Station Board EVLA F2F Meeting: December 2007. Dave FortEVLA F2F Meeting: 11/12 December 20072 Outline Station Board Review Station Board Status Delay.

Slides:



Advertisements
Similar presentations
Test Builder & Test Executor Sonja Vrcic Socorro, December 12, 2007.
Advertisements

FPGA Configuration. Introduction What is configuration? – Process for loading data into the FPGA Configuration Data Source Configuration Data Source FPGA.
Managing Your Network Environment © 2004 Cisco Systems, Inc. All rights reserved. Managing Cisco IOS Devices INTRO v2.0—9-1.
David Hawkins Exascale Signal Processing for Millimeter-Wavelength Radio Interferometers David Hawkins
ITE PC v4.0 Chapter 1 1 Operating Systems Computer Networks– 2.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Uli Schäfer JEM Status and plans Hardware status JEM0 Hardware status JEM1 Plans.
JEM upgrades and optical data transmission to FEX for Phase 1 Andi E. & Uli S. Uli Schäfer 1.
Uli Schäfer 1 JEM: Status and plans JEM1.2 Status Test results Plans.
Uli Schäfer 1 Production modules Status Plans JEM: Status and plans.
Climate Monitoring WEB Interface Using 1_Wire™ Sensors Imad Hoteit Hassan Wehbe.
DSP Implementation of a 1961 Fender Champ Amplifier James Siegle Advisor: Dr. Thomas L. Stewart March 11, 2003.
Uli Schäfer 1 JEM1: Status and plans power Jet Sum R S T U VME CC RM ACE CAN Flash TTC JEM1.0 status JEM1.1 Plans.
Target Controller Electronics Upgrade Status P. Smith J. Leaver.
Using FPGAs with Embedded Processors for Complete Hardware and Software Systems Jonah Weber May 2, 2006.
Students: Nadia Goshmir, Yulia Koretsky Supervisor: Shai Rozenrauch Industrial Project Advanced Tool for Automatic Testing Final Presentation.
The Prototype Correlator Sonja Vrcic Socorro, 5. December, 2006.
System Testing There are several steps in testing the system: –Function testing –Performance testing –Acceptance testing –Installation testing.
WorkPlace Pro Utilities.
P. Dewdney Herzberg Institute of Astrophysics National Research Council Canada EVLA Corr Schedule & Risk Issues.
WIDAR Prototype Testing User Interface Software Kevin Ryan NRAO-DRAO Face-to-Face Meeting April 3, 2006.
What is Software Testing? And Why is it So Hard J. Whittaker paper (IEEE Software – Jan/Feb 2000) Summarized by F. Tsui.
50mm Telescope ACS Course Garching, 15 th to 19 th January 2007 January 2007Garching.
FPGA IRRADIATION and TESTING PLANS (Update) Ray Mountain, Marina Artuso, Bin Gui Syracuse University OUTLINE: 1.Core 2.Peripheral 3.Testing Procedures.
TMDB delay and production plan Augusto. TMDB Prototype Status The prototype boards almost fully assembled should be delivered this week ( May 5 th ) First.
System Analysis (Part 2) The System Development Life Cycle Problem Selection and Feasibility Study.
AGATA Pre-processing team report AGATA Week, July 2008.
David Cussans/Scott Mandry, NIKHEF, October 2008 TLU v0.2.
SunGuide® Software Development Project Release 4.3 Express Lanes Enhancements Design Review December 15, 2009 December 15, 20091R4.3 Design Review.
Level 3 Muon Software Paul Balm Muon Vertical Review May 22, 2000.
Real Time Correlator in FPGA Xu ZhiJun, Zhang XiuZhong Shanghai Astronomical Observatory China 4 th IVS General Meeting January 9, 2006.
High Speed Digital Systems Lab Asic Test Platform Supervisor: Michael Yampolsky Assaf Mantzur Gal Rotbard Project Midterm Presentation One-Semester Project.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
V. Serbo, SLAC ACAT03, 1-5 December 2003 Interactive GUI for Geant4 by Victor Serbo, SLAC.
System Analysis (Part 3) System Control and Review System Maintenance.
Pre-OTS Testing in Penticton Sonja Vrcic Socorro, December 11, 2007.
Systems Life Cycle A2 Module Heathcote Ch.38.
Software Status Sonja Vrcic Socorro,
Microsoft Project – Tutorial 4 Leveling Overallocations In some cases, a resource could be assigned more work in a given time period than it has working.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Sean M. Dougherty Dominion Radio Astrophysical Observatory Herzberg Institute of Astrophysics National Research Council Canada The WIDAR Correlator.
WIDAR Real-Time Data Display D. Del Rizzo EVLA Correlator Software f2f April 3-6, 2006.
Statistics 1670 components 5839 solder joints 4 routing layers 6 power planes 1858 vias total trace length 35 m dimensions 220 x mm 3 FPGA’s (1.
Status and Improvements of TDCB project TDAQ working group meeting Andrea Burato (INFN Pisa) On behalf of TDCB working group.
1 GTK-WG Meeting, CERN, Apr 1st 2014, A. Cotta Ramusino for INFN and Dip. Fisica FE “off-detector” readout electronics for the Gigatracker: status update.
Status of NA62 straw electronics Webs Covers Services Readout.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
PAM Module PAM-Integration Amongst Systems COA NTES Train Running Data PAM COA Exceptional Information PRS Exceptions: Rescheduling Cancellation Origin.
Station Board Testing EVLA Correlator S/W F2F 3-4 April 2006 D. Fort.
Configuration Mapper Sonja Vrcic Socorro,
Shiuan-Hal,Shiu To-do-list and schedule 1. Things need to do before beam comes 2 Generate new trigger matrix for test beam base on the final geometry.(1)
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
P08311: FPGA Based multi-purpose driver / data acquisition system Sponsor: Dr. Marcin Lukowiak Team MemberDisciplineRole Andrew FitzgeraldCEProject Manager/FPGA.
SPI NIGHTLIES Alex Hodgkins. SPI nightlies  Build and test various software projects each night  Provide a nightlies summary page that displays all.
Correlator GUI Sonja Vrcic Socorro, April 3, 2006.
TEL62 update Franco Spinella INFN-Pisa 28/3/2012 CERN- TDAQ WG.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
XTRP Software Nathan Eddy University of Illinois 2/24/00.
Software Requirements for the Testing of Prototype Correlator Sonja Vrcic Socorro, December 11, 2007.
AHCAL Electronics. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE Days DESY Hamburg, March 31st, 2009.
Master Correlator Control Computer (MCCC) Requirements & Status Sonja Vrcic Socorro, December 12, 2007.
Software tools for digital LLRF system integration at CERN 04/11/2015 LLRF15, Software tools2 Andy Butterworth Tom Levens, Andrey Pashnin, Anthony Rey.
T Project Review Sotanorsu I2 Iteration
WIDAR Correlator Options and Potential Craig Walker NRAO Socorro U.S. VLBI Technical Coordination Meeting May 14-15, 2007.
Data Examination and Checking Programs--Requirements B. Carlson
Software Overview Sonja Vrcic
Networking for Home and Small Businesses – Chapter 2
Dump Control, Delay Models
VCI Overview Sonja Vrcic
Networking for Home and Small Businesses – Chapter 2
Presentation transcript:

Station Board EVLA F2F Meeting: December 2007

Dave FortEVLA F2F Meeting: 11/12 December Outline Station Board Review Station Board Status Delay Module Status Filter FPGA Status FORM Status CMIB Status GUI Status RTDD Status IDIFF Status Testing Status Testing Schedule

Dave FortEVLA F2F Meeting: 11/12 December Review

Dave FortEVLA F2F Meeting: 11/12 December Station Board Status Tests needed to proceed with the new board completed Two new boards are being manufactured now –Quoted delivery is 11 January 2008 VSI FPGAs will be installed on one board at DRAO –Both types have to be tested. Board Testing should take one week if nothing is wrong –Uses CRC and TIC measurements, FIR comparisons,... –The board without the VSI FPGAs needs external PPSCODE JTAG test development could take another week or two –Need to decide whether Delay Module is installed for test. The next 14 boards could be done with or without JTAG –Could be delivered by 01 April 2008

Dave FortEVLA F2F Meeting: 11/12 December Delay Module Status Old Delay Module works but too expensive –Functional tests complete for ‘4’-bit samples New Delay Module undergoing tests now –First tests to decide when to manufacture 32 more –Only address lines untested May need to move termination resistors away from FPGA –Needed to allow replacement of faulty FPGA => re-spin Need to be complete at same time as the 14 Station Boards –End of March 2008

Dave FortEVLA F2F Meeting: 11/12 December Filter FPGA Status Data output agrees with simulation (using radar mode) –All stages tested –All measurements tested –Delay, side-band flipper, RFI excisor, re-quantizer tested –8-bit, mixer, fractional bit not yet tested All 36 give the same results when configured the same –They do this for hours Not too sure how stage scaling will be done OTS –Does sampler have AGC? –Dynamic? CMIB?

Dave FortEVLA F2F Meeting: 11/12 December FORM Status FORM interface with Station Board works well. ICD needs small updates. OTS requires FORM firmware and software updates along with testing in NM.

Dave FortEVLA F2F Meeting: 11/12 December CMIB Status Performing well - a few minor things left. Will require some work for new PCB. –Timing FPGA PPSCODE (embedded delays) –Timing FPGA DUMPTRIG (expansion to 16 generators) –MCB (more ADC values) Testing Delay Module Test Vector Models –For testing prototype system well before OTS Testing actual polynomial models –before OTS testing –Probably does not need to involve hardware

Dave FortEVLA F2F Meeting: 11/12 December GUI status Performs well Nearly complete for testing purposes –Ability to save a board configuration needs minor fixes Ability to run a single test may be built in –Pre-cursor to Test Executor

Dave FortEVLA F2F Meeting: 11/12 December RTDD Status Real Time Data Display by Dave Del Rizzo The RTDD receives all output tables and performs well. Some minor changes are needed and more testing is required.

Dave FortEVLA F2F Meeting: 11/12 December IDIFF Status Will be used soon in its current form –Can manually edit files to remove non matching records for now –Can all attributes be requested now? Will require Intelligent diff that compares records with the same observation time for testing of multiple boards –Maybe end of April 2008

Dave FortEVLA F2F Meeting: 11/12 December Testing Status Of 90 hardware functions to be tested (TVP) –67 (75%) are complete –12 (13%) are nearly complete –11 (12%) have not been tested Of 42 software functions to be tested (TVP) –6 (14%) are complete –19 (45%) are nearly complete –17 (41%) have not been tested

Dave FortEVLA F2F Meeting: 11/12 December Testing Schedule Continue functional testing of old boards –Until new boards arrive – middle of January 2008 Test new boards for PCB errors to give go-ahead for 14 more –Possibly complete JTAG test for 14 new boards –End of January 2008 Functional testing of new boards –Complete by end of March 2008 Begin testing of 14 new boards when they arrive. –Basic tests –Develop canned tests –Eventually needs Test Executor - middle of April 2008

Dave FortEVLA F2F Meeting: 11/12 December Summary Delay Module manufacture go-ahead JTAG test vectors for new board Complete hardware-CMIB/GUI testing Add single test ability to GUI Complete hardware functional tests Complete Timing FPGA changes 14 board manufacture go-ahead Complete FORM interface to Station Board Complete RTDD repairs and testing Delay Module Test Vector execution tests Polynomial models execution tests Intelligent Diff with time-tag comparison 14 board with new Delay Module testing Test Executor Begin prototype system testing