Maintenance and Accelerator Support RHIC run10. Last Wednesday: Nice recovery Nice recovery Good work all especially: Good work all especially: HP, RF,

Slides:



Advertisements
Similar presentations
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Advertisements

Maintenance and Accelerator Support RHIC Run 12. RHIC species change completed: Major works in RHIC: Major works in RHIC: Power supply reconfigure (DO.
WAO Travis Shrey RHIC Machine Specialist Collider-Accelerator Dept Brookhaven National Laboratory 10/30/2014.
Outages During the Run Coping with the Power Company August 9, 2012.
Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
KICKOFF AS PRESENTED 6/17/11, SEE THIS WEEKS SCHEDULE FOP THE LATEST UPDATE Shutdown Shutdown ‘11.
Accelerator Support and Maintenance Run 14. Maintenance/Changeover Day Major efforts RHIC: Major efforts RHIC: Access hrs. Access hrs.
Accelerator Support and Maintenance Run 14. Maintenance Tomorrow Major efforts RHIC: Major efforts RHIC: Access hrs. Access hrs. RA.
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
RHIC shut-down work 2011 Wolfram Fischer 18 October 2011 RHIC Planning Meeting.
1 Hall A Update Thia Keppel APEX Collaboration Meeting April 2015.
Scientific Goals: V. Litvinenko’s RHIC retreat talk Commissioning Goals: I. Pinayev presentation last week Run 14 Goals: Complete assembly of 112 MHz SCRF.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
Maintenance and Accelerator Support RHIC Run 12. Accelerator Status: Complex is running for Physics. Complex is running for Physics. Checkout for NSRL.
HERA Week 50 Nov-Dec Running Shut-down at the end of the year Startup in January January-February Running.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
PIP Update Feb 20 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
Shutdown 2012 ES&H Friday April 27, 2012J. Anderson Jr. Page 1 Draft Schedule Beam off to Experiments 0000 Monday April 30 th Linac continues operations.
1 Availsim DRFS and klyClus setup, assumptions, questions Tom Himel August 11, 2009.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
October 4-5, Status of ARRA funded AIPs Electron Lens Scope, Cost, and Schedule Wolfram Fischer October 4, 2010 Electron Lens.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
RHIC Status Haixin Huang Time Meeting 01/18/2011.
Machine-Experiments January 19, 2005 Machine status.
Injector PP Setup Plan and Status November 18, 2008 Haixin Huang.
G 0 Coordinator Update & “To-Do List” Joe Grames William & Mary, June 5-6, 2006  Hall C Beam Line Tasks  Accelerator Preparation Tasks  Beam Halo 
Accelerator Support and Maintenance Run 14. Maintenance Tomorrow AGS hrs CA Specific Jobs only. AGS hrs CA Specific Jobs only. RHIC.
Maintenance and Accelerator Support RHIC Start Up 12.
Maintenance and Accelerator Support RHIC StartUp10.
Maintenance and Accelerator Support RHIC Start Up 12.
RHIC pp 500 GeV development M. Bai C-A Department.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
Extraction Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.
Maintenance Nov 28, Accelerator Access LINAC will remain on RA. It is not yet running. LINAC will remain on RA. It is not yet running. Booster-
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
RHIC status Chuyu Liu Time meeting Apr. 28, 2015.
All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel.
PIP Update Aug. 21 st Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: B Pellico.
D&D Review 6 August PEP-II Minimal Maintenance State Upkeep Stan Ecklund (J. Seeman, S. DeBarger, D. Kharakh, M. Zurawel)
Booster Shutdown Work - Week 4 Dump and Shielding installation completed Q805/Q806 re-installed, Septum in place Need to align quads and septum before.
Proton Plan PMG 5/25/06 David Harding Booster Correctors Status and CR David Harding.
July 15, 2013 Photo by Greg Vogel. Shutdown Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster.
All Experimenters’ Meeting September 23, Accelerator Operation Summary Calendar Week # 38 NuMI Weekly Integrated Intensity 4.57 E18 protons BNB.
19 January 2006 PS&SPS DAYS AD equipment tests and startup with beam Slide 1 AD and AD experimental areas: equipment tests and startup with beam Tommy.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
PIP Update March 6 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
All Experimenters’ Meeting November 25, 2013 Photo by Martin Murphy.
Run 10 Start-up Status
July 29, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Trying to.
March 7 th Shutdown Shutdown Begins: Monday morning, March 7 th :00 Beam OFF Safety System Testing 08:00 Rack out KRSS, switch MI house power to.
Accelerator Support and Maintenance Startup for Run 13.
Accelerator Support and Maintenance Startup13. Access LIPA work Friday LIPA taking feed for Booster MMPS down for emergency repair. LIPA taking feed for.
18/March/2008OP-days S.Mataguez / O.Hans1 Hardware Problems in the PS complex LINAC 2 BOOSTER PS AD Thanks to all that helped and provided information,
Maintenance and Efficiency
Alexander Herlert, CERN (PH-SME-IS)
The Fermi National Accelerator Laboratory is a U. S
2003 test beam with 25 ns bunched muons
Qweak Coordination Meeting
PQB Meeting March 05, 2009.
Extraction Michael Bevins May 17, 2007
AVAILABILITY PERFORMANCE
Presentation transcript:

Maintenance and Accelerator Support RHIC run10

Last Wednesday: Nice recovery Nice recovery Good work all especially: Good work all especially: HP, RF, Power Supply, Beam Components, Vacuum HP, RF, Power Supply, Beam Components, Vacuum Early Startup of injectors paid off- Early Startup of injectors paid off- Transport magnet p.s. failure detected early and repaired Transport magnet p.s. failure detected early and repaired RHIC tunnel was closed by 1530 for equipment checkout- also paid off RHIC tunnel was closed by 1530 for equipment checkout- also paid off Magnet water leak was found early Magnet water leak was found early RHIC beam by 1900 and Physics ~2100 RHIC beam by 1900 and Physics ~2100

Major jobs RHIC: RHIC: Orbit corrector installation at Irs Orbit corrector installation at Irs Partially completed- revisit 8 o’clock magnet installation. Partially completed- revisit 8 o’clock magnet installation. AGS: AGS: Siemens MG bearing repair completed Siemens MG bearing repair completed Polarimeter testing- will continue Polarimeter testing- will continue

Next Maintenance Similar Schedule to last week Similar Schedule to last week May have CA only in some areas May have CA only in some areas When submitting jobs, examine scope carefully. When submitting jobs, examine scope carefully. Include support needed Include support needed Access needs Access needs HP needs HP needs Any modifications Any modifications

Scheduling Meeting 1430 here next Monday 1430 here next Monday Attendance by all groups is key to success Attendance by all groups is key to success Those needing access should attend to avoid missing access windows Those needing access should attend to avoid missing access windows