Failure 6 Conclusions Further Work Questions

Transitional TentsModeling Introduction Calculations & Modeling Testing & Results Failure 6 Conclusions Further Work Questions

Transitional TentsModeling The addition of lightweight sheeting reduces the forces applied to the frame as it eliminates this effect. Introduction Calculations & Modeling Testing & Results Failure 6 Conclusions Further Work Questions

Transitional TentsTesting Introduction Calculations & Modeling Testing & Results Failure 6 Conclusions Further Work Questions

Transitional TentsTesting Introduction Calculations & Modeling Testing & Results Failure 6 Conclusions Further Work Questions

Transitional TentsTesting Introduction Calculations & Modeling Testing & Results Failure 6 Conclusions Further Work Questions

Transitional TentsTesting Strain Gauges Inclinometer Battery Packs Inclinometers Inclinometer Bracket Inclinometer Transmission Units Introduction Calculations & Modeling Testing & Results Failure 6 Conclusions Further Work Questions

Transitional TentsTesting Inflated Bag Data Logger and Laptop (Inclinometer Output) Strain Gauges & Inclinometers (inside) Tube for pressure reading Introduction Calculations & Modeling Testing & Results Failure 6 Conclusions Further Work Questions

Transitional TentsResults Introduction Calculations & Modeling Testing & Results Failure 6 Conclusions Further Work Questions

Transitional TentsResults Eave should buckle at 25ms -1 Force 9 on the Beaufort Scale This is not the most critical failure mode – uplift is Introduction Calculations & Modeling Testing & Results Failure 6 Conclusions Further Work Questions

Transitional TentsFailure Introduction Calculations & Modeling Testing & Results Failure 6 Conclusions Further Work Questions

Transitional TentsFailure Failure 1 Failure 2 Wind Introduction Calculations & Modeling Testing & Results Failure 6 Conclusions Further Work Questions

Transitional TentsFailure 1 Introduction Calculations & Modeling Testing & Results Failure 6 Conclusions Further Work Questions

Transitional TentsFailure 2 Introduction Calculations & Modeling Testing & Results Failure 6 Conclusions Further Work Questions

Transitional TentsRecommendations/Improvements Introduction Calculations & Modeling Testing & Results Failure 6 Conclusions Further Work Questions ①Porch ②Floor Beams ③Bracing -Coming Undone -Both Bays ④Hole Alignment ⑤Joining Method ⑥Peg Loops

Transitional TentsRecommendations/Improvements Porch and cavity significantly increase uplift forces Introduction Calculations & Modeling Testing & Results Failure 6 Conclusions Further Work Questions

Transitional TentsRecommendations/Improvements ①Porch ②Floor Beams ③Bracing -Coming Undone -Both Bays ④Hole Alignment ⑤Joining Method ⑥Peg Loops Introduction Calculations & Modeling Testing & Results Failure 6 Conclusions Further Work Questions

(Please Find the video attached on the shelter Centre website where this presentation was found) Recommendations/Improvements – Floor Beams Introduction Calculations & Modeling Testing & Results Failure 6 Conclusions Further Work Questions

Transitional TentsRecommendations/Improvements – Floor Beams Introduction Calculations & Modeling Testing & Results Failure 6 Conclusions Further Work Questions

Transitional TentsRecommendations/Improvements ①Porch ②Floor Beams ③Bracing -Coming Undone -Both Bays ④Hole Alignment ⑤Joining Method ⑥Peg Loops Introduction Calculations & Modeling Testing & Results Failure 6 Conclusions Further Work Questions

Transitional TentsRecommendations/Improvements Existing: Recommended: Or, even better: Introduction Calculations & Modeling Testing & Results Failure 6 Conclusions Further Work Questions

Transitional TentsRecommendations/Improvements ①Porch ②Floor Beams ③Bracing -Coming Undone -Both Bays ④Hole Alignment ⑤Joining Method ⑥Peg Loops Introduction Calculations & Modeling Testing & Results Failure 6 Conclusions Further Work Questions

Transitional Tents Introduction Calculations & Modeling Testing & Results Failure 6 Conclusions Further Work Questions Recommendations/Improvements - Bracing

Transitional TentsRecommendations/Improvements ①Porch ②Floor Beams ③Bracing -Coming Undone -Both Bays ④Hole Alignment ⑤Joining Method ⑥Peg Loops Introduction Calculations & Modeling Testing & Results Failure 6 Conclusions Further Work Questions

Transitional TentsRecommendations/Improvements – Hole Alignment Introduction Calculations & Modeling Testing & Results Failure 6 Conclusions Further Work Questions

Transitional TentsRecommendations/Improvements ①Porch ②Floor Beams ③Bracing -Coming Undone -Both Bays ④Hole Alignment ⑤Joining Method ⑥Peg Loops Introduction Calculations & Modeling Testing & Results Failure 6 Conclusions Further Work Questions

Transitional TentsRecommendations/Improvements – Joining Method Introduction Calculations & Modeling Testing & Results Failure 6 Conclusions Further Work Questions

Transitional TentsRecommendations/Improvements ①Porch ②Floor Beams ③Bracing -Coming Undone -Both Bays ④Hole Alignment ⑤Joining Method ⑥Peg Loops Introduction Calculations & Modeling Testing & Results Failure 6 Conclusions Further Work Questions

Transitional Tents Introduction Calculations & Modeling Testing & Results Failure 6 Conclusions Further Work Questions Recommendations/Improvements – Peg Loops

Transitional TentsFurther Work  Future students from Cambridge University Engineering Department will continue the project.  Foundation Design  Further Testing Introduction Calculations & Modeling Testing & Results Failure 6 Conclusions Further Work Questions

Transitional TentsQuestions Conclusions: ①Porch ②Floor Beams ③Bracing -Coming Undone -Both Bays ④Hole Alignment ⑤Joining Method ⑥Peg Loops Introduction Calculations & Modeling Testing & Results Failure 6 Conclusions Further Work Questions Tent Rating: 25ms-1 provided properly secured Further Work: -Foundation Design -Thorough Testing Questions?