BLM Legacy Wells Environmental Hazards & Eyesores.

Slides:



Advertisements
Similar presentations
NOTICE TO OPERATORS DRILLING WELLS WITHIN 3/4 MILE OF THE RIM OF THE ROAN PLATEAU IN GARFIELD COUNTY PIT DESIGN, CONSTRUCTION, AND MONITORING REQUIREMENTS.
Advertisements

Underground Storage Tanks at Duke Duke Medical Center –8 permitted USTs located on medical campus –Range in size from 2,000 gallons to 30,000 gallons Proper.
East Carolina University Compressed Gas Safety Training Program
Railroad Commission of Texas Victor G. Carrillo - Chairman Elizabeth A. Jones – Commissioner Michael L. Williams – Commissioner.
Step 1: Digging a Cellar On land, a majority of wells begin with digging a cellar from three to fifteen feet in depth. The purpose of a cellar is to align.
Changes to Statewide Rule 13 June, 2013 Texas Alliance of Energy Producers John Tintera, P.G. Sebree & Tintera, LLC.
Statewide Rule 10 : Downhole Commingling
Field Operations and State-Managed Plugging Overview
PETE 411 Well Drilling Lesson 17 Casing Design.
9-Point Drilling Plan 9-Point Drilling Plan. Presentation Goals To Describe a Drilling Plan That… Is in compliance with Order #1. Is in compliance with.
Control of Well Limits How Much is Enough? Presented by : Special Thanks to: G.S. Bryan & Associates, Inc. and.
Presented by Kay Smothers and Greg France Injection and Mining Division.
Chapter 3 Casing design.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Railroad Commission of Texas Railroad Commission of Texas Pipeline Safety Division Damage Prevention Program.
Part 2.2 Well Control. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand well control.
Drilling Gas Wells: Beginning to End. Seismic Exploration.
Petroleum Engineering 406
Subpart R Steel Erection
CWAG 2010 WATER LAW CONFERENCE The Broadmoor Colorado Springs, Colorado April 29 – 30, 2010.
Notices of Violation, Orders to Cease Operation and Consent Orders.
Railroad Commission March 24, 2008 Charles Ross, PE Deputy Director, Field Operations Oil and Gas Division Railroad Commission of Texas
Granite Wash Casing Profile Texas Panhandle (District 10) Western Oklahoma OKC Granite Wash Conference – March 6, 2008.
“PRODUCTION” MIDDLE EAST TECHNICAL UNIVERSITY
Inflatable DST Equipment An Overview Presentation.
EVOLUTION OF SPACING AND POOLING IN COLORADO Denver Association of Division Order Analysts July 21, 2014 Denver, Colorado Steve Sullivan Welborn Sullivan.
INFLATABLE DST EQUIPMENT
FORM 1000 – APPLICATION TO DRILL, RECOMPLETE OR REENTER.
August 14, 2001AOGCC / Jt. Committee on Natural Gas Pipelines 1 Alaska Oil and Gas Conservation Commission (AOGCC) Presentation August 14, 2001 to Joint.
COLORADO OIL AND GAS CONSERVATION COMMISSION CLASS II UNDERGROUND INJECTION CONTROL RULES AND REGULATIONS Garfield County Energy Advisory Board Thursday,
Rock Coring Obtain undisturbed samples of solid, fractured, or weathered rock formations.
BASIC DRILLING SCHOOL. COURSE OBJECTIVES During this drilling school you will get all the knowledge about drilling oil and gas wells, design requirements,
Chapter 1 RESERVOIR.
Well Testing Initial production tests at surface after wellbore cleanup and fracing. Sometimes called initial potential or IP. IP= Initial Production IPF.
RAILROAD COMMISSION OF TEXAS Horizontal Drilling Permit Applications Lorenzo Garza.
Norse Energy Corp., USA  As natural gas assumes a far more important role in America’s energy mix, Norse Energy is committed to exploring, developing,
Well Design PE 413.
After the Sanitary Survey
UTAH GEOTHERMAL Dr. R. Gordon Bloomquist, Ph.D Washington State University Energy Program Salt Lake City, Utah 20 January 2004.
Monitoring Well Post-Installation Consideration By: Pierre-Orly Dupont.
CLICK TO EDIT MASTER TITLE STYLE Railroad Commission of Texas RICK BEHAL MECHANICAL INTEGRITY TESTS ON INJECTION AND DISPOSAL WELLS (FORM H-5)
Engineering 101 Oil and Gas for Managers. Petroleum Engineering Drilling Engineering Production Engineering Reservoir Engineering.
Drilling Operations History Drake’s Well was the first commercial oil well drilled in 1859 in Pennsylvania. Cable Tool Drilling technique was used to drill.
RAILROAD COMMISSION OF TEXAS WELL COMPLIANCE FORMS AND PROCEDURES Austin Regulatory Conference September
Casing Design.
SPACING Vertical Horizontal Eric R. King Week Three September 9, 2010.
OVERVIEW OF OIL & GAS EXPLORATION, DEVELOPMENT and STATE REGULATION OVERVIEW OF OIL & GAS EXPLORATION, DEVELOPMENT and STATE REGULATION February 18, 2012.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
Petroleum Engineering 406 Floating Drilling
Location Exception Increased Density Eric R. King Week Five September 30, 2010.
Workshop on Permanent Closure of Single-Walled USTs and Funding Opportunities For Closure and Cleanup.
Kick Submited to :- Submitted by:- Er Akash Rana Devahish Yadav B.Tech IIIrd Year Petroleum Technology 1.
SPACING Vertical Horizontal Eric R. King Week Three September 8, 2011.
Guidelines for Land Clearing Presented By: SLC Environmental Resources Department.
Presentation on “ELEMENTS OF PRODUCTION ENGINEERING”
Introduction to Well Completions
Texas Inactive Well Regulations April Texas Inactive Well Regulations In September 2010, the RRC amended statewide rules 1, 14, 21, and 78 and adopted.
CASING.
INSTRUCTOR © 2017, John R. Fanchi
Cementing How it is Done
SUSTAINABLE DRILLING OF OIL & GAS WELLS
Types of Protection Introduce the module. Trenching & Excavations Continuing Education Third Quarter 2017 Session 2.
Class I Injection Well Application Issues
Factsheet: Proper Permanent Well Abandonment for Virginia Coastal Plain Wells VDH DEQ What is.
Casing Design Workshop
Comments on the National Environmental Management: Integrated Coastal Management Amendment Bill Adv Gary Birch 23 July 2013.
How Well is Your Well? UIC Class I Well Construction Standards
Coal Bed Methane Cementing Best Practices
UIC Inspection and Compliance Team
Recent UIC Class I Well Construction Issues
Presentation transcript:

BLM Legacy Wells Environmental Hazards & Eyesores

1002 Area NPR-A Legacy Wells AOGCC Jan. 27, 2012 N. Slope Oil Fields - ANWR NPR-A 0100 miles N 0 N

Status of the 136 Legacy Wells 16 properly plugged and abandoned (7 by Alaska Native Groups rather than BLM) 5 improperly plugged and not abandoned 29 not cased & partially revegetated 17 claimed to be used for temperature monitoring by USGS 17 transferred to Alaska native ownership 2 leaking greenhouse gases 50 other out-of-compliance wells

Example Problems At least 26 were left open to the atmosphere and filled with drilling mud At least 44 have wood, metal, plastic, glass, and concrete debris on site At least 17 are filled with diesel 3 can no longer be found - 1 under landslide at Colville River’s edge, 2 in lakes

Example Problems At least 2 leak greenhouse gases 29 are partially revegetated at surface but have unknown downhole conditions; some have surface clean-up issues At least 49 have metal piping sticking above ground level

Natural subsidence and snowmelt have started to obscure this site.

Primitive, rusting wellhead and wood debris

Wellhead along with wood and metal debris in a natural oil seep

Back-up slides

Alaska Regulations with which BLM Lacks Compliance 20 AAC (3) 20 AAC (a) and (b) 20 AAC (a), (b), (d), and (e) 20 AAC (b), (c), (d), (e), (f), and (g)

20 AAC (3) The operator of a well shall file with the commission, within 30 days after completion, abandonment, or suspension of the well and within 30 days after completion or plugging of a well branch, if occurring at a different time, a complete well record on the Well Completion or Recompletion Report and Log (Form ), including the tests required by this chapter and a summary of daily well operations reporting drilling depths, abnormally geo-pressured strata, lost circulation and other hole difficulties encountered, simulated kick drills, mud weight, and a brief description of principal items of work done, such as running and cementing casing, drill stem tests, BOP tests, coring, sidewall sampling, and logging...

20 AAC (a)... If the owner is the landowner, all wells that have been permitted on a property by 20 AAC must be abandoned within one year following permanent cessation of the operator’s oil and gas activity within the field where the wells are located or according to an abandonment schedule approved by the commission, unless the wells are earlier abandoned for safety reasons.

20 AAC (b) A well drilled onshore or from a fixed offshore platform must be abandoned before removal of the drill rig unless the well is completed as an oil, gas, or service well or is suspended, or unless well operations are shut down in accordance with 20 AAC

20 AAC (a) If allowed under 20 AAC , an operator may apply to the commission under this section to approve the suspension of a well or to renew the approval of the suspension of a well. The operator must state the reasons the well should be suspended, and not completed or abandoned, and must demonstrate to the commission’s satisfaction that (1) the well (A) is mechanically sound; (B) will not allow the migration of fluids; (C) will not damage freshwater or producing or potentially producing formations; (D) will not impair the recovery of oil or gas; (E) is secure, sage, and not a threat to public health; and (F) is in compliance with all provisions of AS 31.05, this chapter, and any order, stipulation, or permit issued by the commission; (2) the well (A) has future utility as an exploratory, development, or service well; (B) is a viable candidate for redrilling; or (C) is located on a pad or platform with active producing or service wells.

20 AAC (b) An Application for Sundry Approvals (Form ) must be approved by the commission before operations to suspend a well commence, except that oral approval may be requested under 20 AAC (b). In addition to meeting the requirements of (a) of this section, the application must include the following: (1) wellbore diagrams illustrating the current and proposed mechanical configurations of the well; (2) information on abnormally geo-pressured or depleted strata; (3) a description of the proposed work plan, including how the integrity of existing and proposed plugs will be demonstrated.

20 AAC (d) The operator of a suspended well shall maintain the integrity and safety of the well and surrounding location and clear the location in accordance with 20 AAC (a)(2) or (b) or with 20 AAC 172(c)(2) or (d), as applicable.

20 AAC (e) For a well suspended before January 1, 2009, the operator shall inspect the well site before September 30, For a well initially suspended on or after January 1, 2009, the operator shall inspect the well site within 12 months after the date of suspension. For a well suspended under this section, subsequent inspections shall be conducted within 24 months before Septmener 30 of every calendar year ending in 0 or 5, excdpt that a suspended well is not required to undergo a subsequent inspection under this subsection if the initial inspection under this subsection occurred within the prior 24-month period. For all inspections under this section, the operator shall provide the commission notice at least 10 days before the inspection and the opportunity for commission inspectors to accompany the operator on the inspection tour. If convenient for the commission, shorter notice periods may be accepted.

20 AAC (b) Plugging of a well must include effectively segregating uncased and cased portions of the wellbore to prevent vertical movement of fluid within the wellbore....

20 AAC (c) Plugging of cased portions of a wellbore must be performed in a manner that ensures that all hydrocarbons and freshwater are confined to their respective indigenous strata and are prevented from migrating into other strata or to the surface.....

20 AAC (d) Plugging of the surface of a well must meet the following requirements: (1) by the displacement method, a cement plug at least 150 feet in length, with the top of the cement no more than five feet below original ground level onshore, or between 10 and 30 feet below the mudline datum offshore, must be placed within the smallest diameter casing string; (2) either (A) all annular space open at the surface onshore, or in communication with open hole and extending to the mudline datum offshore, must be plugged with cement to seal the annular space in a manner satisfactory to the commission; or (B) all casing interior to the surface casing must be recovered to a depth of 100 feet or more below the original ground level onshore or the mudline datum offshore and the casing stubs plugged with cement as provided in (c)(2)(A) of this section; if the cement plug is extended to within the distance from the surface specified in (1) of this subsection, the requirment of (1) of this subsection need not be met.

20 AAC (e) Cement used for plugging within zones of permafrost must be designed to set before freezing and have a low heat of hydration.

20 AAC (f) Each of the respective intervals of a wellbore between the various plugs must be filled with fluid of sufficient density to exert a hydrostatic pressure exceeding the greatest formation pressure of permeable formations in the intervals between the plugs at the time of abandonment.

20 AAC (g) Except for surface plugs, the operator shall record the actual locaation and integrity of cement plugs, cement retainers, or bridge plugs required by this section....