BCT 100 Overview of the Construction Industry
The Construction Industry What is the ‘Construction Industry’? Who works in this industry? Why is it important?
Construction…. Is misunderstood by the average person Accounts for 16% of the GNP in the US Is an ever evolving industry
Construction is influenced by: Materials Available Knowledge/Innovation of the builders Skills Available in the Labor Force Needs and Functions of the Proposed Structure Desires of the Building Owners Climate Research and Development of New Technologies
Categories of Construction Residential Buildings Nonresidential Buildings Engineering Facilities Industrial Facilities
Residential Buildings Structures which house people. Single and Multi Family structures. Apartments, Townhouses, Retirement Homes, Assisted Living, Condominiums
Residential Buildings Modern Residential Design Has Few Limits
Non-Residential Buildings Institutional, Educational, Commercial (Hotels, Restaurants, Bars, etc), Religious, Agricultural, Recreational, Medical
Non-Residential Buildings Institutional, Educational, Commercial (Hotels, Restaurants, Bars, etc), Religious, Agricultural, Recreational, Medical
Non-Residential Buildings Institutional, Educational, Commercial (Hotels, Restaurants, Bars, etc), Religious, Agricultural, Recreational, Medical
Engineering Facilities Infrastructure (Dams, Tunnels, Bridges, Highways, Canals), Utilities, Treatment Plants, Marine Structures
Engineering Facilities Infrastructure (Dams, Tunnels, Bridges, Highways, Canals), Utilities, Treatment Plants, Marine Structures
Industrial Facilities Heavy Industry. Refineries, Chemical Plants, Power Generation Plants, Transmission Lines, Oil Rigs, Smelters
The Variables in Construction Scope of Work Cost Quality of the Construction Time to Complete
The Variables in Construction Scope of Work: How big is your project? Does the size of your project increase once on site? Who is responsible for increasing the size of the project?
The Variables in Construction Cost: What is the budget / Contract Sum? What factors can impact Cost? Who is responsible for increasing the cost of the project?
Cost (con’t) Construction spending in 1988 was estimated at 3.22 trillion dollars In 2007, construction spending was estimated to be near 4.8 trillion dollars 15% of industrial workers employed in the US work in the construction trades On average, 5% of all workers in the United States work in construction and related fields. The current economic downturn has temporarily altered this.
The Variables in Construction Quality: Do Drawings and Specifications indicate level of quality? What factors can impact Quality? Who is responsible for maintaining project quality?
The Variables in Construction Schedule: Does the contract stipulate a completion date? What factors can impact Schedule? Who is responsible for maintaining project schedule?
Schedule Unlike Cost, Scope and Quality, the Contractor may not be able to fully manage and control the project schedule Why?
Some critical items may be beyond the control of the contractor.
The Three Major Elements Engineering Construction Project Management
The Three Major Elements Engineering Includes: Architectural Services, Engineering Services including Structural, Mechanical, Civil, Geotechnical. All Design and Documentation and Specifications
The Three Major Elements Construction Includes: General Contractor, Sub- Contractors such as Plumbers, Electricians, Framers, Concrete, Masons, HVAC installers, Flooring, Tile, Cabinetry, Drywall, Insulation. All Construction and Installation, Hands- On work
The Three Major Elements Project Management Includes: Project Manager, Contract Administrator (Architect), Construction Manager, Owner. All non-construction and non-design based construction administration work, including planning in the beginning, bidding, permitting, approvals, correspondence, change orders, rfi’s, payment certif., etc.
Education – 3 Different Tracks Professional Schools – Architects and Engineers Technical / Professional Education – Project Management / Construction Specialist Hands-on Training / Apprenticeship – Union and Non-Union on the job training
Effective Work Teams “A chain is only as strong as its weakest link” Interaction with others on the team is crucial to success Everyone must be a member of some team We are all members of the ‘Construction Team’
Is There A Productivity Problem? Leibing states that the construction industry has consistently had low productivity when compared to other business sectors Business Roundtable studies What Improves Productivity Why Does Productivity Matter?
Importance of Relationships Construction Companies of all shapes and sizes Vast majority are small, owner-operated, often family run businesses
Project Delivery Systems Traditional Alternative Alternatives in project Contractual Relationships
The Traditional Delivery System
Design / Bid / Build Architect/Owner agree on Program Architectural Design and Documentation Submit to Contractors for Bid Prices Selection of Contractor Contractor Builds based upon bid set Architect oversees work is done according to the drawings and specification Changes are documented and priced as a Change Order
Pros / Cons of Design / Bid / Build Architect maintains total control over the project from inception to completion Time consuming Inefficient to design in a vacuum, bid, then revise design based upon builder input
NST: Negotiated Select Design Team and a Select Construction Team review the documents and value engineer details to agree on a contract price/design. Highest satisfaction ratings from all parties involved.
Pros / Cons of Negotiated Select Architect maintains total control over the project from inception to completion, BUT Works with Builder early to discover potential problems Need a Builder that the Owner can trust No Competitive Pricing
Alternative Delivery Systems
Construction Management Construction Manager is introduced CM represents the interests of the owner CM bridges between the Design Team and the Constructors to identify efficiencies Owner may or may not be contractually related to the Design Team and the Construction Team
Types of Construction Management Construction Manager- For Fee CM is paid a percentage of the construction cost for management services Construction Manager- At Risk CM is paid a percentage of cost, but also, Guarantees Final Maximum Price. Some argue this is a conflict of interest
Pros / Cons of Construction Management (CM) CM works directly with the Owner, representing their interests Intended to reduce supervisory requirement of Architect
Design / Build Design Team and Construction Team work for the same company Bid Phase is replaced with continual evaluation of cost throughout the design and documentation process Owner is contractually related to the Design/Build Team
Pros / Cons of Design Build Accelerates the process, by eliminating bidding Owner no longer has the Architect as an independent commentator on the construction work Design services are usually inferior
Integrated Project Delivery Architect and Constructor review the project goals BEFORE the drawings are produced, working together with the consultants and discuss the ‘Best’ methods, and materials, to achieve the Owner’s requirements, Architect’s intent while keeping an eye on Constructability, Cost, Energy Efficiency and Sustainability
What is Value Engineering? Architect and Constructor review the drawings and discuss the ‘Best’ methods, and materials, to achieve the Architect’s intent while keeping an eye on Constructability and Cost