CLIC Workshop 07 CERN, 16-18 October 2007 Instrumentation Working Group In conference room Bldg 354-1-001 Grahame Blair & Thibaut Lefevre.

Slides:



Advertisements
Similar presentations
The ILC low power option Andrei Seryi SLAC ILC08 and LCWS08 November 17, 2008 Photo: Dan Chusid, 2003.
Advertisements

CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
Page 1 Collider Review Retreat February 24, 2010 Mike Spata February 24, 2010 Collider Review Retreat International Linear Collider.
1 ILC Bunch compressor Damping ring ILC Summer School August Eun-San Kim KNU.
Compact Linear Collider. Overview The aim of the CLIC study is to investigate the feasibility of a high luminosity linear e-/e+ collider with a centre.
CARE07, 29 Oct Alexej Grudiev, New CLIC parameters. The new CLIC parameters Alexej Grudiev.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Photon Collider at CLIC Valery Telnov Budker INP, Novosibirsk LCWS 2001, Granada, Spain, September 25-30,2011.
Drive Beam and CTF 3 International Workshop on Linear Colliders 2010 October 22, 2010 Erik Adli, Department of Physics, University of Oslo and CERN Bernard.
16 th June 2008 POSIPOL 2008L. Rinolfi / CERN CLIC e + sources status L. Rinolfi with contributions from F. Antoniou, H. Braun, A. Latina, Y. Papaphilippou,
Beam Instrumentation for Linear Colliders Recap: Why Linear Collider ? What is special about the beam instrumentation of a Linear Collider ? What are the.
R&D Programme for RT Phase Feedback Giulio Morpurgo.
Status of ILC BDS Design Deepa Angal-Kalinin ASTeC/Cockcroft Institute, Daresbury Laboratory Andrei Seryi SLAC National Accelerator Laboratory ILC-CLIC.
Pavel Karataev John Adams Institute for Accelerator Science At Royal Holloway, University of London oPAC Advanced School on Accelerator Optimisation 7-11.
Luminosity expectations for the first years of CLIC operation CTC MJ.
Status of the Rebaselining D. Schulte for the Rebaselining Team D. Schulte, CLIC Rebaselining, October 2013.
27 MAY 2008NANOBEAM A laser-wire scanner for the ATF extraction line Alexander Aryshev, Stewart Boogert, Grahame Blair, Gary Boorman a Lawrence.
CLIC Workshop, CERN Marc Ross, ILC Global Design Effort 1 Content: Reason ILC - PM were there – introductory plenary Tolerances and ‘CTF4’.
CTF3 Probe Beam G. A. Blair Royal Holloway Univ. London CTF3 Meeting, CERN 30 th November 2005 Introduction – UK Context Draft Proposal Future prospects.
DEVELOPMENT OF A BEAM LOSS DETECTION SYSTEM FOR THE CLIC TEST FACILITY 3 T. Lefevre Beam loss monitors for the CLIC Test Facility 3 Preliminary study done.
CLIC Energy Stages Meeting D. Schulte1 D. Schulte for the CLIC team.
CLIC Overview Andrea Latina (APC/FNAL) for the CLIC/CTF3 Collaboration June 10, Low Emittance Muon Collider Workshop, FNAL.
Laser system for ILC diagnostics Sudhir Dixit: The John Adams Institute (Oxford)
ParameterL-bandS-bandX-band Length (m) Aperture 2a (mm) Gradient (Unloaded/Loaded) (MV/m)17/1328/2250/40 Power/structure (MW) Beam.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
Status of the CLIC main beam injectors LCWS, Arlington, Texas, October 22 th -26 th, 2012Steffen Döbert, BE-RF Overview of the CLIC main beam injectors.
Undulator based polarized positron source for Circular electron-positron colliders Wei Gai Tsinghua University/ANL a seminar for IHEP, 4/8/2015.
N. Walker, K. Yokoya LCWS ’11 Granada September TeV Upgrade Scenario: Straw man parameters.
P. Urschütz - CTF3 Collaboration Meeting 2007 CTF3 commissioning & operation in 2006 P. Urschütz for the CTF3 operations team  Commissioning of the Delay.
Injector Options for CLIC Drive Beam Linac Avni Aksoy Ankara University.
S. Bettoni, R. Corsini, A. Vivoli (CERN) CLIC drive beam injector design.
Main and Drive Beam Dynamics Working Group Caterina Biscari, Daniel Schulte Attending people ~ 20 ± 5 Presentations ~ 18 (7 from CERN) CL IC 07.
2 February 8th - 10th, 2016 TWIICE 2 Workshop Instability studies in the CLIC Damping Rings including radiation damping A.Passarelli, H.Bartosik, O.Boine-Fankenheim,
Conventional source developments (300Hz Linac scheme and the cost, Part-II) Junji Urakawa, KEK PosiPol-2012 at DESY Zeuthen Contents : 0. Short review.
B. Foster - Birmingham 7/11 Linear Colliders 1 Future Linear Colliders Brian Foster (GDE - Hamburg/DESY/Oxford) Birmingham Town Meeting.
X-band Based FEL proposal
CLIC Beam instrumentation work shop, CERN, 2 nd & 3 rd of June 2009, Lars Søby BPM overview CLIC instrumentation work shop 2-3 June BPM overview.
Injection System Update S. Guiducci (LNF) XVII SuperB Workshop La Biodola, Isola d'Elba, May 29 th 5/29/111.
O RBIT F EEDBACK EXPERIENCE AT CTF3 Davide Gamba 3 October 2014 Octoberfest at JAI – Royal Holloway University of London.
FCC-ee injector complex including Booster Yannis Papaphilippou, CERN Thanks to: M.Aiba (PSI), Ö.Etisken (Ankara Un.), K.Oide (KEK), L.Rinolfi (ESI-JUAS),
CLIC 09 Workshop - C. Biscari C. Biscari, D. Alesini, A. Ghigo, F. Marcellini, LNF-INFN, Frascati, Italy B. Jeanneret, F. Stulle, CERN, Geneva, Switzerland.
J.P.DelahayeTILC08: 06/ 03/ 081 CLIC-ILC Collaboration? Following visit of CERN (Nov 07)
Sara Thorin, MAX IV Laboratory
Progress on Instrumentation
J. Alexander + Cornell accelerator group Cornell University
ILC - Upgrades Nick Walker – 100th meeting
Particle Colliders at CERN present and future
Status and Interest of the X-ray FEL SINAP
Status of the CLIC main beam injectors
CLIC Damping ring beam transfer systems
CLIC Rebaselining at 380 GeV and Staging Considerations
Have a chance to operate your own beam at CERN
Linac possibilities for a Super-B
Other beam-induced background at the IP
Measurements, ideas, curiosities
Report from the CLIC07 Workshop
CLIC source update CLIC main beam injectors reminder
CLIC Detector studies status + plans
Linear Colliders Lecture 4 The real designs
Status of the CLIC Injector studies
CEPC Injector Damping Ring
LHC (SSC) Byung Yunn CASA.
CLIC Beam Instrumentation
with contributions from
LCLS Commissioning Parameters
Explanation of the Basic Principles and Goals
CLIC Feasibility Demonstration at CTF3
J. Seeman Perugia Super-B Meeting June 2009
CLIC luminosity monitoring/re-tuning using beamstrahlung ?
Presentation transcript:

CLIC Workshop 07 CERN, October 2007 Instrumentation Working Group In conference room Bldg Grahame Blair & Thibaut Lefevre

What need to be measured ? Machine optimization Beam size (  x /  y ) Bunch length (  z ) Beam commissioning Beam Position (x / y) Beam Current I Beam energy E and energy spread  E Beam Phase Machine optimization Machine Protection and minimize radiation Beam losses Luminosity CLIC workshop 07 Instrumentation Working Group CLIC 07

e + injector, 2.4 GeV e - injector 2.4 GeV CLIC 3 TeV e + main linac e - main linac, 12 GHz, 100 MV/m, 20.8 km BC1 e + DR 365m e - DR 365m booster linac, 9 GeV, 2 GHz or 4 GHz ? decelerator, 24 sectors of 868 m IP1 drive beam accelerator 2.38 GeV, 1.0 GHz combiner rings Circumferences delay loop 72.4 m CR m CR m CR1 CR2 delay loop 326 klystrons 33 MW, 139  s 1 km CR2 delay loop drive beam accelerator 2.38 GeV, 1.0 GHz 326 klystrons 33 MW, 139  s 1 km CR1 TA R= 120 m TA 245 m BDS 2.75 km BDS 2.75 km BC km CLIC workshop 07 Instrumentation Working Group CLIC 07

e + injector, 2.4 GeV e - injector 2.4 GeV BC1 e + DR 365m e - DR 365m IP1 BC2 Final Focus  x : 0.66 mm.mrad  y : 0.02mm.mrad  E/E : 0.35%  x = 40 nm  y = 1 nm Entrance linac  x : 0.60 mm.mrad  y : 0.01 mm.mrad  E/E : 1.5%  z : 45  m (150fs) Damping ring  x : 10 -> mm.mrad  y : 10 -> mm.mrad  E/E : 0.134%  z : 1.5mm (5ps) Main Beam parameters all along the machine In addition, there are very strict tolerances/requirements on the beam position precision and resolution (1  100nm) CLIC workshop 07 Instrumentation Working Group CLIC 07

IP1 CR2 delay loop CR1 Drive Beam frequency multiplication complex  z : 2mm (6.6ps) I : 4.2 – A  b : cm Drive Beam accelerator I : 4.2A ; Qb : 8.4nC :  t : 140  s  : < 100 mm.mrad  E/E : <1%  z : 4mm (13.3ps) 24 Drive Beam decelerators I : 101A ;  t=241ns  : 150 mm.mrad  z : 1mm (3.3ps) 2.38GeV  238MeV Drive Beam parameters all along the machine In addition, there are very strict tolerances/requirements on the beam phase stability CLIC workshop 07 Instrumentation Working Group CLIC 07

Generation Complex Decelerator (24 units) Electrons energy  2.38 GeV2.38  GeV Beam current /charge4.2A / 587  C101A / 24.4  C Total Beam Energy  1.397MJ58  5.8kJ Bunch length6-13ps3.3ps Minimum beam size50  m Charge density nC/cm nC/cm 2 The thermal limit for ‘best’ material (C, Be, SiC) is ~ nC/cm 2 Control of beam loss to prevent beam induced damage (10 -4 ) Use of non-intercepting / non degradable beam diagnostic Drive Beam Parameters This is just the RF source !!! Guarantee the efficient production of 12GHz RF power With a high level of reliability and availability CLIC workshop 07 Instrumentation Working Group CLIC 07

CLIC workshop 07 Instrumentation Working Group CLIC 07

Beam Parameters Main Beam Requirement Main Beam Monitor Drive Beam Requirement Drive Beam Monitor Intensity  Position x,y Energy spread  E/E Bunch length  z Emittance  Beam size  Beam loss Luminosity L Phase stability ~ ? 2 talks on the Beam Instrumentation Requirements 6 talks on Position and Intensity monitoring 3 talks on Short Bunch Length measurements 2 talks on Beam Size monitoring 2 talks on Beam Loss and Machine protection 1 talk on Phase Stability CLIC workshop 07 Instrumentation Working Group CLIC 07

13:40->19:00 Instrumentation Wkg (Convener: Grahame Blair (Royal Holloway, Univ. of London), Thibaut Lefevre (CERN) ) (Location: ) :40 Overview of the CLIC Instrumentation (10') Grahame Blair (RHUL) 13:50 Requirements on the CLIC Drive Beam Instrumentation (20') Erik Adli (CERN) 14:10 Requirements on the Beam Delivery system Instrumentation (20') Rogelio Tomas (CERN) 14:30 From CTF3 to CLIC (20') Thibaut Lefevre (CERN) 14:50 Development of BPM electronics at LAPP (30') Louis Bellier (LAPP) 15:20 BPM Development at CEA/Saclay (10') Wilfrid Farabolini (CEA/SACLAY) 15:30 Coffee Break 15:50 EuroTeV High Precision BPM (20') Lars Soby (CERN) 16:10 EuroTeV High Bandwidth Wall Current Monitor (20') Alessandro D'Elia (CERN) 16:30 The effect of pair backgrounds on the IP stripline BPM (20') Anthony Hartin (Oxford univ) 16:50 Beam halo monitoring (20') Thibaut Lefevre (CERN) 17:10 High precision phase monitoring (20') Alexandra Andersson (CERN) 17:30 CLIC luminosity monitors (10') Thibaut Lefevre (CERN) 17:40 Discussion (1h00') CLIC workshop 07 Instrumentation Working Group CLIC 07

09:00->12:20 Instrumentation Wkg (Convener: Grahame Blair (Royal Holloway, Univ. of London), Thibaut Lefevre (CERN) ) (Location: ) :00 Non-interceptive single shot bunch length measurement (30') Anne Dabrowski (Northwestern Univ.) 09:30 Beam instrumentation development at Uppsala University (30') Arnaud Ferrari (Uppsala Univ.) 10:00 Coherent Diffraction Radation and Applications at CLIC (30') Pavel Karataev (RHUL 10:30 Nano BPM studies and Possiblities for CLIC (20') Stewart Boogert (RHUL) 10:50 Coffee break 11:10 Laser-Wire studies at PETRAIII and ATF2 (20') Grahame Blair (RHUL) 11:30 Beam loss monitoring at CTF3 (10') Thibaut Lefevre (CERN) 11:40 Machine Protection system: Lessons learnt from LHC (20') Eva Barbara Holzer (CERN) CLIC workshop 07 Instrumentation Working Group CLIC 07 Encourage other participants (not mentioned here) to present their work

CLIC workshop 07 Instrumentation Working Group CLIC 07 Identify the Requirements for beam instrumentation Give a status of the present knowledge/development Identify the weak points and their consequences (Propose solution ?) Potentially stimulate new collaborators to join the crew

ParameterSymbol3 TeV1 TeV0.5 TeVILCUnit Center of mass energyE cm GeV Main Linac RF Frequencyf RF GHz LuminosityL cm -2 s -1 Luminosity (in 1% of energy)L 99% cm -2 s -1 Linac repetition ratef rep Hz No. of particles / bunchNbNb No. of bunches / pulsekbkb No. of drive beam sectors / linacN unit Overall two linac lengthl linac km Proposed site lengthl tot km DB Pulse length (total train) tt μsμs Beam power / beamPbPb MW Wall-plug power to beam efficiencyη wp-rf % Total site AC powerP tot 322~ MW Transverse horizontal emittanceγε x nm rad Transverse vertical emittanceγε y 20 40nm rad Nominal horizontal IP beta functionβ*xβ*x mm Nominal vertical IP beta functionβ*yβ*y mm Horizontal IP beam size before pinchσ*xσ*x nm Vertical IP beam size before pinchσ*yσ*y 125.7nm Beamstrahlung energy lossδBδB % No. of photons / electronNγNγ No. of pairs (p T min =20MeV/c, θ min =0.2)N pairs No. of coherent pairsN coh No. of incoherent pairsN incoh Hadronic events / crossingN hadron CLIC workshop 07 Instrumentation Working Group CLIC 07

Beam Parameters CTF3 detector Performances Drive Beam Requirement Drive Beam Monitor Intensity  Position x,y Energy spread  E/E Bunch length  z Emittance  Beam size  Beam loss Luminosity L Phase stability CLIC workshop 07 Instrumentation Working Group CLIC 07

CLICILC Center of mass energy (GeV) Main Linac RF Frequency (GHz)121.3 Luminosity (10 34 cm -2 s -1 )5.92 Linac repetition rate (Hz) 505 Accelerating gradient (MV/m) Proposed site length (km) Total site AC power (MW) Wall plug to main beam power efficiency (%) Comparison between CLIC and ILC Most Critical Beam Parameter CLICILC Bunch Length in the Linac (fs) Typical Beam Size in the Linac (  m)15 Beam size at IP :  x /  y (nm)40/1550/5 CLIC workshop 07 Instrumentation Working Group CLIC 07

Comparison of different BDS systems. Energy bandwidth is defined as energy offset required to double beamsize R. Tomás CLIC workshop 07 Instrumentation Working Group CLIC 07

Adapded from S. Chattopadhyay, K. Yokoya, Proc. Nanobeam `02 The small beam size challenge CLIC workshop 07 Instrumentation Working Group CLIC 07