Activity Certification Committee Charles Gentile On behalf of the NSTX-U ACC Princeton Plasma Physics Laboratory NSTX Upgrade Project Readiness for Operations.

Slides:



Advertisements
Similar presentations
PPPL,NFRI Study of Error Field and 3D Plasma Response in KSTAR J.-K. Park 1, Y. M. Jeon 2, In collaboration with J. E. Menard 1, K. Kim 1, J. H. Kim 2,
Advertisements

Potential Upgrades to the NBI System for NSTX-Upgrade SPG, TS NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U.
Study of tearing mode stability in the presence of external perturbed fields Experimental validation of MARS-K/Q and RDCON codes Z.R. Wang 1, J.-K. Park.
NSTX-U T&T TSG Contributions to FY15 JRT NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U.
Team Meeting April 25, 2014 NSTX-U Construction Progress NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U.
Machine Installations and Construction Management Erik D. Perry Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318.
NSTX-U Engineering Operations January 28, 2015 NSTX-U Engineering Operations Al vonHalle January 28, 2015 NSTX-U Supported by Culham Sci Ctr York U Chubu.
Operations Notes Updates Since Last Team Meeting Stefan Gerhardt NSTX Team Meeting B318 January 3 rd, 2013 NSTX-U Supported by Culham Sci Ctr York U Chubu.
NSTX Team Meeting June 25, 2010 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
Machine Installation and Construction Management Erik D. Perry Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318.
NSTX-U FWP 2015 Budget Planning Meeting-NSTX Upgrade Status- Ron Strykowsky – 4/10/ NSTX Upgrade Progress Overview Ron Strykowsky Erik Perry, Tim.
NSTX NSTX Team Meeting Jan. 3, 2013 NSTX Team Meeting Jan. 3, 2013 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
NSTX Team Meeting May 28, 2008 Supported by Office of Science College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL.
Quality Assurance Readiness for Operations Review Judy Malsbury, Head of QA Princeton Plasma Physics Laboratory NSTX Upgrade LSB B318 December 9-11, 2014.
NSTX-U Transition to Operations Al vonHalle Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318 October 2 nd & 3.
NSTX-U Diagnostic Installations S.P. Gerhardt, B. Stratton, R. Kaita With help from A. von Halle, E. Perry, F. Jones NSTX-U Supported by Culham Sci Ctr.
Sustainment and Control Chapter Status Stefan Gerhardt 12/5/12 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
ISTP (and other…) Update Stefan Gerhardt NSTX-U Monday Physics Meeting Feb. 20, 2015 B318 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
XP1518: RWM PID control optimization based on theory and experiment S. A. Sabbagh, J.W. Berkery, J.M Bialek Y.S. Park, (et al…) Department of Applied Physics,
EP-TSG session Meeting agenda et al. M. Podestà NSTX-U Research Forum 2015 EP-TSG session PPPL, Room B252 02/24/2015 NSTX-U Supported by Culham Sci Ctr.
Current status of high k scattering system J. Kim 1, Y. Ren 2, K-C. Lee 3 and R. Kaita 2 1) POSTECH 2) PPPL 3) UC Davis NSTX Monday Physics Meeting LSB-318,
NSTX-U Collaboration Status and Plans for: Charged Fusion Product Diagnostic FIU Werner U. Boeglin Ramona Perez, Alexander Netepenko, FIU D.S. Darrow PPPL.
1 Update on Run Schedule R. Raman NSTX Team Meeting PPPL, Princeton, NJ, 08 February, 2006 Work supported by DOE contract numbers DE-FG02-99ER54519 AM08,
RF Operations: Commissioning the RF systems and antenna conditioning J. Hosea et al. NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Hebrew.
College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics New York U Old Dominion U ORNL.
Radiative divertor with impurity seeding in NSTX V. A. Soukhanovskii (LLNL) Acknowledgements: NSTX Team NSTX Results Review Princeton, NJ Wednesday, 1.
NSTX Team Meeting July 21,, 2011 NSTX TF Update NSTX Team Meeting July 21, 2011 NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
Prototype Multi-Energy Soft X-ray Diagnostic for EAST Kevin Tritz Johns Hopkins University NSTX-U Monday Physics Meeting PPPL, Princeton, NJ June 25 th,
Direct measurement of plasma response using Nyquist Contour Z.R. Wang 1, J.-K. Park 1, M. J. Lanctot 2, J. E. Menard 1,Y.Q. Liu 3, R. Nazikian 1 1 Princeton.
NSTX-U Program Update J. Menard NSTX-U Team Meeting B318 May 7, 2013 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto.
NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Inst for Nucl.
ASC SPG NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Inst.
ASC Five Year Plan Chapter Status Stefan Gerhardt NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu.
Wave Heating and Current Drive TSG: XMP for Recomissioning the HHFW System R.J. Perkins, J. C. Hosea Theory & Modeling: N. Bertelli NSTX-U Supported by.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
NSTX-U Construction Erik Perry Princeton Plasma Physics Laboratory NSTX Upgrade Readiness to Operate Review LSB B318 December 9-11, 2014 NSTX-U Supported.
1 Roger Raman for the NSTX Research Team University of Washington, Seattle NSTX Run Usage 27 February – 5 May, 2006 NSTX Mid-Run Assessment PPPL, Princeton,
M&P TSG Prioritization for FY2015 and campaign startup M.A. Jaworski, C.H. Skinner, R. Kaita NSTX-U Science and Topical Science Group organizational meeting.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
NSTX-U Collaboration Status and Plans for: X Science LLC Ricky Maqueda NSTX-U Collaborator Research Plan Meetings PPPL – LSB B318 April / May 2014 NSTX-U.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by Vacuum Pumping, Gauging and RGA Systems W. Blanchard Princeton Plasma.
Safety Jerry Levine Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318 May 2 - 3, 2012 NSTX-U Supported by Culham.
Macroscopic Stability TSG Pre-forum Meeting #1 J.W. Berkery Department of Applied Physics, Columbia University, New York, NY NSTX-U Supported by Culham.
NSTX Team Meeting February 7, 2007 Supported by Office of Science College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U.
EP-TSG: draft plans for commissioning & first research phases of NSTX-U operation M. Podestà, D. Liu, N. Gorelenkov, N. Crocker for the NSTX-U EP-TSG Pre-Forum.
Development and characterization of intermediate- δ discharge with lithium coatings XP-919 Josh Kallman XP Review - ASC Feb 2, 2009 NSTX Supported by College.
NSTX-U Collaboration Plans for UCLA PI: Neal A. Crocker Co-PI: Prof. Troy Carter Grad. Student (planned 2 nd year onward) PPPL Research Contacts and Collaborators:
NSTX Team Meeting December 21, 2009 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
NSTX-Upgrade Magnetics And Related Diagnostics SPG NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
NSTX NSTX Team Meeting May 7, 2013 NSTX Team Meeting May 7, 2013 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
First results of fast IR camera diagnostic J-W. Ahn and R. Maingi ORNL NSTX Monday Physics Meeting LSB-318, PPPL June 22, 2009 NSTX Supported by College.
NSTX NSTX TF, PF and umbrella Upgrade Internal ReviewFeb 24, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
NSTX Team Meeting June 30, 2009 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
NSTX-U Disruption PAM Working Group – Controlled Shutdown XP Discussion S. A. Sabbagh and R. Raman Department of Applied Physics, Columbia University,
NSTX NSTX Team Meeting –Masa Ono August 15, 2014 NSTX-U Team Meeting December 4, 2014 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.
Planning for Toroidal Lithium Divertor Target for NSTX and Supporting Experiments on CDX-U/LTX R. Kaita Boundary Physics Science Focus Group Meeting July.
Upgrades to PCS Hardware (Incomplete) KE, DAG, SPG, EK, DM, PS NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.
Presently Planned Vacuum-Side Diagnostics for the NSTX-Upgrade Center Column NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
Preliminary Results from XP1020 RFA Measurements J.W. Berkery Department of Applied Physics, Columbia University, New York, NY, USA NSTX Monday Physics.
NSTX NSTX Team Meeting –Masa Ono August 15, 2014 NSTX-U Team Meeting August 15, 2014 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.
NSTX-U Collaboration Status and Plans for: M.I.T. Plasma Science and Fusion Center Abhay K. Ram, Paul Bonoli, and John Wright NSTX-U Collaborator Research.
Monitoring impact of the LLD Adam McLean, ORNL T. Gray, R. Maingi Lithium, TSG group preliminary research forum PPPL, B252 Nov. 23, 2009 NSTX Supported.
Research Operations Update Stefan Gerhardt NSTX-U Team Meeting B-318 December 4 th, 2014 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
Comments on HC Measurements for NSTX- Upgrade SPG CS Upgrade Meeting 11/2/11 NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
Neutron diagnostic calibration transfer XMP D. Darrow and the NSTX Research Team XMP & XP review meeting Control Room Annex June 11, 2015 NSTX-U Supported.
NSTX Team Meeting April 5, 2006 Supported by Office of Science College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL.
Profiles Variations in NSTX-U and their Potential Impact on Equilibrium and Stability Magnetoboss 12/6/2013 NSTX-U Supported by Culham Sci Ctr York U Chubu.
NSTX NSTX Upgrade Project – Final Design ReviewJune 22-24, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
Presentation transcript:

Activity Certification Committee Charles Gentile On behalf of the NSTX-U ACC Princeton Plasma Physics Laboratory NSTX Upgrade Project Readiness for Operations Review LSB B318 December 9-11, 2014 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Inst for Nucl Res, Kiev Ioffe Inst TRINITI Chonbuk Natl U NFRI KAIST POSTECH Seoul Natl U ASIPP CIEMAT FOM Inst DIFFER ENEA, Frascati CEA, Cadarache IPP, Jülich IPP, Garching ASCR, Czech Rep Coll of Wm & Mary Columbia U CompX General Atomics FIU INL Johns Hopkins U LANL LLNL Lodestar MIT Lehigh U Nova Photonics Old Dominion ORNL PPPL Princeton U Purdue U SNL Think Tank, Inc. UC Davis UC Irvine UCLA UCSD U Colorado U Illinois U Maryland U Rochester U Tennessee U Tulsa U Washington U Wisconsin X Science LLC

NSTX-U NSTX Upgrade Project – Readiness to Operate Review– December 9-11, Presentation Outline Requirement for conducting an NSTX-U ACC Review Charge by ES&H Executive Board Chairman Charge by Readiness for Operations Review Panel ACC Process – A work in progress Reviews (Sub-systems, administration, walk down) Path Forward

NSTX-U NSTX Upgrade Project – Readiness to Operate Review– December 9-11, Requirement for ACC Review of NSTX-U The main goal of the NSTX-U device is to investigate the scientific principal of the spherical torus (ST) plasma The NSTX-U is classified as a “High Hazard” (non nuclear) operation per PPPL ES & HSD 5008 High Hazard projects at PPPL require ACC review & and recommendation prior to issuance of Safety Certificate For NSTX-U this review started ~ 18 months ago

NSTX-U NSTX Upgrade Project – Readiness to Operate Review– December 9-11, NSTX-U Activity Certification Committee Membership Members Stefan Gerhardt - Physics Irving Zatz - Engineering John Lacenere - Engineering Leif Dietrich* - PSO Anthony Indelicato - PSO Al von Halle* - Operations Jerry Levine* - Safety Charles Gentile* - ACC Chair Resource Members Ron Strykowsky – NSTX-U Jon Menard - Physics Tracy Estes - PSO Tim Stevenson - Engineering This group compromises >200 years of MFE experience * members of the NSTX ACC since 1997

NSTX-U NSTX Upgrade Project – Readiness to Operate Review– December 9-11, NSTX-U ACC Process NSTX-U ACC reviews commenced in June 2013 To date, the committee has met twenty two times over the past ~ 18 months to discuss, examine, walk-down, sub-systems associated with machine start up & FY 15 operations, including safety documentation (SAD, FMEA, procedures) Although the reviews are mainly linked to NSTX-U sub- systems, including diagnostics, other areas are reviewed These include training, conduct of operations, radiological protection, industrial safety, fire safety, etc.

NSTX-U NSTX Upgrade Project – Readiness to Operate Review– December 9-11, Sub-Systems Reviewed / Being Reviewed to Date by ACC HIS / Kirk Key System(s) DCPS NBI-2 FCPC / ECS SAD / FMEA’s Operating Procedures Documentation Neutron Calibration Training Diagnostics dTMB Anticipated NSTX-U Safety Certificate – ACC will confirm Safety Certificate envelope & operating limits NSTX-02 Rev14 sub-systems (PTP’s)

NSTX-U NSTX Upgrade Project – Readiness to Operate Review– December 9-11, ACC has sign-off authority in NSTX-U Startup (NSTX-02) NS TX startup procedure OP-NSTX-02 Rev14 establishes the criteria for confirming that pre- operational test and startup activities have been successfully completed prior to combined field coil testing The employment of a master tracking document to identify critical procedures, PTP’s, and ISTP’s has been successful during the startup phase of past experiments at D-site OP-NSTX-02 Rev 14 tracks the status of the pre-operational test of the following NSTX systems; Torus Vacuum Pumping System, Torus pump-down and Testing, Coil Systems and Associated Hardware, AC Power Systems, Motor Generator Sets, Water Systems, Control Systems, NTC Safety Interlock Systems, Energy Conversion Systems, Diagnostic and in- vessel Probe Systems, RF Systems, Preparation of the machine areas, and the Integrated System Testing of all the NSTX-U work breakdown structure elements OP-NSTX-02 Rev14 provides a “master list” status of the completeness of the NSTX PTP’s and ISTP Applicable components of OP-NSTX-02 Rev14 must be successfully prior to the commencement of coil (combined fields) testing leading to startup and operations

NSTX-U NSTX Upgrade Project – Readiness to Operate Review– December 9-11, Charge for NSTX-U ACC from Chair of the PPPL ES&H Executive Board January 24, 2013 To: Charlie Gentile, Stefan Gerhardt, John Lacenere, Al von Halle, Jerry Levine, Leif Dietrich, Anthony Indelicato –From Adam Cohen, Deputy Director of Operations As part of the plans for the start-up of NSTX-U, the NSTX Activity Certification Committee (ACC) is charged as follows: –Conduct a safety review of the NSTX-U for the purpose of making recommendations to the PPPL ES&H Executive Board regarding issuing a Safety Certificate for NSTX-U in accordance with ESHD 5008 Section 11 Chapter 2. –In conducting this interview, you should consult with managers and staff from the NSTX-U Project as well as other subject matter experts as the ACC deems appropriate. The review should also include physical walk downs of the NSTX sub-systems and facilities. Any such walk downs must be coordinated with the work control center in accordance with our procedures to eliminate to the extent possible any impact to the Upgrade Project schedule. –Your review should include: The NSTX Safety Assessment Document (SAD) as revised for NSTX-U Sub-system Preoperational test procedures (PTP’s), plans, and any necessary emergency response actions. Operating procedures relevant to the safe conduct of operations. Applicable qualifications or certifications of operators. In your recommendation, please advise as to any necessary special conditions of constraints on which the issuance of a Safety Certificate would be based.

NSTX-U NSTX Upgrade Project – Readiness to Operate Review– December 9-11, Charge to Readiness for Operations Review Panel (Items 4 & 5 - ACC Process Effectiveness) Does the PPPL Activity Certification Committee (ACC) process ensure that configuration changes are adequately reviewed and appropriately documented in the NSTX-U Safety Assessment Document (SAD) and Safety Certificate? Does the PPPL Activity Certification Committee (ACC) process, including approval to proceed by the PPPL ES&H Executive Board Chairperson, ensure that PPPL is indeed ready to begin NSTX-U operations?

NSTX-U NSTX Upgrade Project – Readiness to Operate Review– December 9-11, Activity Certification Committee Current Reviews & Planned Reviews Underway NSTX–U Safety Assessment Document (SAD) Failure Modes Effects Analysis (FMEA’s) Pre-Operational Test Procedures (PTP’s), Integrated System Test Procedure (ISTP), Operating Procedures, other applicable documents A review of complete NSTX-U physical plant and sub-system walk-downs.

NSTX-U NSTX Upgrade Project – Readiness to Operate Review– December 9-11, ACC NSTX Startup Activities ACC Review for coil testing activities. ACC presence will be in the NSTX-U Control Rooms during various aspects of startup OP-NSTX-02 Rev14 establishes criteria for confirming that NSTX is ready for specific level of operation. ACC must concur ACC has effected operational changes in the past ( dow-therm, n- calibration, etc) ISTP-01 Coil Testing Requires: –Applicable sections of OP-NSTX-02 Rev14 be complete –The SIS / HIS system in place and tested –Appropriate training for operations personnel

NSTX-U NSTX Upgrade Project – Readiness to Operate Review– December 9-11, Key NSTX-U ACC Safety Concerns Power supply shielding and isolation is in place Ensure any co-mingling issues are addressed post construction phase Vacuum Vessel windows have protective covers for new configuration Coil system protection. Specifically the DCPS Appropriate (approved) documentation is in place

NSTX-U NSTX Upgrade Project – Readiness to Operate Review– December 9-11, Key NSTX-U ACC Document Control Items NSTX-U must conform with the requirements in accordance with laboratory procedures ATI & RLM for all procedures Documents conform with chain of command (OP-AD-56), and conduct of operations (OP- AD-39) requirements

NSTX-U NSTX Upgrade Project – Readiness to Operate Review– December 9-11, Administrative Procedures ACC will Review Pre-Operations Instruction and Requirements for Writing, Reviewing, and Approving D- Site Procedures. Administrative Control of D-Site Procedures D-Site Conduct of Operations Control of Equipment and System Status (chain of command) D-Site Work Permit System Control of Workplace Cleanliness Around D-Site Experimental Areas D-Site Fire Watch Requirements Rollover Procedure Preparation, Review, and Approval of D-Site Design Changes Control of Temporary Modifications Experimental Proposals for NSTX Operation of the NSTX Access System

NSTX-U NSTX Upgrade Project – Readiness to Operate Review– December 9-11, Training Matrix – ACC is Reviewing Training Records for the Positions The NSTX Training Matrix Three categories of training are planned for operators –General Accessor (unescorted access to work in NSTX-U machine areas) Trained in worker safety (Lockout/Tag out, Confined Space, Basic Electrical Safety, Radiation Safety, etc. Trained on administrative procedures governing NSTX-U configuration control –Subsystem Operators Trained in worker safety Trained on administrative procedures governing NSTX-U configuration control Trained on specific operating procedures relevant to subsystems Instructional discussion with appropriate cognizant engineers “Qualified to operate” checklist reviewed and approved by NSTX Head of Operations –Chief Operating Engineers Trained in worker safety Trained on all administrative procedures associated with NSTX operations Trained on all NSTX-U operating procedures Instructional discussion with appropriate cognizant engineers “Qualified to operate” checklist reviewed and approved by NSTX Head of Operations

NSTX-U NSTX Upgrade Project – Readiness to Operate Review– December 9-11, Safety Interlock Systems – ACC Has Reviewed and is in the Process of Reviewing Testing of the E-Stop System –FCPC / ECS, TCB, Cable Spread Room Area –Test Cell Installations Safety Lockout Device Testing –SLD pressurized to test line/ground switches –NSTX-U SLD Kirk Key Test procedure. Testing NSTX HIS with Areas safe for Access –ECS Critical Interlock Testing Testing HIS Systems with SLD pressurized Operation of the NSTX-U Access System

NSTX-U NSTX Upgrade Project – Readiness to Operate Review– December 9-11, Path Forward Building upon a good technical base ACC reviews are moving forward. ACC members have appropriate expertise for performing review PTP completions are on track The project is working to put the remaining items in place To date…no show stoppers