Financial Management for Senior Public Sector Officials Group 4 Final Course Project Preparation on PESCO (Sub-Project) Energy Loss Reduction Presenters:

Slides:



Advertisements
Similar presentations
Internal Analysis.
Advertisements

Overview of tariff revision process under Regulatory Commission Prayas - EGI Skill-share workshop for Tajikistan and Kyrgyzstan Delegates November 16-18,
Madras Chamber of Commerce & Industry and India Energy Forum Session on Rationalisation of Electricity Tariffs Anand Madhavan Head – Energy & Urban Infrastructure.
Understanding Financial Reports and the Income Statement Chapter 2.
Finance for Non-Financial Managers I Review of Basic Terms Asset/liability: An asset is an economic resource that a company owns. A liability is a resource.
6 - 1 Benefits of Budgeting Essentials of Effective Budgeting Master Budgetster Budget Budgeted Income Statement Cash Budget BudgetingBudgeting in a nonmanufac-
COMPETITIVE DISTRICT HEATING L.GEORGIEVA BULGARIA.
1 Georgian National Energy and Water Supply Regulatory Commission Tariff Regulation Gocha Shonia Department of Methodology and informational provision.
1 The Trading Profit and Loss Account Higher Grade Business Management 2009.
Financial Accounting 1 Lecture – 39 Solution Beta (Private) Limited Balance Sheet As At June 30, 2002 ParticularsNoteAmount Rs. Fixed Assets at WDV1 Current.
Heber Light & Power 2014 Budget/Forecast Review - Midyear.
Loss Reduction and CDM at Gubbi Substation Energy Economy & Environmental Consultants Bangalore INDIA.
Cost of Service Indiana Industrial Energy Consumers, Inc. (INDIEC) Indiana Industrial Energy Consumers, Inc. (INDIEC) presented by Nick Phillips Brubaker.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
1 United States Agency for International Development (USAID) National Association of Regulatory Utility Commissioners (NARUC) Sponsored.
Technical Conference on Net Metering Load Research Study November 5, 2014.
Profit and Loss Account
FINAL ACCOUNTS OF A SOLE TRADER
Pro Forma Income Statement Projected or “future” financial statements. The idea is to write down a sequence of financial statements that represent expectations.
Financial Accounting 1 Lecture – 40 Question Following trial balance has been extracted from the books of Alpha Ltd. as on June 30, You are required.
Management and Organisation of Electricity Use Electrical System Optimisation Belgrade November 2003.
1 Calculating the profit or loss of a business. * Profit (what it is and why it matters) * Purpose and main elements of profit/ loss account All students….
Analysis of ARR & Tariff Proposal of SOUTHCO for FY February 10, 2011 By World Institute of Sustainable Energy (Consumer Counsel)
Presentation at DERC Public Hearing in the matter of ARR for F.Y filed by Distribution Companies in Delhi by N. Ponrathnam 6/2/20161.
1 Electricity Industry – Municipal Tariff Issues and NERSA Approval Processes Compiled by Nhlanhla Ngidi.
1 PRESENTATION ON Financial Issues & Business Plan FY 2011 PAKISTAN POWER SECTOR.
CLARION UNIVERSITYCLARION UNIVERSITY FINANCIAL UPDATE ANDFINANCIAL UPDATE AND FY 2016 BUDGET REVIEWFY 2016 BUDGET REVIEW COUNCIL OF TRUSTEESCOUNCIL OF.
1 Analysis of OPTCL’s ARR and Transmission tariff for FY By: World Institute of Sustainable Energy, Pune (Consumer Counsel) 4 th February, 2011.
Quarterly Performance Report For the period October – December 2014.
HOMEWORK Review Questions Bank Accounting
Analysis of ARR & Tariff Proposal of NESCO for FY February 09, 2011 By World Institute of Sustainable Energy (Consumer Counsel)
Queries raised by Director (Tariff) on ARR and Tariff Application of OPTCL for FY on
Queries raised by Director (Tariff) on ARR and Tariff Application of OPTCL for FY on
PROF. MS. TRUPTI NAIK Accounting Terms (Semester I)
1 Briefing on The Procedure & Principles of Awarding Distribution Tariffs NATIONAL ELECTRIC POWER REGULATORY AUTHORY (NEPRA)
Talha Mehmood Chapter # 5 TARIFF. Introduction The electrical energy produced by a power station is delivered to a large number of consumers. The supply.
Accounting. Introduction  What is Accounting?  What is the need for maintaining books of account?  Compulsory maintenance of books of account u/s.44AA.
Power Sector Reforms Workshop NOV FESCO JURISDICTION.
UBC report to Faculty Senate January 25, 2011 Sources of information: ECU annual financial reports:
Handout Manajemen Keuangan
DISTRICT AUDITING UPDATE INDIRECT COST AND TIME DISTRIBUTION Melissa A. Austin, Audits Manager SC State Department of Education Office of Finance District.
1 Implementation of Off-Grid Policy in the state of Maharashtra By H M Kulkarni General Manager (R.E) Maharashtra Energy Development Agency Date 17 th.
Financial Report through Q4 FY2014 Preliminary Year-end Results December 3, 2014.
Energy Regulatory Authority (ERA) of Mongolia Mr.Tumentsogt Tsevegmid, MSc, MPA Regulator, Energy Regulatory Authority University Street 2A, Ulaanbaatar.
The Master Budget and Responsibility Accounting Chapter 23.
City of East Point FY 2012 Budget Presentation. Comparison of FY11 vs. FY12 Budget Policies Proposal FY 11 TotalFY12 O&M Changes FY11 Current Budget 94,652,326.
Electricity Basket Price & 2013 Power Policy Hammad Hashmi Advisor Technical (USAID) MWP.
BGE Smart Grid Initiative Stakeholder Meeting September 17, 2009 Wayne Harbaugh, Vice President, Pricing and Regulatory Services.
Republic of the Union of Myanmar Electricity Sector Financial and Regulatory Issues 18 May 2016 by Myanmar Energy Team The World Bank.
Incentives For Use Of Renewables
Advanced Financial Accounting FIN-611
Hartek Group is one of India’s fastest growing company with offerings that span across Engineering, Renewables, Technology , Construction , Fuel and Manufacturing.
Fixed Assets Fixed assets are those assets: that have a long life,
Transmission and Distribution Loss Study
Ian Alexander Wednesday, August 13th 2003 SAFIR MYT Workshop, Delhi
FINANCIAL INFORMATION
FINAL ACCOUNTS With adjustments
Homework Ch 12 Electricity Regulation
Queries raised by Director (Tariff) on ARR and Tariff Application of CESU for FY on
Island Energy Advisory Committee Board
Financial Analysis Quick ratio: ($22,000+ $41,500)/
City of Lebanon, Missouri Electric Department
INTRODUCTION OF PITE In 1993 it started as Open Learning College under the Teacher Training Project (TTP) Asian Development Bank . In 1997 Provincial Institute.
Trial Balance As On January 31, 20--
Concepts and Objectives of Cost Accounting
Lecture 1 Question Following trial balance has been extracted from the books of Alpha Ltd. as on June 30, You are required to prepare the profit.
PESHAWAR ELECTRIC SUPPLY COMPANY RTC PESCO CHARSADDA R.T.C PESCO CAPACITOR (VOLTAGE IMPROMENT DEVICE)
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
Island Energy Advisory Committee Board
Opportunities for Local Energy
Presentation transcript:

Financial Management for Senior Public Sector Officials Group 4 Final Course Project Preparation on PESCO (Sub-Project) Energy Loss Reduction Presenters: Ansar Ali Noor Farrukh Latif Adil Rehman Farooqi Hassan Ali Din Mohammad

Afghanistan N Mardan BANNU` TESCO Karak Tank DIKhan Lakki Dargai SWAT Mingora T/Gara A/Abad-1&2 AJK HAZARA Batagram Swabi Hangu KHYBER NSR PESH S/Qdr CHD Chitral Haripur-1& 2 Mansehra-1 & 2 Kohat Upper Dir Bunair Northern areas Name ofNo. of Circle Consumers Hazara Swat Peshawar Bannu Mardan Khyber PESCO AREA OF JURISDICTION 2

Category wise consumers and units billed For Financial Reporting Purposes PESCO Category wise consumers and united billed have been shown in the following slide. Domestic, Commercial, Industrial, Tubewells, Bulk (like LUMS),Others (street lights etc.)

Category Wise Consumers & Units Billed Category No. of Consumers Ending 01/12 Units Billed (Million) Ending 01/12 Dom Coml Indl T/ Well Bulk Others Total Consumers Units Billed 4

Energy Loss Reduction Potential savings = units purchased at current efficiency – units purchased at targeted efficiency We quantify benefits in monitory value = Potential savings in units x Power Purchase Price Example: Suppose PESCO purchases current efficiency = 100,000 units Target efficiency (after system rehabilitation) = 90,000 units Difference (potential savings) = 10,000 units Power Purchase Price in Rs. = 5.86 Savings in Rs.=58,600

Rs. In Million Particulars (Audited) (Audited) (Audited) (Audited) (Audited) (Audited) (Projected) Average Sale Rate (Rs./ kwh) Sales 23,09234,58344,64152,83966,09371,866125,813 Cost of sales 30,73034,46646,86255,23175,27581,086110,665 Gross Profit/(Loss) (7,638)117(2,221)(2,392)(9,182)(9,219)15,148 Other Operating Expenses 5,8976,2558,5179,0799,18510,71215,061 Other Income 2,1282,6232,6713,3273,7893,8332,258 Profit/(Loss) for the year (11,407)(3,515)(8,068)(8,125)(14,578)(16,099)2,345 Accumulated Profit/(Loss) (29,370)(32,884)(40,952)(49,077)(63,656)(79,755)(77,410) 6 PRESENT FINANCIAL STATUS

Budget Comparison FY Particulars NEPRA Determination PESCO Requirements Variance Salaries Wage & Benefits5,2846,608(1326) Maintenance402679(277) Traveling Expenses97150(53) Vehicle Running Expenses103178(75) Other Expenses351567(216) O&M Cost (1947) Provision of Bad Debts (1858) Depreciation1,2151,311(96) Returns on Fixed Assets (781) Total10,03314,715(4682) Less Other Income3,962 0 Total D.M607110,753(4,682) Units Sold7,8876, Average DM RS/Kwh (0.78) 7 Rs In Million

8

Authority in its determination assumed that PESCO has earned revenue of Rs. 27,490 million in 1 st Quarter of FY by using tariff of Rs /Kwh & Rs /Kwh of FY on the basis of actual purchases and targeted sales, as a matter of fact Tariff of FY and FY were not implemented due to stay orders issued by Islamabad High Court and Peshawar High Court. PESCO was charging Tariff of Rs per Kwh from its consumers during this period and was claiming subsidy from GOP on the notified Tariff of FY & FY JUSTIFICATION OF LOSSES FY

Governance and Controls of PESCO All the distribution Companies are regulated by NEPRA. However, BOD approve the CAPEX and Operating Budget as well as Losses target for each sub-division of PESCO. Communication gap while setting targets between NEPRA and BOD of PESCO. Resultantly, PESCO is unable to achieve their fiscal projections.

CORRECTIVE MEASURES TO OFFSET LOSSES Transmission of power on higher voltages in Primary & Secondary Grid Systems.  Construction of new 220/132KV Grid Stations to reduce 132KV T/Line. Proposed New 220KV GSS - Chakdara - DIK - Mansehra - Nowshera - Kohat  Construction of new Grid Stations to reduce the length of 11KV distribution feeders. (53 Nos. Grids Cost Rs.12.5 Billion).  Conversion of 33KV & 66KV Voltage Systems to 132KV Systems. (Cost Rs.5.0 Billion)  Rehabilitation of Grid System & Capacitors installation at Grid Stations. (Cost Rs.3.5 Billion)  Bifurcation and rehabilitation of 11KV Distribution System and Capacitors installation.(Cost Rs.2.5 Billion)  Total Feeders682 No.  Feeders for bifurcation/rehabilitation250 No.  Av. cost per KMRs.10.0 Mln  Construction of 11KV lines to Minimize LT (400 Volts) System. (Cost Rs.20.0 Billion)  Length of lines20000 KM  Cost per KMRs.1.0 Mln 11