1 CJK9, Zhangjiajie, China NID-related activities in ITU-T Document number Zhangjiajia, China 8-10 April 2009 Hyoung Jun KIM, Jun Seob LEE

Slides:



Advertisements
Similar presentations
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All The Internet of Things (IoT) aka Machine 2 Machine (M2M) Bilel Jamoussi Chief, Study Groups Department.
Advertisements

The 6th CJK IT Standards Meeting April 10 ~ 12, 2006, Hangzhou, China CJK IT Standards Meeting (Collaboration of Security Activity between CJK On NGN and.
SC38 Liaison Report to SC32 at SC32 meeting, Oct 24-28, 2011 Crete Baba Piprani/Canada SC38  SC32 Liaison 1 ISO/IEC JTC1/SC32/WG2 N1599.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ITU-T Identity Management Update Bilel Jamoussi, Chief, SGD/TSB ITU Abbie Barbir, Q10/17 Rapporteur.
1 9 th CJK NID WG, Beijing, China Status report on USN related activities in ITU-T Q.25/16 Document number Beijing, China July 2009 Hyoung Jun KIM,
Introduction to Object Identifiers (OIDs) France Telecom Orange Olivier Dubuisson 15 June 2009.
DOCUMENT #:GSC15-GTSC-05 FOR:Presentation SOURCE:ITU-T AGENDA ITEM:4.1 NGN, Testing specification and Beyond Chaesub.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ITU-T Focus Group on Cloud Computing Olivier Colas, ITU-T FGCC Vice-Chairman Document No: GSC16-PLEN-45.
DOCUMENT #:GSC15-PLEN-29 FOR:Presentation or Information SOURCE:ITU-T AGENDA ITEM:6.4 Identity Management Jianyong.
DOCUMENT #:GSC15-PLEN-29 FOR:Presentation or Information SOURCE:ITU-T AGENDA ITEM:6.4 Identity Management Jianyong.
Proposal for OID-based M2M Node ID Group Name: WG2 Architecture at TP#8 (Miyazaki, December 2013) Source: Yong-Suk Park, KETI, Meeting.
NID Expert Group Activities in ASTAP Jun Seob Lee Hyoung Jun Kim ETRI, Korea.
Status of Collaborative Team work on H.IDscheme, H.ID-RA and H.IRP Chiaki Ishikawa (TTC)
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ITU-T Focus Group on Smart Grid David Su Vice Chair, Focus Group on Smart Grid Document No: GSC16-PLEN-60.
Committed to Connecting the World ITU-T Cloud Computing standardization activities Dr Chaesub Lee, SG13 Chairman ITU Workshop on "Cloud Computing Standards.
Committed to Connecting the World ITU-T SG13 since the 1 st AFRG Chairman: Chaesub Lee Counsellor: Tatiana Kurakova.
1 CJK10, Beijing, China ORS Implementation using DNS, and Demonstration Document number Beijing, China 22 nd -24 th July 2009 Jong-Pyo Kim, Seung-Jai Yi.
The 6th CJK NGN Working Group Meeting April 10 ~ 12, 2006, Hangzhou, China CJK NGN WG (IP-TV Ad-Hoc Group) Chae Sub Lee
SC38-SC32 Liaison Report Berlin SC32 Plenary, Baba Piprani SC32 N2235 Dated: R1.
1 Status Report on CJK NGN Working Group China Communications Standards Association 9 th CJK meeting April 2009 HeyuanXu, Chairman of NGN-WG.
ITU-T SG16 and JCA-IoT activities
Fostering worldwide interoperabilityGeneva, July 2009 IdM and Identification Systems Arkadiy Kremer ITU-T SG 17 Chairman Global Standards Collaboration.
Status report on CJK NGN Working Group April 9, th CJK Standard Meeting Taesang Choi Chairman of CJK NGN Working Group.
Proposal of ID Resolution Protocol Standard for Multimedia Information Access Services Triggered by Tag-Based Identification Noboru Koshizuka and Youichi.
CJK Standards Collaboration - Brief overview of CJK NID WG HyoungJun Kim Telecommunications Technology Association.
The 6th CJK IT Standards Meeting April 10 ~ 12, 2006, Hangzhou, China CJK IT Standards Meeting (Collaboration of Security Activity between CJK On NGN and.
International Telecommunication Union Results of the first FGFN meeting in Lulea Naotaka MORITA Chairman of FGFN 14 July 2009.
Recent Results of JCA-NID and TSAG Byoung Nam LEE HyoungJun KIM ETRI, Korea.
Jeju Island, Korea, 13 – 16 May 2013Identity Management and Identification Systems GSC17-PLEN-43 ITU-T IDENTITY MANAGEMENT UPDATE Bilel Jamoussi, Chief,
ITU-T Study Group 13 and L1 VPNs Marco Carugi ITU-T SG13 Liaison Officer to IETF CCAMP/VPN WGs Q.2/13 Rapporteur
The 16th CJK NGN-WG Meeting July 22 ~ 24, 2009, Beijing, China 16 th CJK NGN-WG (Standardization on DSN and Future Direction ) Shin-Gak Kang
1 CJK9, Zhangjiajie, China NID OID allocation status and registration process Document number Zhangjiajia, China 8-10 April 2009 JungJung Na
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All TTA activities on ICT and Climate Change Hyoung Jun KIM, Yong-Woon Kim TTA(ETRI) Document No: GSC16-PLEN-30.
History and Summary of N-ID Activities in ITU-T Yong-Woon KIM HyoungJun KIM ETRI, Korea.
Flavio Cucchietti 18 May 2016, Rome Chairman, WP2/20, ITU-T SG20 "IoT and its applications including smart cities and communities (SC&C)" Driving the Internet.
Working Structure and methods for CJK N-iDs Working Group Chae Sub TTA, Korea.
14th CJK NGN-WG (Status of New SG 13) Chae Sub Lee
Future Network Standardization Activities in ISO/IEC JTC1/SC6
Future Network Proposal for Future Network Standardization in ITU-T SG13 14th CJK NGN WG December HyoungJun KIM, ETRI
Proposal for study scope of CJK IPTV-adhoc group
(Tokyo, Japan, 4-5 February 2013)
Candidate Subjects for Collaboration among CJK
Status report on CJK NGN Working Group
OID for Global ID system
Kangchan lee 20th CJK UNIOT-WG (Current Status of Cloud Computing Standardization Acuities in ITU-T) - Update of CJK-UNIOT Kangchan.
Jun Seob Lee Rapporteur of ASTAP NID EG TTA
Status report on CJK NGN Working Group
CJK 10th NGN-WG (Preparation for the next SG13) Chae Sub, Lee
Current Situation of F.MID and H.MID in ITU-T SG16
Yong-Woon KIM Hyoungjun KIM TTA
Yong-Woon KIM HyoungJun KIM TTA
Dec , 2008 Hyeong-Ho Lee, ETRI Jinkyung Hwang, KT
CJK 10th NGN-WG (Follow up IPTV-GSI) Chae Sub, Lee
New Resolution for the Internet of Things (IoT)
28 May ~ 2 June, 2006 HyoungJun KIM TTA/ETRI
Global Collaboration on Future Network Standardization
Global Collaboration on Future Network Standardization
Global Collaboration on Future Network Standardization
ITU-T Study Group 20: Brief overview
28 May ~ 2 June, 2006 Hyoungjun KIM TTA/ETRI
Charles KIM TTA Collaboration Plan for CJK NGN Charles KIM TTA
ITU-T Study Group 17 Security
Recent Standardization Activities on NID
ITU-T SG16 Liaison Officer to CITS
November 2005 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: ISO/IEC JTC1 SC6 Liaison Report Date Submitted:
ITU-T Focus Group Next Generation Network
Nobuo Fujii (GTSC Chair) Rapporteur: Nicole Butler
ITU-T activity in ICT security
Chae-Sub LEE TTA Future Collaboration of CJK NGN-WG Chae-Sub LEE TTA
Hans, KIM TTA Future of NGN Standards - FG NGN and SGs - Hans, KIM TTA
Presentation transcript:

1 CJK9, Zhangjiajie, China NID-related activities in ITU-T Document number Zhangjiajia, China 8-10 April 2009 Hyoung Jun KIM, Jun Seob LEE

2 CJK9, Zhangjiajie, China WTSA-08 Results on NID NID-related activities

3 CJK9, Zhangjiajie, China WTSA-08 Results on NID New Question for NID –Q.12/11, “NID and USN test specification” NID-related Questions in ITU-T SGsQuestionTitleRapporteur 1112NID and USN test specification Yong woon KIM (Korea) 13 3 Requirements and implementation scenarios for emerging services and capabilities in an evolving NGN Marco Carugi (France) 5 Principles and functional architecture for NGN (including ubiquitous networking) Keith Knightson (Canada) 16 21Multimedia architecture Yoshinori Goto (Japan) 22Multimedia applications and services Noah Luo (China) 1712 Abstract Syntax Notation One (ASN.1), Object Identifiers (OIDs) and associated registration John Larmouth (UK) JCA-NID Joint Coordination Activity on Network Aspects of Identification Systems (including RFID) Hyoung Jun KIM (Korea)

4 CJK9, Zhangjiajie, China JCA-NID During last TSAG meeting (Geneva, 2 ~ 9 July 2008) –TSAG endorsed the continuation of the JCA-NID until next TSAG meeting (Geneva, 28 ~ 30 April 2009) –TSAG requested to review its ToR 8 th JCA-NID meeting (Geneva, 26 January 2009) –The term “identification” was clearly defined and changed into “tag- based identification” to avoid overlap with JCA-IdM –ToR was revised to include “Ubiquitous Sensor Network” –Approved “NID terms and definitions” as a third JCA-NID deliverable (JCANID-D-003)JCANID-D-003 New convener –Hyoung Jun KIM (ETRI, Korea)

5 CJK9, Zhangjiajie, China Q.12/11 Title: NID and USN test specification First meeting (19 ~ 23 January 2009) –Future work plan Testing architecture for NID and USN (from the next meeting) Test specification for H.IRP Test specification for X.oid-res –Q.12/11 sent LS to Q.21/16, Q.22/16, Q.12/17, Q.3/13, Q.5/13, Q.25/16, Q.6/17, Q.10/17, Q.11/17, and JCA-NID to invite collaboration –Q.12/11 invited contributions to elaborate on those work items

6 CJK9, Zhangjiajie, China Q.3/13 Y.2213 (X.idserv-reqts) was published in June 2008 No more NID-related work item

7 CJK9, Zhangjiajie, China Q.5/13 Last meeting (12 ~ 23 January 2009) –X.idserv-arch was not updated X.idserv-arch will be consented at the next NGN-GSI meeting (Geneva, 11 ~ 22 May 2009) and SG13 Plenary (22 May 2009)

8 CJK9, Zhangjiajie, China Q.21 and Q.22/16 2 Recommendation was published in August 2008 –F.771 (F.MID), “Service description and requirements for multimedia information access triggered by tag-based identification” –H.621 (H.MID), “Tag-based ID triggered multimedia information access system architecture” 2 Draft Recommendations are ongoing –H.IDscheme, “ID schemes for multimedia information access triggered by tag-based identification” –H.IRP, “ID resolution protocols for multimedia information access triggered by tag-based identification” Last meeting (27 January ~ 6 February) –Q.21 and Q.22/16 decided to wait for the result of Q.12/17 on OID resolution system –Q.21 and Q.22/16 will analyze use case of existing ID schemes

9 CJK9, Zhangjiajie, China Q.12/17 (Joint with ISO/IEC JTC 1/SC 6 WG9) ISO/IEC (X.668) was published as International Standard on December Draft Recommendation are ongoing –X.oid-res (ISO/IEC 29168), “Object Identifier Resolution System” Last meeting (11 ~ 20 February) –Q.12/17 reviewed 1 st Working Draft –Q.12/17 decided to use DNS protocol for general OID resolution process –Q.12/17 will review 2 nd Working Draft on next JTC 1/SC 6 meeting (1 ~ 5 June 2009)